Consulting-Specifying Engineer - August 2007 - (Page 56) Specifier’s Notebook T E C H N O L O G Y A N A LY S I S Harnessing the power of web-based boiler control systems BY DAN WILLEMS, Vice President of Product Development, Cleaver-Brooks, Milwaukee eb-enabled advanced boiler control systems have many advantages. And many of these control systems can retrofit into existing boiler systems. But what are the advantages, and what does one need to consider when selecting a system? One advantage that developers of these systems suggest is reduced cost and improved efficiency. With the growing trend toward decentralization of boilers to buildings across a campus or complex, there is a benefit to keeping controllers in one location and monitoring boiler conditions via the web. Web-based controllers give real-time access to operators on boiler room conditions, such as alarms, shutdowns and maintenance reminders. Many systems also send an e-mail or page alert if an alarm goes off so that an operator can address problems immediately, thus controlling and reducing the costs of operation. But a boiler system control must do more than turn your boiler on and off and sound alarms. It needs to monitor an entire boiler room including boiler, burner, deaerator, softeners and other features. With the real-time and historical trending data from web-based controls, operators are positioned to anticipate service needs and troubleshoot problems. Safety, accessibility, integration Safety is the highest priority. Boiler rooms are often cramped, making it difficult to take readings and reach switches. Performing these tasks via the web can be easier and safer for operator and maintenance personnel. But keep in mind web-enabled monitoring does not preclude periodic visual inspections. And control locations should be specified so that controls can be easily accessed manually. W Another important feature is the ability to integrate with the existing building management system. To keep costs in check when buying new boiler room equipment, make sure it already has integrated sensors that will make it easily compatible with your control system. Advanced options But whether boiler controls are web-based or not, new controllers alone save thousands of dollars in energy costs due to the increased efficiencies they bring. When specifying any new boiler control system, the following options dramatically increase fuel efficiency: Parallel positioning: During setup, a boiler is often set with a fixed air-to-fuel ratio. Environmental changes alter that ratio, decreasing Web-based control advantages • Cost reduction and efficiency of monitoring multiple boiler rooms remotely • Real-time access to information on alarms, shutdowns and maintenance needs A growing trend toward decentralization of boilers increases the benefits of remote web monitoring. • Real-time monitoring of equipment such as boiler units, burners, deaerators and softeners. combustion efficiency. Parallel positioning solves this problem by generating less excess oxygen in the stack to ensure complete combustion. O2 trim: Ensures peak efficiency by using an oxygen sensor/transmitter in the exhaust gas. The sensor/transmitter continuously senses oxygen content and provides a signal to the controller, which trims the air damper and/or gas valve, maintaining a consistent oxygen concentration for increased system efficiency. Variable speed drive: VSDs allow a motor to operate only at its required speed rather than a constant 3600 rpm. This speed variance results in the elimination of unnecessary energy consumption saving thousands of dollars a year. 56 Consulting-Specifying Engineer • AUGUST, 2007
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - August 2007 Contents M/E Roundtable Giants 100 Pullout Poster Giants Stand Tall: CSE Giants 100 Report Electrical Design for Tall Buildings HVAC and Fire Safety for Elevator Systems How to Beat the Codes GAS Technology Supplement Recovering Waste Heat from Boilers New Applications for Tankless Water Heating Systmes Techniques Improve for Powder Coating MDF New Tools Available for Heat Treating Steel Direct Drive Engines Consulting-Specifying Engineer - August 2007 Consulting-Specifying Engineer - August 2007 - (Page Cover1) Consulting-Specifying Engineer - August 2007 - (Page Cover2) Consulting-Specifying Engineer - August 2007 - (Page 1) Consulting-Specifying Engineer - August 2007 - (Page 2) Consulting-Specifying Engineer - August 2007 - Contents (Page 3) Consulting-Specifying Engineer - August 2007 - Contents (Page 4) Consulting-Specifying Engineer - August 2007 - Contents (Page 5) Consulting-Specifying Engineer - August 2007 - Contents (Page 6) Consulting-Specifying Engineer - August 2007 - Contents (Page 7) Consulting-Specifying Engineer - August 2007 - Contents (Page 8) Consulting-Specifying Engineer - August 2007 - Contents (Page 9) Consulting-Specifying Engineer - August 2007 - Contents (Page 10) Consulting-Specifying Engineer - August 2007 - Contents (Page 11) Consulting-Specifying Engineer - August 2007 - Contents (Page 12) Consulting-Specifying Engineer - August 2007 - Contents (Page 13) Consulting-Specifying Engineer - August 2007 - Contents (Page 14) Consulting-Specifying Engineer - August 2007 - Contents (Page 15) Consulting-Specifying Engineer - August 2007 - Contents (Page 16) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - August 2007 - M/E Roundtable (Page 24) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24A) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24B) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24C) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24D) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24E) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24F) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24G) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24H) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24I) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24J) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24K) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24L) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24M) Consulting-Specifying Engineer - August 2007 - Giants 100 Pullout Poster (Page 24N) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 25) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 26) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 27) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 28) Consulting-Specifying Engineer - August 2007 - Giants Stand Tall: CSE Giants 100 Report (Page 29) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 30) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 31) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 32) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 33) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 34) Consulting-Specifying Engineer - August 2007 - Electrical Design for Tall Buildings (Page 35) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 36) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 37) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 38) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 39) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 40) Consulting-Specifying Engineer - August 2007 - HVAC and Fire Safety for Elevator Systems (Page 41) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 42) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 43) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 44) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 45) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 46) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 47) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 48) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 49) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 50) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 51) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 52) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 53) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 54) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 55) Consulting-Specifying Engineer - August 2007 - How to Beat the Codes (Page 56) Consulting-Specifying Engineer - August 2007 - GAS Technology Supplement (Page A1) Consulting-Specifying Engineer - August 2007 - Recovering Waste Heat from Boilers (Page A2) Consulting-Specifying Engineer - August 2007 - Recovering Waste Heat from Boilers (Page A3) Consulting-Specifying Engineer - August 2007 - Recovering Waste Heat from Boilers (Page A4) Consulting-Specifying Engineer - August 2007 - New Applications for Tankless Water Heating Systmes (Page A5) Consulting-Specifying Engineer - August 2007 - Techniques Improve for Powder Coating MDF (Page A6) Consulting-Specifying Engineer - August 2007 - Techniques Improve for Powder Coating MDF (Page A7) Consulting-Specifying Engineer - August 2007 - New Tools Available for Heat Treating Steel (Page A8) Consulting-Specifying Engineer - August 2007 - New Tools Available for Heat Treating Steel (Page A9) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page A10) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page A11) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page A12) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page Cover3) Consulting-Specifying Engineer - August 2007 - Direct Drive Engines (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.