Consulting-Specifying Engineer - October 2007 - (Page 30) Professional Practices construction, coordination with other trades, or cost reduction. Contractor requested COs rarely are used when any other category is appropriate, because most contractors do not want to take responsibility for design changes. Also, generally speaking, contractors are not bashful about pointing out some other reason for a CO. Code conflict A Code conflict CO arises when a building code or local ordinance changes between the time the project was designed and when construction begins. The fundamental reason for such conflicts is that the design process can overlap the code change cycle. In most jurisdictions the code that must be used for the construction is the one that was in effect at the time the construction permit was issued. Any project where the design process requires more than a few months is a candidate for a Code conflict CO. Most design professionals perform a code compliance review for major code changes immediately prior to release of a project for bidding, especially if the design has overlapped a code revision cycle. Unfortunately, a delay in issuing contracts, with subsequent delay in obtaining construction permits, can cause the same problem. For the designer, the issue of Code conflict CO poses an unresolvable dilemma because some plan reviewers will not approve plans that are designed based on pending code changes that are not in effect at the time of the review. It should be noted that code conflicts, where the code was actually in effect at the time of the design, are called designer errors. Inspector requirement Occasionally a code inspection official who is acting on behalf of an authority having jurisdiction (AHJ) requires a change to be made on a project due to a perceived code problem or a personal preference. This is really a special category of the Code conflict category, in which the code section cited by the inspection official is interpreted differently by the inspector and the designer. The main element of the Inspector requirement category is controversy. The inspector may be right or wrong, but the change must be made because the project cannot be delayed while the code issue is being resolved. Changes of this type can be either major or minor; if a great deal of money is involved it is likely that the inspector’s position will be appealed to higher authorities. If the inspector’s position is confirmed, the CO falls into the Code conflict category. In general, projects that are being run on a very tight time schedule tend to accept more Inspector requirement COs than projects which are built in a more leisurely manner. Owner request An Owner requested CO is one where the owner alone desires the change. While the needs and requirements of an owner can certainly change during the design and construction process, the most common reason for an owner requested CO is that the owner becomes aware of what is actually being built only after construction has started. In this case, either the owner did not carefully review the contract documents during the design phase of the project, or did not fully understand what the drawings were portraying. Some owners are more familiar with construction drawings than others. Communication errors between the designer and owner can result in costly COs of this type. Part M O R E I N F O R M AT I O N A B O U T emf shielding …Is Just a Click Away. Find out how steel conduit reduces the EMF that can reek havoc on your building’s electronic systems and computers. Visit us at the web address below, then click on “Benefits.” http://www.steelconduit.org 2000 Ponce de Leon, Suite 600, Coral Gables, Florida 33134, (305) 443-1603 • www.steeltubeinstitute.org go Input #218 at csemag.com/quickResponse 30 Consulting-Specifying Engineer • OCTOBER, 2007 http://www.steeltubeinstitute.org http://www.steelconduit.org http://www.steeltubeinstitute.org http://csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - October 2007 Consulting-Specifying Engineer - October 2007 Contents On the Web In the News M/E Roundtable How To Beat the Energy Codes Professional Practices Codes & Standards A Capital Job on Engineered Buiding Systems Going Green in Data Centers Overcurrent Protection: Fuses or Breakers? Third-Party Liability Management Report New Products Product Spotlight Jobs/Classifieds Specifier's Notebook Consulting-Specifying Engineer - October 2007 Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page Cover1) Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page Cover2) Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page 1) Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page 2) Consulting-Specifying Engineer - October 2007 - Contents (Page 3) Consulting-Specifying Engineer - October 2007 - Contents (Page 4) Consulting-Specifying Engineer - October 2007 - Contents (Page 5) Consulting-Specifying Engineer - October 2007 - Contents (Page 6) Consulting-Specifying Engineer - October 2007 - Contents (Page 7) Consulting-Specifying Engineer - October 2007 - Contents (Page 8) Consulting-Specifying Engineer - October 2007 - Contents (Page 9) Consulting-Specifying Engineer - October 2007 - Contents (Page 10) Consulting-Specifying Engineer - October 2007 - On the Web (Page 11) Consulting-Specifying Engineer - October 2007 - On the Web (Page 12) Consulting-Specifying Engineer - October 2007 - In the News (Page 13) Consulting-Specifying Engineer - October 2007 - In the News (Page 14) Consulting-Specifying Engineer - October 2007 - In the News (Page 15) Consulting-Specifying Engineer - October 2007 - In the News (Page 16) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 23) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 24) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 25) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 26) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 27) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 28) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 29) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 30) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 31) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 32) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 33) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 34) Consulting-Specifying Engineer - October 2007 - Codes & Standards (Page 35) Consulting-Specifying Engineer - October 2007 - Codes & Standards (Page 36) Consulting-Specifying Engineer - October 2007 - Codes & Standards (Page 37) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 38) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 39) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 40) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 41) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 42) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 43) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 44) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 45) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 46) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 47) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 48) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 49) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 50) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 51) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 52) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 53) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 54) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 55) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 56) Consulting-Specifying Engineer - October 2007 - Third-Party Liability (Page 57) Consulting-Specifying Engineer - October 2007 - Third-Party Liability (Page 58) Consulting-Specifying Engineer - October 2007 - Third-Party Liability (Page 59) Consulting-Specifying Engineer - October 2007 - Management Report (Page 60) Consulting-Specifying Engineer - October 2007 - Management Report (Page 61) Consulting-Specifying Engineer - October 2007 - Management Report (Page 62) Consulting-Specifying Engineer - October 2007 - New Products (Page 63) Consulting-Specifying Engineer - October 2007 - New Products (Page 64) Consulting-Specifying Engineer - October 2007 - Product Spotlight (Page 65) Consulting-Specifying Engineer - October 2007 - Product Spotlight (Page 66) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 67) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 68) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 69) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 70) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 71) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 72) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 73) Consulting-Specifying Engineer - October 2007 - Specifier's Notebook (Page 74) Consulting-Specifying Engineer - October 2007 - Specifier's Notebook (Page Cover3) Consulting-Specifying Engineer - October 2007 - Specifier's Notebook (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.