Consulting-Specifying Engineer - October 2007 - (Page 74) Specifier’s Notebook T E C H N O L O G Y A N A LY S I S Getting it straight: interruption rating vs. short-circuit current rating BY KENNETH CYBART, Senior Technical Sales Engineer, Littelfuse, Des Plaines, Ill. S SCCR—NEC Compliance • Short-circuit current rating (SCCR) must be equal to or greater than available short-circuit current where equipment is installed. • To verify NEC 110.10 compliance, one must calculate available fault current. • NEC 409 requires that the SCCR be displayed on industrial control panels. • If the SCCR depends on a particular current-limiting device, equipment must be labeled as such. pecifiers often use the terms shortcircuit current rating (SCCR) and interrupting rating (IR) interchangeably. But a system’s or component’s SCCR may depend on the fuse or circuit breaker used in the circuit. Not understanding this difference between SCCR and IR may lead to under-protection, fire, and possibly death. For proper protection and compliance with National Electrical Code (NEC) 110.10, the SCCR of equipment must be equal to or greater than the available short-circuit (or high-level ground fault) current where the equipment is installed. Fuses and circuit breakers must have sufficient IRs for the fault current they interrupt. Usually, the SCCR of a system is much less than the maximum IR of the main overcurrent device. This is due to the fact that SCCRs of an assembly take into account all components contained within the equipment rather than just the main overcurrent protective device. To verify compliance with NEC 110.10, the circuit designer must calculate available fault current. For example, if the calculated available fault current is 35 kA, then the IR and SCCR of all installed overcurrent protective devices and system components must be greater than 35 kA. This seems simple enough, but not all IRs are comparable. Fuses have IRs that do not depend on the action of any other protective device in the circuit. This is often referred to as “fully tested” or “fully rated.” On the other hand, some manufacturers achieve higher IRs by having Underwriters Laboratories test their circuit breakers in series with current-limiting fuses or breakers. The latter clear a circuit in less than one-half an AC cycle, limiting peak let-through current to a safe level. When this is done, the manufactur- er’s datasheet will note that the IR is conditional on the combination of devices. The NEC allows such combinations, but requires that their series rating be labeled on the equipment next to the IR. When replacements are needed, such breakers and fuses must be replaced by the same make, model, and rating to maintain the original IR. NEC Article 240.86 has similar requirements. On new equipment, or where a series rating can be assigned by a registered professional engineer, it must be field marked on the end use equipment. This applies to some so-called fully rated systems if they depend on a tested combination of fuses and circuit breakers. NEC Article 409 requires that the SCCR be displayed on industrial control panels. If that SCCR depends on the use of a specific current- The SCCR of a component may depend on the circuit breaker or fuse used in the circuit. limiting device, then the equipment must be labeled as such, and indicate which device is needed. Specifiers achieve the proper SCCR by selecting a current-limiting device that limits the peak let-through current to a level that protects all components within the panel. Thus, the SCCR of the panel is the maximum RMS current at which the peak let-through current is safe for the most sensitive component. If current-limiting devices are not used, the only alternative is to design with “fully rated” components and overcurrent protective devices. Whichever type of overcurrent protection is specified—fully rated or a combination—the specifier must start with an understanding of the difference between SCCR and IR. 74 Consulting-Specifying Engineer • OCTOBER, 2007
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - October 2007 Consulting-Specifying Engineer - October 2007 Contents On the Web In the News M/E Roundtable How To Beat the Energy Codes Professional Practices Codes & Standards A Capital Job on Engineered Buiding Systems Going Green in Data Centers Overcurrent Protection: Fuses or Breakers? Third-Party Liability Management Report New Products Product Spotlight Jobs/Classifieds Specifier's Notebook Consulting-Specifying Engineer - October 2007 Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page Cover1) Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page Cover2) Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page 1) Consulting-Specifying Engineer - October 2007 - Consulting-Specifying Engineer - October 2007 (Page 2) Consulting-Specifying Engineer - October 2007 - Contents (Page 3) Consulting-Specifying Engineer - October 2007 - Contents (Page 4) Consulting-Specifying Engineer - October 2007 - Contents (Page 5) Consulting-Specifying Engineer - October 2007 - Contents (Page 6) Consulting-Specifying Engineer - October 2007 - Contents (Page 7) Consulting-Specifying Engineer - October 2007 - Contents (Page 8) Consulting-Specifying Engineer - October 2007 - Contents (Page 9) Consulting-Specifying Engineer - October 2007 - Contents (Page 10) Consulting-Specifying Engineer - October 2007 - On the Web (Page 11) Consulting-Specifying Engineer - October 2007 - On the Web (Page 12) Consulting-Specifying Engineer - October 2007 - In the News (Page 13) Consulting-Specifying Engineer - October 2007 - In the News (Page 14) Consulting-Specifying Engineer - October 2007 - In the News (Page 15) Consulting-Specifying Engineer - October 2007 - In the News (Page 16) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - October 2007 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 23) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 24) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 25) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 26) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 27) Consulting-Specifying Engineer - October 2007 - How To Beat the Energy Codes (Page 28) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 29) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 30) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 31) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 32) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 33) Consulting-Specifying Engineer - October 2007 - Professional Practices (Page 34) Consulting-Specifying Engineer - October 2007 - Codes & Standards (Page 35) Consulting-Specifying Engineer - October 2007 - Codes & Standards (Page 36) Consulting-Specifying Engineer - October 2007 - Codes & Standards (Page 37) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 38) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 39) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 40) Consulting-Specifying Engineer - October 2007 - A Capital Job on Engineered Buiding Systems (Page 41) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 42) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 43) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 44) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 45) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 46) Consulting-Specifying Engineer - October 2007 - Going Green in Data Centers (Page 47) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 48) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 49) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 50) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 51) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 52) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 53) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 54) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 55) Consulting-Specifying Engineer - October 2007 - Overcurrent Protection: Fuses or Breakers? (Page 56) Consulting-Specifying Engineer - October 2007 - Third-Party Liability (Page 57) Consulting-Specifying Engineer - October 2007 - Third-Party Liability (Page 58) Consulting-Specifying Engineer - October 2007 - Third-Party Liability (Page 59) Consulting-Specifying Engineer - October 2007 - Management Report (Page 60) Consulting-Specifying Engineer - October 2007 - Management Report (Page 61) Consulting-Specifying Engineer - October 2007 - Management Report (Page 62) Consulting-Specifying Engineer - October 2007 - New Products (Page 63) Consulting-Specifying Engineer - October 2007 - New Products (Page 64) Consulting-Specifying Engineer - October 2007 - Product Spotlight (Page 65) Consulting-Specifying Engineer - October 2007 - Product Spotlight (Page 66) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 67) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 68) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 69) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 70) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 71) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 72) Consulting-Specifying Engineer - October 2007 - Jobs/Classifieds (Page 73) Consulting-Specifying Engineer - October 2007 - Specifier's Notebook (Page 74) Consulting-Specifying Engineer - October 2007 - Specifier's Notebook (Page Cover3) Consulting-Specifying Engineer - October 2007 - Specifier's Notebook (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.