Consulting-Specifying Engineer - September 2007 - (Page 63) • COMMISSIONING • Professional Practices B U I L D I N G A U T O M AT I O N S Y S T E M S Key procedures for BAS commissioning BY GEORGE BOURASSA, P.E., CCP, LEED AP, Senior Vice President, and CRAIG JOHNSON, CxA, Senior Manager - Commissioning, Carter & Burgess, Inc., Chicago ommissioning has been a formally recognized practice in project delivery for about a decade. ASHRAE defines commissioning as “a quality-focused process for enhancing the delivery of a project. The process focuses on verifying and documenting that the facility and all of its systems and assemblies are planned, designed, installed, tested, operated and maintained to meet the Owner’s Project Requirements.” And this, ultimately, is what all commissioning providers are shooting for. Commissioning of the building automation system (BAS) early is critical, because it is then used to commission other systems. Our experience over the past eight years with commissioning services related to BAS has consistently demonstrated one significant issue: There are far too often critical deficiencies in the implementation of the design intent articulated by the project team in the installation and startup of the C There are far too often critical deficiencies in the installation and startup of BAS when compared with the design intent articulated by the project team. systems on site. These relate principally to the following issues: • The controls subcontractor is the last installer in the overall sequence of trades on projects, and frequently lags the completion of other installed systems. The controls system is not functioning or barely operating when the commissioning agent is scheduled to carry out functional performance verification testing on HVAC and supplementary systems. As a result, we wait for the controls installation to be completed, or the sequences of operations cannot be verified because the controls system fails to perform all of the interfaces— those internal to the BAS and the interfaces with the systems that BAS monitors. • The composite controls/automation system is a patchwork of standard modules marketed by the manufacturer, and the combination of these elements does not specifically comply with the design intent. • Record documentation—all submittals, RFIs/ responses/resolution, as-built drawings, operation and maintenance manuals and videotapes (or other media records) of training sessions—is detailed as it relates to individual components within the installation, but there often is minimal or no description of the sequences of operation or how to diagnose problems when the sequences do not perform as intended. • Providing accurate component identification (tagging) within the systems as required by the plans and specifications has also become problematic during the functional testing phase of the commissioning process. • Training of building system operators by subcontractors usually consists of highlighting the technical attributes of the installed components. This is not training, because it does not address the real needs of the personnel who are charged with the responsibility of efficiently operating and maintaining the systems over the life cycle of the facility. Because commissioning is a relatively new industry, at least in the formal nature of the rigorous functional performance verification testing that is the focus of the process, BAS manufacturers and installers are finding that a high level of third-party scrutiny is now being given to the sequences of operation, transition of system functioning as seasons and outside weather changes and the interfaces among systems. In order to avoid the potential that numerous functional tests receive fail results, when appropriately implemented, commissioning should incorporate the following requirements: Consulting-Specifying Engineer • SEPTEMBER, 2007 63
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - September 2007 Contents M/E Roundtable Cover Story: Airborne Superbugs Third-Party Liability Back to School Product Spotlight Codes & Standards Professional Practices How To New Products Jobs/Cliassifieds Specifier’s Notebook Pure Power Supplement New Technologies, Same Old Transmission Problems Wireless Battery Recharging Solar Concentration Renewables Tracking System A Mighty Wind The Importance of Load Bank Testing Quality Power for Security Systems Consulting-Specifying Engineer - September 2007 Consulting-Specifying Engineer - September 2007 - (Page Cover1) Consulting-Specifying Engineer - September 2007 - (Page Cover2) Consulting-Specifying Engineer - September 2007 - (Page 1) Consulting-Specifying Engineer - September 2007 - (Page 2) Consulting-Specifying Engineer - September 2007 - Contents (Page 3) Consulting-Specifying Engineer - September 2007 - Contents (Page 4) Consulting-Specifying Engineer - September 2007 - Contents (Page 5) Consulting-Specifying Engineer - September 2007 - Contents (Page 6) Consulting-Specifying Engineer - September 2007 - Contents (Page 7) Consulting-Specifying Engineer - September 2007 - Contents (Page 8) Consulting-Specifying Engineer - September 2007 - Contents (Page 9) Consulting-Specifying Engineer - September 2007 - Contents (Page 10) Consulting-Specifying Engineer - September 2007 - Contents (Page 11) Consulting-Specifying Engineer - September 2007 - Contents (Page 12) Consulting-Specifying Engineer - September 2007 - Contents (Page 13) Consulting-Specifying Engineer - September 2007 - Contents (Page 14) Consulting-Specifying Engineer - September 2007 - Contents (Page 15) Consulting-Specifying Engineer - September 2007 - Contents (Page 16) Consulting-Specifying Engineer - September 2007 - Contents (Page 17) Consulting-Specifying Engineer - September 2007 - Contents (Page 18) Consulting-Specifying Engineer - September 2007 - Contents (Page 19) Consulting-Specifying Engineer - September 2007 - Contents (Page 20) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 24) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 25) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 26) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 27) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 28) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 29) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 30) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 31) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 32) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 33) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 34) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 35) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 36) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 37) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 38) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 39) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 40) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 41) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 42) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 43) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 44) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 45) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 46) Consulting-Specifying Engineer - September 2007 - Back to School (Page 47) Consulting-Specifying Engineer - September 2007 - Back to School (Page 48) Consulting-Specifying Engineer - September 2007 - Back to School (Page 49) Consulting-Specifying Engineer - September 2007 - Back to School (Page 50) Consulting-Specifying Engineer - September 2007 - Back to School (Page 51) Consulting-Specifying Engineer - September 2007 - Back to School (Page 52) Consulting-Specifying Engineer - September 2007 - Back to School (Page 53) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 54) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 55) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 56) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 57) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 58) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 59) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 60) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 61) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 62) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 63) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 64) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 65) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 66) Consulting-Specifying Engineer - September 2007 - How To (Page 67) Consulting-Specifying Engineer - September 2007 - How To (Page 68) Consulting-Specifying Engineer - September 2007 - How To (Page 69) Consulting-Specifying Engineer - September 2007 - New Products (Page 70) Consulting-Specifying Engineer - September 2007 - New Products (Page 71) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 72) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 73) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 74) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 75) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page 76) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page Cover3) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page Cover4) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PPcov1) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PPcov2) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PP1) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PP2) Consulting-Specifying Engineer - September 2007 - New Technologies, Same Old Transmission Problems (Page PP3) Consulting-Specifying Engineer - September 2007 - New Technologies, Same Old Transmission Problems (Page PP4) Consulting-Specifying Engineer - September 2007 - Wireless Battery Recharging (Page PP5) Consulting-Specifying Engineer - September 2007 - Solar Concentration (Page PP6) Consulting-Specifying Engineer - September 2007 - Renewables Tracking System (Page PP7) Consulting-Specifying Engineer - September 2007 - A Mighty Wind (Page PP8) Consulting-Specifying Engineer - September 2007 - A Mighty Wind (Page PP9) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP10) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP11) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP12) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP13) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP14) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP15) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP16) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP17) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP18) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP19) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP20) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP21) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP22) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP23) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP24) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP25) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP26) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP27) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP28) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PPcov3) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PPcov4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.