Consulting-Specifying Engineer - September 2008 - (Page 31) Pre-design phase Define owner’s project requirements Acceptance Determine scope and budget Develop preliminary plan Design phase In addition to verifying performance visually— like at left—data gathered (see above) during commissioning can be used as a benchmark to evaluate the future operation of the equipment. Photo: KlingStubbins Verify owner’s requirements and update basis of design Construction documents Outline procedures and acceptance criteria Update commissioning plan Identify expectations of contractor and manufacturer Resolve issues Design review The commissioning scope will be dictated by the type and size of the facility. Critical facilities like data centers, call centers, and hospitals have more complex electrical distribution, standby, or emergency generation and other backup systems than a standard office facility, and therefore will require a more comprehensive commissioning scope. The following is a list of on-site electrical systems to consider when determining the commissioning scope for a project. • Normal power systems: - Switchgear/switchboards (medium- and low-voltage) - Main-tie and auto throw-over schemes - Transformers - Panelboards - Transient voltage surge suppressors - Motor controllers - Bus duct and tap devices - Fuse/circuit breakers - Relay protection systems. • Emergency/standby power systems: - Generators - Generator paralleling switchgear - Automatic/static transfer switches - Roll-up generator tap boxes • UPS • Lighting control systems • Emergency power off systems • Supervisory control and data acquisition systems • Grounding systems. Design phase In the design phase, the owner’s requirements are translated into construction documents. The commissioning agent’s role in the design phase is to review and comment on the Acceptance Construction phase Submittal review Develop on-site commissioning test procedures Finalize commissioning plan Develop on-site commissioning checklist Coordinate commissioning schedule Resolve issues Factory testing Acceptance Operation phase Equipment visual and mechanical inspection Discrete systems test Resolve issues Resolve issues Individual equipment test Acceptance Update issues log Create issues log Acceptance Integrated systems test Resolve issues Acceptance Update issues log Commissioning a facility requires several steps and several concurrent processes. Source: KlingStubbins (based on ASHRAE Guideline 0-2005 Commissioning Process Flow Chart) Consulting-Specifying Engineer • SEPTEMBER 2008 31
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - September 2008 Consulting-Specifying Engineer - September 2008 Contents Viewpoint Letters News M/E Roundtable Selecting Appropriate Egress Strategies Commissioning On-Site Electrical Systems Mentoring Control Engineers and Technicians Casting Call for Cx Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - September 2008 Consulting-Specifying Engineer - September 2008 - (Page Intro) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page Cover1) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page Cover2) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page 1) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page 2) Consulting-Specifying Engineer - September 2008 - Contents (Page 3) Consulting-Specifying Engineer - September 2008 - Contents (Page 4) Consulting-Specifying Engineer - September 2008 - Contents (Page 5) Consulting-Specifying Engineer - September 2008 - Contents (Page 6) Consulting-Specifying Engineer - September 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - September 2008 - Letters (Page 8) Consulting-Specifying Engineer - September 2008 - Letters (Page 9) Consulting-Specifying Engineer - September 2008 - News (Page 10) Consulting-Specifying Engineer - September 2008 - News (Page 11) Consulting-Specifying Engineer - September 2008 - News (Page 12) Consulting-Specifying Engineer - September 2008 - News (Page 13) Consulting-Specifying Engineer - September 2008 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - September 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - September 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - September 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - September 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - September 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 20) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 21) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 22) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 23) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 24) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 25) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 26) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 27) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 28) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 29) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 30) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 31) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 32) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 33) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 34) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 35) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 36) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 37) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 38) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 39) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 40) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 41) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 42) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 43) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 44) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 45) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 46) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 47) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 48) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 49) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 50) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 51) Consulting-Specifying Engineer - September 2008 - Case Study (Page 52) Consulting-Specifying Engineer - September 2008 - Case Study (Page 53) Consulting-Specifying Engineer - September 2008 - New Products (Page 54) Consulting-Specifying Engineer - September 2008 - New Products (Page 55) Consulting-Specifying Engineer - September 2008 - New Products (Page 56) Consulting-Specifying Engineer - September 2008 - New Products (Page 57) Consulting-Specifying Engineer - September 2008 - New Products (Page 58) Consulting-Specifying Engineer - September 2008 - New Products (Page 59) Consulting-Specifying Engineer - September 2008 - New Products (Page 60) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 67) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 68) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 69) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 70) Consulting-Specifying Engineer - September 2008 - Advertiser Index (Page 71) Consulting-Specifying Engineer - September 2008 - Green Space (Page 72) Consulting-Specifying Engineer - September 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - September 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.