Consulting-Specifying Engineer - October 2007 - (Page 23) How To B E AT T H E C O D E S Maintaining a comfortable environment in places of assembly BY DON EPPELHEIMER, PE, Applications Engineer,Trane, Piscataway, N.J. esigning comfort systems for places of assembly—such as auditoriums, gymnasiums, arenas or houses of worship—presents some vexing challenges. Such facilities often have acoustical requirements that place limits on equipment location and air distribution design. Many places of assembly experience diverse loads and occupancy schedules, complicating part-load system control. But the biggest challenge is occupancy itself and its impact on ventilation and humidity control. Design guidelines that commonly are applied in commercial office space are troublesome here. A simple example—a school gymnasium during a band concert—can illustrate some of these issues. As this is a talented high school band, both the bleachers and the floor are full. Occupancy is at the fire marshal’s rated seating capacity. The 18,000sq.-ft. gymnasium is designed for 1,200 people, including use of the gym floor. A load calculation reveals the following space loads: Roof 69,600 Btuh Wall 43,000 Btuh Glass 10,500 Btuh Lights 122,900 Btuh People 300,000 Btuh (sensible) Totals: 546,000 Btuh (sensible) 240,000 Btuh (latent) Occupancy is major factor People constitute a significant portion of the space sensible cooling load, more than 50%. However, it is the impact on humidity that makes occupancy a difficult load to manage. The space sensible heat ratio for this example is 0.69. If the target space comfort condition is 75°F and 50% relative humidity (RH), and the air distribution system is designed for 55°F supply air, the required supply airflow is more than 4 cfm/sq. ft. of floor area—a huge amount. How did that happen? There are several ways to affect supply airflow. D Humidity ratio Humidity ratio is grains of water vapor per pound of air. The humidity ratio at 75°F dry bulb and 50% RH results in the desired space condition of 64.7 grains/lb. The 55°F supply air has a humidity ratio of 60.4 grains/lb. At these conditions, each pound of supply air removes 4.3 grains of water vapor. If each occupant contributes 200 Btuh to the latent load, 1,200 people add 230 lbs. of water vapor—1.61 million grains (7,000 grains are in 1 lb.) to the air in the gymnasium. If each pound of supply air removes 4.3 grains of water vapor, it will take 374,000 lbs. of supply air per hour. This equates to approximately 83,000 cfm, or 4.6 cfm/sq. ft. That’s a lot of air. In this example, 83,000 cfm is required to handle humidity, but only 18,000 cfm of this measurement is outdoor air (OA) for ventilation (assuming 15 cfm of OA per person, following the most recent version of ASHRAE Standard 62.1). With a space sensible cooling load of 546,000 Btuh and a supply-air temperature of 55°F; approximately 25,000 cfm is required to maintain the space temperature at 75°F. In this case, 72% of the supply air must be outdoor air. While this is a high fraction of outdoor air, it is manageable. Ventilation air is not the culprit. This 25,000 cfm of supply air equates to 1.4 cfm/sq. ft. There still needs to be 83,000 cfm of supply air to control humidity. How do we better equip the supply air to handle the high latent load associated with this many people? Obviously, the supply air needs to be drier. The drier the supply air, which lowers the dew point, the more water vapor it removes from the space. What supply air dew point is required to handle the space latent load? Calculating specific humidity The key is another humidity measurement called specific humidity. Specific humidity is expressed as pounds of water vapor per pound Consulting-Specifying Engineer • OCTOBER, 2007 23
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - October 2007 Consulting-Specifying Engineer - October 2007 Contents On the Web In the News M/E Roundtable How To Beat the Energy Codes Professional Practices Codes & Standards A Capital Job on Engineered Buiding Systems Going Green in Data Centers Overcurrent Protection: Fuses or Breakers? Third-Party Liability Management Report New Products Product Spotlight Jobs/Classifieds Specifier's Notebook Consulting-Specifying Engineer - October 2007 Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page Cover1) Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page Cover2) Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page 1) Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page 2) Consulting-Specifying Engineer - October 2007 - Contents (Page 3) Consulting-Specifying Engineer - October 2007 - Contents (Page 4) Consulting-Specifying Engineer - October 2007 - Contents (Page 5) Consulting-Specifying Engineer - October 2007 - Contents (Page 6) Consulting-Specifying Engineer - October 2007 - Contents (Page 7) Consulting-Specifying Engineer - October 2007 - Contents (Page 8) Consulting-Specifying Engineer - October 2007 - Contents (Page 9) Consulting-Specifying Engineer - October 2007 - Contents (Page 10) Consulting-Specifying Engineer - October 2007 - On the Web (Page 11) Consulting-Specifying Engineer - October 2007 - On the Web (Page 12) Consulting-Specifying Engineer - October 2007 - In the News (Page 13) Consulting-Specifying Engineer - October 2007 - In the News (Page 14) Consulting-Specifying Engineer - October 2007 - In the News (Page 15) Consulting-Specifying Engineer - October 2007 - In the News (Page 16) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 23) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 24) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 25) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 26) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 27) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 28) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 29) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 30) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 31) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 32) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 33) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 34) Consulting-Specifying Engineer - October 2007 - Codes & Standards (Page 35) Consulting-Specifying Engineer - October 2007 - Codes & Standards (Page 36) Consulting-Specifying Engineer - October 2007 - Codes & Standards (Page 37) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 38) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 39) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 40) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 41) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 42) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 43) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 44) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 45) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 46) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 47) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 48) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 49) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 50) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 51) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 52) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 53) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 54) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 55) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 56) Consulting-Specifying Engineer - October 2007 - Third-Party Liability (Page 57) Consulting-Specifying Engineer - October 2007 - Third-Party Liability (Page 58) Consulting-Specifying Engineer - October 2007 - Third-Party Liability (Page 59) Consulting-Specifying Engineer - October 2007 - Management Report (Page 60) Consulting-Specifying Engineer - October 2007 - Management Report (Page 61) Consulting-Specifying Engineer - October 2007 - Management Report (Page 62) Consulting-Specifying Engineer - October 2007 - New Products (Page 63) Consulting-Specifying Engineer - October 2007 - New Products (Page 64) Consulting-Specifying Engineer - October 2007 - Product Spotlight (Page 65) Consulting-Specifying Engineer - October 2007 - Product Spotlight (Page 66) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 67) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 68) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 69) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 70) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 71) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 72) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 73) Consulting-Specifying Engineer - October 2007 - Specifier's Notebook (Page 74) Consulting-Specifying Engineer - October 2007 - Specifier's Notebook (Page Cover3) Consulting-Specifying Engineer - October 2007 - Specifier's Notebook (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.