Consulting-Specifying Engineer - September 2008 - (Page 7) Editor’s Viewpoint Michael Ivanovich, Editor-in-Chief Settling the commissioning frontier he commissioning (Cx) market is very strong these days. With so much work in play, firms that provide commissioning services are scrambling to hire staff to put into the field. The most recent commissioning market study I’ve seen was published by FMI’s Research Services Group in 2005. It is estimated that Cx amounted to an $804 million industry in 2004 and would grow by 65% in three years to $1.3 billion. That market valuation is probably conservative because retrocommissioning existing buildings was not a strong market at the time, and with energy prices skyrocketing since then, utilities in California, Oregon, and other states have started providing rebates for retrocommissioning services that save energy. Additionally, the accelerated growth of U.S. Green Building Council LEED buildings and building types continues to pump up Cx services through prerequisites and credits. And, until recently, Cx services largely pertained to HVAC systems, lighting, and controls. The services have since grown to include electrical systems (see the related article on page 30), and fire and life safety systems. Therefore, the Cx market is big, and with electrical and fire and life-safety systems being commissioned more frequently—thus introducing many scoping and integration issues—Cx can be viewed as a frontier still being settled, even among traditional Cx tasks like HVAC. Answering that call, ASHRAE published Guideline 0, The Commissioning Process, in 2005, and followed with ASHRAE Guideline 1.1, HVAC&R Technical Requirements for the Commissioning Process, in 2008, which describes the technical requirements for applying ASHRAE Guideline 0-2005. Also, the Building Commissioning Assn. published its “Best Practices in Commissioning Existing Buildings” in 2008 (see the related article on page 10). Even within LEED, which, at its inception, had a prerequisite for Cx and credits for enhanced Cx services, commissioning is still being tweaked. In the first public review draft of LEED 2009, the USGBC seemed to be softening the requirement that Cx be started during the design process, and it seemed to give more power to “LEED consultants” than Cx providers were comfortable with. In the second public review draft, the stipulations for LEED consultants were dropped and the encouragement (but not requirement) to involve Cx “as early as possible” in the design phase was affirmed. The USGBC also rebuffed comments to LEED 2009 calling for certified Cx providers, and illuminated its thinking on where and when independent third-party Cx providers should be required. (For a related article, see page 44) The achievements and challenges of the commissioning frontier are reflected in a white paper published by Portland Energy Conservation Inc. (PECI), stemming from a town-hall meeting held at the company’s 16th Annual National Conference on Building Commissioning in April 2008. The paper provides a 10-year perspective on the growth of Cx, and identifies issues such as standardization and consolidation. The white paper can be downloaded at www.peci.org/ncbc. Happy trails. T Send your questions and comments to: Michael.Ivanovich@reedbusiness.com Consulting-Specifying Engineer • SEPTEMBER 2008 7 http://www.peci.org/ncbc
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - September 2008 Consulting-Specifying Engineer - September 2008 Contents Viewpoint Letters News M/ERoundtable Selecting Appropriate Egress Strategies Commissioning On-Site Electrical Systems Mentoring Control Engineers and Technicians Casting Call for Cx Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - September 2008 Consulting-Specifying Engineer - September 2008 - (Page Intro) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page Cover1) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page Cover2) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page 1) Consulting-Specifying Engineer - September 2008 - Consulting-Specifying Engineer - September 2008 (Page 2) Consulting-Specifying Engineer - September 2008 - Contents (Page 3) Consulting-Specifying Engineer - September 2008 - Contents (Page 4) Consulting-Specifying Engineer - September 2008 - Contents (Page 5) Consulting-Specifying Engineer - September 2008 - Contents (Page 6) Consulting-Specifying Engineer - September 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - September 2008 - Letters (Page 8) Consulting-Specifying Engineer - September 2008 - Letters (Page 9) Consulting-Specifying Engineer - September 2008 - News (Page 10) Consulting-Specifying Engineer - September 2008 - News (Page 11) Consulting-Specifying Engineer - September 2008 - News (Page 12) Consulting-Specifying Engineer - September 2008 - News (Page 13) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 14) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 15) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 16) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 17) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 18) Consulting-Specifying Engineer - September 2008 - M/ERoundtable (Page 19) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 20) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 21) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 22) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 23) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 24) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 25) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 26) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 27) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 28) Consulting-Specifying Engineer - September 2008 - Selecting Appropriate Egress Strategies (Page 29) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 30) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 31) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 32) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 33) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 34) Consulting-Specifying Engineer - September 2008 - Commissioning On-Site Electrical Systems (Page 35) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 36) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 37) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 38) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 39) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 40) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 41) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 42) Consulting-Specifying Engineer - September 2008 - Mentoring Control Engineers and Technicians (Page 43) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 44) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 45) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 46) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 47) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 48) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 49) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 50) Consulting-Specifying Engineer - September 2008 - Casting Call for Cx (Page 51) Consulting-Specifying Engineer - September 2008 - Case Study (Page 52) Consulting-Specifying Engineer - September 2008 - Case Study (Page 53) Consulting-Specifying Engineer - September 2008 - New Products (Page 54) Consulting-Specifying Engineer - September 2008 - New Products (Page 55) Consulting-Specifying Engineer - September 2008 - New Products (Page 56) Consulting-Specifying Engineer - September 2008 - New Products (Page 57) Consulting-Specifying Engineer - September 2008 - New Products (Page 58) Consulting-Specifying Engineer - September 2008 - New Products (Page 59) Consulting-Specifying Engineer - September 2008 - New Products (Page 60) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 66) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 67) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 68) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 69) Consulting-Specifying Engineer - September 2008 - Equipment Lifecycles (Page 70) Consulting-Specifying Engineer - September 2008 - Advertiser Index (Page 71) Consulting-Specifying Engineer - September 2008 - Green Space (Page 72) Consulting-Specifying Engineer - September 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - September 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.