Consulting-Specifying Engineer - August 2007 - (Page 19) M/E Roundtable (Continued from page 17) GIANNINI: Again, experienced qualified systems integrators have the abilities to provide the appropriate level of programming, together with proven testing protocols, for the sequence of operations needed by the customer. Some of these programs and tests are code driven, and some are driven by the specific needs of the customer. The more experienced systems integrators have knowledge and skills in both of these areas. CONVERY: The sequence of operation for an integrated fire/security system is written and tested the same as other building systems interact with the integrated fire/security system. Operating procedures are developed for each mode of the combined system. Codes and standards define priority reporting. Testing of all components should be conducted to ensure proper installation and function. Because the systems are integrated there may be some redundancy, which can provide time and cost savings. CASAMASSIMA: Historically, authorities having jurisdiction (AHJs) have required that the two systems be tested independently from each other and that security should not interfere with the control aspects of the fire system. CSE: What do you think is the most significant integration challenge and what is a good approach for dealing with it? CASAMASSIMA: The most significant challenge ahead is to integrate the requirements of mass notification with the existing infrastructure. Most networks are control-type functions, so adding an audio component is very challenging. Specifiers should ensure whatever systems they are specifying can support mass notification, both now and as an add-on in the future. GIANNINI: The most significant challenge involves the integration of security technologies that must communicate over existing customer network infrastructures. The use of software development kits has become more common. Having personnel who can develop and write the appropriate scripts/source code for these kits is an important first step. GRILL: Timing of completion can be the most significant challenge. When dealing with life-safety systems, obtaining a temporary certificate of occupancy (TCO) to allow for move in, etc. can be critical. Many AHJs will grant a TCO if a ventilation or security system isn’t completed. However, they won’t grant a TCO if your life safety systems aren’t operational. The design of the systems needs to take this into consideration. It often is impossible to adequately test the life safety function of a fully integrated system without the entire system being complete. CONVERY: One of the most significant challenges is coordination between disciplines. Inherently, security systems are meant to fail secure while fire alarm systems are meant to fail safe. Security system professionals must be careful not to violate life safety code requirements. A close working relationship between security system professionals and fire protection professionals help alleviate this challenge. C S E : Te c h n olo g y i s c o n st a nt ly evolvin g. H ow c an integ ratio n efforts keep up? GRILL: First you have to try to define integration. In my opinion, if your overall fire protection approach isn’t integrated, the owner will not receive the best value or best technical solutions. This doesn’t necessarily mean that all of the low voltage systems are driven by a common control panel. But it does mean that they all have been considered and specified so that they will work together. Getting back to the question, there needs to be continual interaction between suppliers of the various types of systems to ensure that equipment can function appropriately together and not interfere with critical functions. The importance of this interaction and coordination is going to increase as more functions, such as mass notification, are integrated with fire alarm and other building systems. We deliver energy solutions From design and installation to financing and maintenance, Cummins Power Generation Inc. provides turnkey energy solutions around the world for industrial, commercial, horticultural and utility applications. > Reliable on-site prime and peaking power > Cost-efficient cogeneration (CHP) > Waste-to-energy projects using alternative fuels To see how we’ve helped others, download our customers’ stories at www.cumminspower.com/ energysolutions Our energy working for you.TM © 2007 Cummins Power Generation Inc. Input #213 at csemag.com/quickResponse http://www.cumminspower.com/energysolutions http://www.cumminspower.com/energysolutions http://csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - August 2007 Contents M/E Roundtable Giants 100 Pullout Poster Giants Stand Tall: CSE Giants 100 Report Electrical Design for Tall Buildings HVAC and Fire Safety for Elevator Systems How to Beat the Codes GAS Technology Supplement Recovering Waste Heat from Boilers New Applications for Tankless Water Heating Systmes Techniques Improve for Powder Coating MDF New Tools Available for Heat Treating Steel Direct Drive Engines Consulting-Specifying Engineer - August 2007 Consulting-Specifying Engineer - August 2007 - (Page Cover1) Consulting-Specifying Engineer - August 2007 - (Page Cover2) Consulting-Specifying Engineer - August 2007 - (Page 1) Consulting-Specifying Engineer - August 2007 - (Page 2) Consulting-Specifying Engineer - August 2007 - Contents (Page 3) Consulting-Specifying Engineer - August 2007 - Contents (Page 4) Consulting-Specifying Engineer - August 2007 - Contents (Page 5) Consulting-Specifying Engineer - August 2007 - Contents (Page 6) Consulting-Specifying Engineer - August 2007 - Contents (Page 7) Consulting-Specifying Engineer - August 2007 - Contents (Page 8) Consulting-Specifying Engineer - August 2007 - Contents (Page 9) Consulting-Specifying Engineer - August 2007 - Contents (Page 10) Consulting-Specifying Engineer - August 2007 - Contents (Page 11) Consulting-Specifying Engineer - August 2007 - Contents (Page 12) Consulting-Specifying Engineer - August 2007 - Contents (Page 13) Consulting-Specifying Engineer - August 2007 - Contents (Page 14) Consulting-Specifying Engineer - August 2007 - Contents (Page 15) Consulting-Specifying Engineer - August 2007 - Contents (Page 16) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 24) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24A) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24B) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24C) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24D) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24E) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24F) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24G) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24H) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24I) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24J) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24K) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24L) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24M) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24N) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 25) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 26) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 27) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 28) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 29) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 30) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 31) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 32) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 33) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 34) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 35) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 36) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 37) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 38) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 39) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 40) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 41) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 42) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 43) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 44) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 45) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 46) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 47) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 48) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 49) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 50) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 51) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 52) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 53) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 54) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 55) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 56) Consulting-Specifying Engineer - August 2007 - GAS Technology Supplement (Page A1) Consulting-Specifying Engineer - August 2007 - Recovering Waste Heat from Boilers (Page A2) Consulting-Specifying Engineer - August 2007 - Recovering Waste Heat from Boilers (Page A3) Consulting-Specifying Engineer - August 2007 - Recovering Waste Heat from Boilers (Page A4) Consulting-Specifying Engineer - August 2007 - New Applications for Tankless Water Heating Systmes (Page A5) Consulting-Specifying Engineer - August 2007 - Techniques Improve for Powder Coating MDF (Page A6) Consulting-Specifying Engineer - August 2007 - Techniques Improve for Powder Coating MDF (Page A7) Consulting-Specifying Engineer - August 2007 - New Tools Available for Heat Treating Steel (Page A8) Consulting-Specifying Engineer - August 2007 - New Tools Available for Heat Treating Steel (Page A9) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page A10) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page A11) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page A12) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page Cover3) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.