Consulting-Specifying Engineer - September 2007 - (Page 64) Professional Practices • Soon after construction contracts have been awarded, commissioning providers should meet with the construction manager or general contractor to integrate the commissioning activities into the master construction schedule. Because the commissioning agent wants to start functional performance verification testing as early as possible, they collaborate with the contractors to schedule equipment startup and completion of systems, or portions of systems, to allow testing to proceed. In some instances, this fast-tracking of functional testing will require subcontractors to revise the sequence of component and system installation. The importance of scheduling the controls subcontractor to advance work to meet this sequence is clear and must be communicated early. This approach marks a significant change from the traditional situation and has met with resistance, on occasion, from controls installers. During the submittal process, the commissioning provider determines how closely the installation satisfies the design intent; the critical issue is the capability of the system to perform. • During the submittal process, along with the design engineer, commissioning providers determine how closely the control configuration satisfies the design intent. It is not just a question of the temperature sensors and dampercontrol devices meeting the specification. The more critical issue is system capability to perform all of the designated HVAC sequences of operation and interface points with other operating elements, and integrate with other building systems without having to implement unique fixes as supplementary to the scope of submitted packages. This requires detailed and close cooperation between the design engineer and commissioning provider who are reviewing the submittals. It is critical to identify deficiencies at this stage, before installation of the control system commences. • Not more than 60 to 90 days following submittal approval, the commissioning provider requests the first draft of operating and maintenance manuals from the contractors. The timing is important, because the sequence of draft review and revisions always drags out. Commissioning providers should have the final, approved manuals available to the operating personnel a minimum 60 days before training sessions commence. Similar to all issues described in this presentation, the quality of information prevails. It is important that the operation and maintenance material submitted contain the information of the components that are currently installed and not be generic. Operating personnel will want sequence of operation details and troubleshooting explanations in the manuals. While parts lists and specification criteria for components are useful, this is not the information that will Input #236 at csemag.com/quickResponse http://www.yaskawa.com/E7 http://www.yaskawa.com http://www.yaskawa.com http://csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - September 2007 Contents M/E Roundtable Cover Story: Airborne Superbugs Third-Party Liability Back to School Product Spotlight Codes & Standards Professional Practices How To New Products Jobs/Cliassifieds Specifier’s Notebook Pure Power Supplement New Technologies, Same Old Transmission Problems Wireless Battery Recharging Solar Concentration Renewables Tracking System A Mighty Wind The Importance of Load Bank Testing Quality Power for Security Systems Consulting-Specifying Engineer - September 2007 Consulting-Specifying Engineer - September 2007 - (Page Cover1) Consulting-Specifying Engineer - September 2007 - (Page Cover2) Consulting-Specifying Engineer - September 2007 - (Page 1) Consulting-Specifying Engineer - September 2007 - (Page 2) Consulting-Specifying Engineer - September 2007 - Contents (Page 3) Consulting-Specifying Engineer - September 2007 - Contents (Page 4) Consulting-Specifying Engineer - September 2007 - Contents (Page 5) Consulting-Specifying Engineer - September 2007 - Contents (Page 6) Consulting-Specifying Engineer - September 2007 - Contents (Page 7) Consulting-Specifying Engineer - September 2007 - Contents (Page 8) Consulting-Specifying Engineer - September 2007 - Contents (Page 9) Consulting-Specifying Engineer - September 2007 - Contents (Page 10) Consulting-Specifying Engineer - September 2007 - Contents (Page 11) Consulting-Specifying Engineer - September 2007 - Contents (Page 12) Consulting-Specifying Engineer - September 2007 - Contents (Page 13) Consulting-Specifying Engineer - September 2007 - Contents (Page 14) Consulting-Specifying Engineer - September 2007 - Contents (Page 15) Consulting-Specifying Engineer - September 2007 - Contents (Page 16) Consulting-Specifying Engineer - September 2007 - Contents (Page 17) Consulting-Specifying Engineer - September 2007 - Contents (Page 18) Consulting-Specifying Engineer - September 2007 - Contents (Page 19) Consulting-Specifying Engineer - September 2007 - Contents (Page 20) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 24) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 25) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 26) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 27) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 28) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 29) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 30) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 31) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 32) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 33) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 34) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 35) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 36) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 37) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 38) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 39) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 40) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 41) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 42) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 43) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 44) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 45) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 46) Consulting-Specifying Engineer - September 2007 - Back to School (Page 47) Consulting-Specifying Engineer - September 2007 - Back to School (Page 48) Consulting-Specifying Engineer - September 2007 - Back to School (Page 49) Consulting-Specifying Engineer - September 2007 - Back to School (Page 50) Consulting-Specifying Engineer - September 2007 - Back to School (Page 51) Consulting-Specifying Engineer - September 2007 - Back to School (Page 52) Consulting-Specifying Engineer - September 2007 - Back to School (Page 53) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 54) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 55) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 56) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 57) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 58) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 59) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 60) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 61) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 62) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 63) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 64) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 65) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 66) Consulting-Specifying Engineer - September 2007 - How To (Page 67) Consulting-Specifying Engineer - September 2007 - How To (Page 68) Consulting-Specifying Engineer - September 2007 - How To (Page 69) Consulting-Specifying Engineer - September 2007 - New Products (Page 70) Consulting-Specifying Engineer - September 2007 - New Products (Page 71) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 72) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 73) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 74) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 75) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page 76) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page Cover3) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page Cover4) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PPcov1) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PPcov2) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PP1) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PP2) Consulting-Specifying Engineer - September 2007 - New Technologies, Same Old Transmission Problems (Page PP3) Consulting-Specifying Engineer - September 2007 - New Technologies, Same Old Transmission Problems (Page PP4) Consulting-Specifying Engineer - September 2007 - Wireless Battery Recharging (Page PP5) Consulting-Specifying Engineer - September 2007 - Solar Concentration (Page PP6) Consulting-Specifying Engineer - September 2007 - Renewables Tracking System (Page PP7) Consulting-Specifying Engineer - September 2007 - A Mighty Wind (Page PP8) Consulting-Specifying Engineer - September 2007 - A Mighty Wind (Page PP9) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP10) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP11) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP12) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP13) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP14) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP15) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP16) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP17) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP18) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP19) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP20) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP21) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP22) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP23) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP24) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP25) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP26) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP27) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP28) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PPcov3) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PPcov4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.