Consulting-Specifying Engineer - September 2007 - (Page 21) M/E Roundtable PA C K A G E D A N D S T I C K - B U I LT P O W E R E Q U I P M E N T Power equipment considerations BY MELISSA HILLEBRAND, Associate Editor Participants Anil Ahuja, P.E., LEED AP, RCDD Senior VP, CCJM Engineers, Chicago Thomas Flickinger, P.E., CSI Vice President & Director of Electrical Engineering, Durrant, Madison, Wis. William Amann, P.E., LEED AP President, M & E Engineers, Somerville, N.J. Amann Flickinger Ahuja T h i s m o n t h’s p a n e l d i s c u s s e s t h e i d e a l p ro j e c t s a n d f a c i l i t i e s f o r b o t h s t i c k- b u i l t a n d p r e - i n t e g r a te d p o w e r e q u i p m e n t , in addition to industr y and specification issues. CSE : What are the considerations for stic k- built power equipment? What t yp es of p rojec t s a n d fac ilit ies a re ideal for this system? AHUJA: Stick-built power equipment is suitable for customers who want easy shipment, minimum field work, the equipment to be factory assembled and tested for immediate hookup at field, meeting facility space requirements, weather enclosures where required and to meet electrical characteristics of facility, such as short circuit ratings, amps, volts and phases. FLICKINGER: The traditional panelboard and switchboards afford more flexibility for expansion and modification should a facility be expanded. In design-build scenarios where one would expect significant tenant build out, the cost of traditional stick-built power distribution can be directly charged to the tenants to accommodate their special needs. Stickbuilt power distribution has inherently higher installation labor costs due to the individual components and feeder requirements. However, the individual components are less costly than the integrated equipment. Our experience with respect to total installed cost for stick-built systems vs. integrated systems has determined that the stick-built is approximately 5% to 7% less than the integrated systems. This installed cost does not take into consideration the physical building space cost. For institutional applications, specifically hospitals and justice facilities, it is easier to segregate emergency power from normal power via stick-built vs. modular equipment. Additionally with the advent of arc flash considerations, one can only presume that the PPE level will be significantly higher for integrated equipment vs. individual panelboards, which typically are located a distance from the main switchboard. AMANN: By selecting each component individually, a system can incorporate features that may not be available from an integrated system vendor. So for instance, if an owner has lots of experience with a particular line of PLC (programmable logic controls), it may be important for them to use that controller on their power system. Not all manufacturers have the flexibility to work with various Consulting-Specifying Engineer • SEPTEMBER, 2007 21
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - September 2007 Contents M/E Roundtable Cover Story: Airborne Superbugs Third-Party Liability Back to School Product Spotlight Codes & Standards Professional Practices How To New Products Jobs/Cliassifieds Specifier’s Notebook Pure Power Supplement New Technologies, Same Old Transmission Problems Wireless Battery Recharging Solar Concentration Renewables Tracking System A Mighty Wind The Importance of Load Bank Testing Quality Power for Security Systems Consulting-Specifying Engineer - September 2007 Consulting-Specifying Engineer - September 2007 - (Page Cover1) Consulting-Specifying Engineer - September 2007 - (Page Cover2) Consulting-Specifying Engineer - September 2007 - (Page 1) Consulting-Specifying Engineer - September 2007 - (Page 2) Consulting-Specifying Engineer - September 2007 - Contents (Page 3) Consulting-Specifying Engineer - September 2007 - Contents (Page 4) Consulting-Specifying Engineer - September 2007 - Contents (Page 5) Consulting-Specifying Engineer - September 2007 - Contents (Page 6) Consulting-Specifying Engineer - September 2007 - Contents (Page 7) Consulting-Specifying Engineer - September 2007 - Contents (Page 8) Consulting-Specifying Engineer - September 2007 - Contents (Page 9) Consulting-Specifying Engineer - September 2007 - Contents (Page 10) Consulting-Specifying Engineer - September 2007 - Contents (Page 11) Consulting-Specifying Engineer - September 2007 - Contents (Page 12) Consulting-Specifying Engineer - September 2007 - Contents (Page 13) Consulting-Specifying Engineer - September 2007 - Contents (Page 14) Consulting-Specifying Engineer - September 2007 - Contents (Page 15) Consulting-Specifying Engineer - September 2007 - Contents (Page 16) Consulting-Specifying Engineer - September 2007 - Contents (Page 17) Consulting-Specifying Engineer - September 2007 - Contents (Page 18) Consulting-Specifying Engineer - September 2007 - Contents (Page 19) Consulting-Specifying Engineer - September 2007 - Contents (Page 20) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 24) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 25) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 26) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 27) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 28) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 29) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 30) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 31) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 32) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 33) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 34) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 35) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 36) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 37) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 38) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 39) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 40) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 41) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 42) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 43) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 44) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 45) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 46) Consulting-Specifying Engineer - September 2007 - Back to School (Page 47) Consulting-Specifying Engineer - September 2007 - Back to School (Page 48) Consulting-Specifying Engineer - September 2007 - Back to School (Page 49) Consulting-Specifying Engineer - September 2007 - Back to School (Page 50) Consulting-Specifying Engineer - September 2007 - Back to School (Page 51) Consulting-Specifying Engineer - September 2007 - Back to School (Page 52) Consulting-Specifying Engineer - September 2007 - Back to School (Page 53) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 54) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 55) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 56) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 57) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 58) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 59) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 60) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 61) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 62) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 63) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 64) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 65) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 66) Consulting-Specifying Engineer - September 2007 - How To (Page 67) Consulting-Specifying Engineer - September 2007 - How To (Page 68) Consulting-Specifying Engineer - September 2007 - How To (Page 69) Consulting-Specifying Engineer - September 2007 - New Products (Page 70) Consulting-Specifying Engineer - September 2007 - New Products (Page 71) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 72) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 73) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 74) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 75) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page 76) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page Cover3) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page Cover4) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PPcov1) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PPcov2) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PP1) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PP2) Consulting-Specifying Engineer - September 2007 - New Technologies, Same Old Transmission Problems (Page PP3) Consulting-Specifying Engineer - September 2007 - New Technologies, Same Old Transmission Problems (Page PP4) Consulting-Specifying Engineer - September 2007 - Wireless Battery Recharging (Page PP5) Consulting-Specifying Engineer - September 2007 - Solar Concentration (Page PP6) Consulting-Specifying Engineer - September 2007 - Renewables Tracking System (Page PP7) Consulting-Specifying Engineer - September 2007 - A Mighty Wind (Page PP8) Consulting-Specifying Engineer - September 2007 - A Mighty Wind (Page PP9) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP10) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP11) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP12) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP13) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP14) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP15) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP16) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP17) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP18) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP19) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP20) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP21) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP22) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP23) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP24) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP25) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP26) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP27) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP28) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PPcov3) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PPcov4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.