Consulting-Specifying Engineer - September 2008 - (Page 30) BY KENNETH KUTSMEDA, PE, KlingStubbins, Philadelphia Commissioning on-site electrical systems By adding commissioning to the overall design and construction of a facility, power systems become more reliable. ommissioning is the systematic process by which a piece of equipment, system, or facility is tested to verify that it functions in accordance with the design intent and owner’s operational requirements. In the past, the primary focus of commissioning has been on HVAC systems, but because of the need for increased electrical system reliability and complexity, owners are now starting to realize the importance and benefits of commissioning on-site electrical systems. Some of the advantages include: • Electrical systems that meet the operational needs of the owner • Reduced downtime due to power outages caused by utility loss and/or failures within the electrical system • Coordinated electrical systems that balance protection with reliability and meet C the recent code requirements and standards for critical facilities • Confidence that the electrical systems will operate correctly when required • Knowledge of and experience with the operation of the electrical equipment. Many share a common perception that commissioning is the final stage of a project, performed when a facility is complete or nearly complete. This perception is not true. Commissioning is a process, and in order to maximize commissioning success, it must begin in the pre-design phase of a project and continue through construction until that final verification is executed. ASHRAE Guideline 0-2005, “The Commissioning Process,” breaks down the process into the following phases: • Pre-design • Design • Construction • Operation. Although this guideline was developed for the commissioning of HVAC systems, it is a very comprehensive description of the commissioning process, and the phases it outlines can be used as the basis for commissioning on-site electrical systems. Pre-design phase In the pre-design phase, the owner’s requirements and expectations for the facility are defined. It is important for those performing commissioning (commissioning agents, or CxA) to be involved in this phase so that they can understand the design objective and operational intent of the facility. In this phase, the commissioning scope and budget for the project are determined, and a preliminary commissioning plan is developed identifying the role of the commissioning agent. 30 Consulting-Specifying Engineer • SEPTEMBER 2008
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - September 2008 Consulting-Specifying Engineer - September 2008 Contents Viewpoint Letters News M/ERoundtable Selecting Appropriate Egress Strategies Commissioning On-Site Electrical Systems Mentoring Control Engineers and Technicians Casting Call for Cx Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - September 2008 Consulting-Specifying Engineer - September 2008 - (Page Intro) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page Cover1) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page Cover2) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page 1) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page 2) Consulting-Specifying Engineer - September 2008 - Contents (Page 3) Consulting-Specifying Engineer - September 2008 - Contents (Page 4) Consulting-Specifying Engineer - September 2008 - Contents (Page 5) Consulting-Specifying Engineer - September 2008 - Contents (Page 6) Consulting-Specifying Engineer - September 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - September 2008 - Letters (Page 8) Consulting-Specifying Engineer - September 2008 - Letters (Page 9) Consulting-Specifying Engineer - September 2008 - News (Page 10) Consulting-Specifying Engineer - September 2008 - News (Page 11) Consulting-Specifying Engineer - September 2008 - News (Page 12) Consulting-Specifying Engineer - September 2008 - News (Page 13) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 14) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 15) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 16) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 17) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 18) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 19) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 20) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 21) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 22) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 23) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 24) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 25) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 26) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 27) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 28) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 29) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 30) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 31) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 32) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 33) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 34) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 35) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 36) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 37) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 38) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 39) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 40) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 41) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 42) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 43) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 44) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 45) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 46) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 47) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 48) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 49) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 50) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 51) Consulting-Specifying Engineer - September 2008 - Case Study (Page 52) Consulting-Specifying Engineer - September 2008 - Case Study (Page 53) Consulting-Specifying Engineer - September 2008 - New Products (Page 54) Consulting-Specifying Engineer - September 2008 - New Products (Page 55) Consulting-Specifying Engineer - September 2008 - New Products (Page 56) Consulting-Specifying Engineer - September 2008 - New Products (Page 57) Consulting-Specifying Engineer - September 2008 - New Products (Page 58) Consulting-Specifying Engineer - September 2008 - New Products (Page 59) Consulting-Specifying Engineer - September 2008 - New Products (Page 60) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 67) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 68) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 69) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 70) Consulting-Specifying Engineer - September 2008 - Advertiser Index (Page 71) Consulting-Specifying Engineer - September 2008 - Green Space (Page 72) Consulting-Specifying Engineer - September 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - September 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.