Consulting-Specifying Engineer - September 2007 - (Page 76) Specifier’s Notebook T E C H N O L O G Y A N A LY S I S An enlightened look at photovoltaic cost BY JOHN MILLS, P.E., LEED AP, Associate Principal, Goetting & Assocs., San Antonio G Considerations in PV design • Building integrated photovoltaic systems (BIPVs) function as both solar shade and electrical generation • Federal, state and local jurisdictions offer tax rebates for PV use • Utilities are stepping up to the plate by offering help in capitalizing PV • USGBC LEED credit offers a benchmark for the percentage of power PV provides iven the double digit growth in the photovoltaic industry, PV conversion of sunlight is quickly making economic sense. There are two basic types of PV systems: grid-connected and remote-storage. Gridconnected systems are connected directly to the building power system to supplement the power delivered by the local utility. Remote systems often are deployed in areas where the cost to extend utilities is prohibitive. Three types of commercially viable modules are monocrystalline silicon, polycrystalline silicon and amorphous silicon. The relatively new amorphous-silicon thin-film technologies often are deployed as integrated roof, building skin or canopy systems, called building integrated photovoltaic systems (BIPVs). BIPVs offer the advantage of multiple use, as both solar shade and electrical generation. One should consider relative solar angles and siting issues to site an array properly. In our hemisphere, the sun tracks along a southerly route due to the earth’s inclination to the sun. This makes it important to orient the array to the south. Ideally, a zero azimuth is the optimal orientation, but a 10-degree variation one way or the other won’t affect a cost-effective output of the system. Select a tilted angle close to the array’s latitude. One can expect the present cost to be in the range of $5 to $8 per peak watt (Wp), including installation costs and any burdens, though I have seen estimates as low as $4 to $5 per Wp. The final cost of a 20-kilowatt peak (kWp) fixed-grid system should be about $160,000. A good benchmark is the USGBC LEED credit available with a 5% system—one that supplies no less that 5% of a facility’s demands. Smaller systems are equally viable. It is important to select a design team with an intimate knowledge of simulation and modeling techniques. A baseline calculation using an energy modeling tool will be required. A typical system produces about 9 Wp to 10 Wp per sq. ft. and about 10 kWh to 12 kWh per sq. ft. per year, depending on the geographic siting of the array. These numbers are improving by significant margins based on improved modules, but they should hold for budget purposes over the next year or so. Let’s look at a 100,000-sq.-ft. office building. Given 6 Wp per sq. ft. (use demand, not connected load) this value becomes 600 kWp: 600 kWp X 5% = 30 kWp 30 kWp X $8 per Wp = $240,000 These numbers are conservative, but should get budgeting in the ballpark. For a reality One can expect a 10- to 15-year payback on a photovoltaic system, which has a useful life of 25 years or more. check, consider that if the office building is constructed for $90 per sq. ft., it would cost $9 million. The $240,000 represents about a 2.6% increase in construction cost. In San Antonio, Texas, for example, one can expect a payback in 10 to 15 years. Payback could be half that time in areas with higher energy rates. Utilities are offering help in capitalizing PV projects because it improves their adherent to renewable portfolio standards. Considering that a systems offer a 25 year or more useful life, it will be generating free electricity for half or more of its useful life. Editor’s note: A longer, more detailed version of this article can be found in the Electrical Community at www.csemag.com. 76 Consulting-Specifying Engineer • SEPTEMBER, 2007 http://www.csemag.com
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - September 2007 Contents M/E Roundtable Cover Story: Airborne Superbugs Third-Party Liability Back to School Product Spotlight Codes & Standards Professional Practices How To New Products Jobs/Cliassifieds Specifier’s Notebook Pure Power Supplement New Technologies, Same Old Transmission Problems Wireless Battery Recharging Solar Concentration Renewables Tracking System A Mighty Wind The Importance of Load Bank Testing Quality Power for Security Systems Consulting-Specifying Engineer - September 2007 Consulting-Specifying Engineer - September 2007 - (Page Cover1) Consulting-Specifying Engineer - September 2007 - (Page Cover2) Consulting-Specifying Engineer - September 2007 - (Page 1) Consulting-Specifying Engineer - September 2007 - (Page 2) Consulting-Specifying Engineer - September 2007 - Contents (Page 3) Consulting-Specifying Engineer - September 2007 - Contents (Page 4) Consulting-Specifying Engineer - September 2007 - Contents (Page 5) Consulting-Specifying Engineer - September 2007 - Contents (Page 6) Consulting-Specifying Engineer - September 2007 - Contents (Page 7) Consulting-Specifying Engineer - September 2007 - Contents (Page 8) Consulting-Specifying Engineer - September 2007 - Contents (Page 9) Consulting-Specifying Engineer - September 2007 - Contents (Page 10) Consulting-Specifying Engineer - September 2007 - Contents (Page 11) Consulting-Specifying Engineer - September 2007 - Contents (Page 12) Consulting-Specifying Engineer - September 2007 - Contents (Page 13) Consulting-Specifying Engineer - September 2007 - Contents (Page 14) Consulting-Specifying Engineer - September 2007 - Contents (Page 15) Consulting-Specifying Engineer - September 2007 - Contents (Page 16) Consulting-Specifying Engineer - September 2007 - Contents (Page 17) Consulting-Specifying Engineer - September 2007 - Contents (Page 18) Consulting-Specifying Engineer - September 2007 - Contents (Page 19) Consulting-Specifying Engineer - September 2007 - Contents (Page 20) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 24) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 25) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 26) Consulting-Specifying Engineer - September 2007 - M/E Roundtable (Page 27) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 28) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 29) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 30) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 31) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 32) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 33) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 34) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 35) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 36) Consulting-Specifying Engineer - September 2007 - Cover Story: Airborne Superbugs (Page 37) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 38) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 39) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 40) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 41) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 42) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 43) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 44) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 45) Consulting-Specifying Engineer - September 2007 - Third-Party Liability (Page 46) Consulting-Specifying Engineer - September 2007 - Back to School (Page 47) Consulting-Specifying Engineer - September 2007 - Back to School (Page 48) Consulting-Specifying Engineer - September 2007 - Back to School (Page 49) Consulting-Specifying Engineer - September 2007 - Back to School (Page 50) Consulting-Specifying Engineer - September 2007 - Back to School (Page 51) Consulting-Specifying Engineer - September 2007 - Back to School (Page 52) Consulting-Specifying Engineer - September 2007 - Back to School (Page 53) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 54) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 55) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 56) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 57) Consulting-Specifying Engineer - September 2007 - Product Spotlight (Page 58) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 59) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 60) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 61) Consulting-Specifying Engineer - September 2007 - Codes & Standards (Page 62) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 63) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 64) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 65) Consulting-Specifying Engineer - September 2007 - Professional Practices (Page 66) Consulting-Specifying Engineer - September 2007 - How To (Page 67) Consulting-Specifying Engineer - September 2007 - How To (Page 68) Consulting-Specifying Engineer - September 2007 - How To (Page 69) Consulting-Specifying Engineer - September 2007 - New Products (Page 70) Consulting-Specifying Engineer - September 2007 - New Products (Page 71) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 72) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 73) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 74) Consulting-Specifying Engineer - September 2007 - Jobs/Cliassifieds (Page 75) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page 76) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page Cover3) Consulting-Specifying Engineer - September 2007 - Specifier’s Notebook (Page Cover4) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PPcov1) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PPcov2) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PP1) Consulting-Specifying Engineer - September 2007 - Pure Power Supplement (Page PP2) Consulting-Specifying Engineer - September 2007 - New Technologies, Same Old Transmission Problems (Page PP3) Consulting-Specifying Engineer - September 2007 - New Technologies, Same Old Transmission Problems (Page PP4) Consulting-Specifying Engineer - September 2007 - Wireless Battery Recharging (Page PP5) Consulting-Specifying Engineer - September 2007 - Solar Concentration (Page PP6) Consulting-Specifying Engineer - September 2007 - Renewables Tracking System (Page PP7) Consulting-Specifying Engineer - September 2007 - A Mighty Wind (Page PP8) Consulting-Specifying Engineer - September 2007 - A Mighty Wind (Page PP9) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP10) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP11) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP12) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP13) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP14) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP15) Consulting-Specifying Engineer - September 2007 - The Importance of Load Bank Testing (Page PP16) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP17) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP18) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP19) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP20) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP21) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP22) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP23) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP24) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP25) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP26) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP27) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PP28) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PPcov3) Consulting-Specifying Engineer - September 2007 - Quality Power for Security Systems (Page PPcov4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.