Consulting-Specifying Engineer - October 2008 - (Page 22) M/E Roundtable tive). If the offset has been undersized due to excessively leaky construction, exhaust capacity may fall short. The same holds true for the reverse—tight room, oversized. We frequently see situations where fans are running at a design static pressure higher than design in order to meet flow requirements. Maintaining pressurization during steadystate is challenging but usually accomplished for most facilities when all is said and done. The harder part is addressing the unfortunate, but undeniable, realities of power failures, return from power failures, partial power outages, equipment failures, etc. All of these situations need to be addressed and incorporated into the design. How to operate during fan degrade mode (that is, fan systems—supply or exhaust— not running at effective capacities). Brooks: Lab ventilation systems, as well as all fan systems, require well-designed components used within well-designed systems. A high-efficiency fan that is not properly selected or placed in a poorly designed system may not perform as desired. The system has to be designed to eliminate system effects. The days of procuring oversized fans to account for system uncertainties are (or should be) over. The system designer should be familiar with system effects in order to avoid them. Designers may have nightmares about procuring equipment that does not deliver on performance promises. Ensuring the equipment is certified by independent third-party organizations, such as AMCA International, can help allay that feeling. CSE: What tricks and tips would you give lab designers for specifying systems and equipment that will help improve performance in the field? Tsimanis: There are many items that are critical in the laboratory design process. System flexibility, serviceability, and controllability are several elements that are essential for the system’s performance success. The lab control system needs a fast response and a reliable control interface capable of providing a safe environment within the laboratory spaces. It is suggested that in the design phase of the project, the airflows in each space are carefully defined with allowance of the air infiltration and exfiltration from each space. Hanegan: The best advice I have for specifying systems and equipment is to enforce the specification requirements. This means obtaining owner buy-in that the specifications will be enforced with the contractor (since the buck stops with the owner), writing a spec that is complete and has properly edited boilerplate, and being thorough in site observations. The benefit is that the owner gets what he pays for and the design performs as intended. It also provides an honest, level playing field among contractors and equipment suppliers. Input #213 at csemag.com/quickResponse 22 Consulting-Specifying Engineer • OCTOBER 2008 http://www.uecorp.com http://www.uecorp.com http://www.csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - October 2008 Consulting-Specifying Engineer - October 2008 Contents Viewpoint Letters News M/E Roundtable Cities Under One Roof Eight Design Tips for Integration Is 'Green' Really New? Down the Drain Product of the Year Awards Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - October 2008 Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page Cover1) Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page Cover2) Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page 1) Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page 2) Consulting-Specifying Engineer - October 2008 - Contents (Page 3) Consulting-Specifying Engineer - October 2008 - Contents (Page 4) Consulting-Specifying Engineer - October 2008 - Contents (Page 5) Consulting-Specifying Engineer - October 2008 - Contents (Page 6) Consulting-Specifying Engineer - October 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - October 2008 - Letters (Page 8) Consulting-Specifying Engineer - October 2008 - Letters (Page 9) Consulting-Specifying Engineer - October 2008 - Letters (Page 10) Consulting-Specifying Engineer - October 2008 - Letters (Page 11) Consulting-Specifying Engineer - October 2008 - News (Page 12) Consulting-Specifying Engineer - October 2008 - News (Page 13) Consulting-Specifying Engineer - October 2008 - News (Page 14) Consulting-Specifying Engineer - October 2008 - News (Page 15) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 24) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 25) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 26) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 27) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 28) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 29) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 30) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 31) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 32) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 33) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 34) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 35) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 36) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 37) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 38) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 39) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 40) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 41) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 42) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 43) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 44) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 45) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 46) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 47) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 48) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 48A) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 48B) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 49) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 50) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 51) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 52) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 53) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 54) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 55) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 56) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 57) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 58) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 59) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 60) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 61) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 62) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 63) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 64) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 65) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 66) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 67) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 68) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 69) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 70) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 71) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 72) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 73) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 74) Consulting-Specifying Engineer - October 2008 - Case Study (Page 75) Consulting-Specifying Engineer - October 2008 - Case Study (Page 76) Consulting-Specifying Engineer - October 2008 - Case Study (Page 77) Consulting-Specifying Engineer - October 2008 - New Products (Page 78) Consulting-Specifying Engineer - October 2008 - New Products (Page 79) Consulting-Specifying Engineer - October 2008 - New Products (Page 80) Consulting-Specifying Engineer - October 2008 - New Products (Page 81) Consulting-Specifying Engineer - October 2008 - New Products (Page 82) Consulting-Specifying Engineer - October 2008 - New Products (Page 83) Consulting-Specifying Engineer - October 2008 - New Products (Page 84) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 85) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 86) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 87) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 88) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 89) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 90) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 91) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 92) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 93) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 94) Consulting-Specifying Engineer - October 2008 - Advertiser Index (Page 95) Consulting-Specifying Engineer - October 2008 - Green Space (Page 96) Consulting-Specifying Engineer - October 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - October 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.