Consulting-Specifying Engineer - October 2008 - (Page 23) M/E Roundtable I require certified welders for stainless steel exhaust ductwork, check certificates during the submittal process, and have rigorous leak tests for the ductwork. I also pay close attention to duct sealing requirements; there’s nothing wrong with asking for higher seal class ratings than the minimum required by SMACNA. Sprangers: Start by coordinating the bigpicture items with your architect. The locations of lab exhausts and intakes drive the entire project in well-designed facilities. Determine as early as possible whether lab flow rates will be dictated by air change requirements, cooling loads, or peak fume exhaust flow rates. If air change requirements dictate the flow rates, there may be no savings for VAV or low-flow fume hoods. Another major influence is which types of energy recovery are deemed acceptable for which exhaust systems. Feliciano-Welpe: Involve key equipment manufacturers/contractors in the design process early on to help evaluate potential issues. Focus on desired results and performance rather than product specifications that can “pigeon-hole” manufacturers into providing non-standard features that gain no benefit in achieving the desired results. They have also lived with facilities and their users long after the building has been designed/constructed and can give you insight to what has worked well, and more importantly what has not. Get the commissioning agent involved early in the design process so there is cohesion between what has been designed and what will it be functionally tested to—that is, will the design meet the test requirements? Make actual commissioning documents (specific to the project—not “guide” documents) part of the bid documents. This is the hardest part for a control vendor to estimate. The more information available, the clearer the scope of work becomes, and everyone gets a better product. Make the construction documents clear and specific for the intended facility. We all learn from our previous experiences, but each facility is going to be different with different challenges. Brooks: Look for the AMCA CRP seal on the air-moving product (fans, airflow measurement stations, acoustical duct silencer, dampers, louvers, etc.) to ensure you get the performance expected. A general rule to avoid system effect factors is to have a minimum 2.5 duct diameters of straight duct on the outlet, 5 to 8 duct diameters of straight duct on the inlet, and avoid inlet swirl. Web extra: The Q&A about acoustics and corrosion are available at www.csemag.com. Input #214 at csemag.com/quickResponse http://www.wattstopper.com/psg http://www.wattstopper.com/psg http://www.csemag.com http://www.csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - October 2008 Consulting-Specifying Engineer - October 2008 Contents Viewpoint Letters News M/E Roundtable Cities Under One Roof Eight Design Tips for Integration Is 'Green' Really New? Down the Drain Product of the Year Awards Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - October 2008 Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page Cover1) Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page Cover2) Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page 1) Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page 2) Consulting-Specifying Engineer - October 2008 - Contents (Page 3) Consulting-Specifying Engineer - October 2008 - Contents (Page 4) Consulting-Specifying Engineer - October 2008 - Contents (Page 5) Consulting-Specifying Engineer - October 2008 - Contents (Page 6) Consulting-Specifying Engineer - October 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - October 2008 - Letters (Page 8) Consulting-Specifying Engineer - October 2008 - Letters (Page 9) Consulting-Specifying Engineer - October 2008 - Letters (Page 10) Consulting-Specifying Engineer - October 2008 - Letters (Page 11) Consulting-Specifying Engineer - October 2008 - News (Page 12) Consulting-Specifying Engineer - October 2008 - News (Page 13) Consulting-Specifying Engineer - October 2008 - News (Page 14) Consulting-Specifying Engineer - October 2008 - News (Page 15) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 24) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 25) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 26) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 27) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 28) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 29) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 30) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 31) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 32) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 33) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 34) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 35) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 36) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 37) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 38) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 39) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 40) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 41) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 42) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 43) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 44) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 45) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 46) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 47) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 48) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 48A) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 48B) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 49) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 50) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 51) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 52) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 53) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 54) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 55) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 56) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 57) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 58) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 59) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 60) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 61) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 62) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 63) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 64) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 65) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 66) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 67) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 68) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 69) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 70) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 71) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 72) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 73) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 74) Consulting-Specifying Engineer - October 2008 - Case Study (Page 75) Consulting-Specifying Engineer - October 2008 - Case Study (Page 76) Consulting-Specifying Engineer - October 2008 - Case Study (Page 77) Consulting-Specifying Engineer - October 2008 - New Products (Page 78) Consulting-Specifying Engineer - October 2008 - New Products (Page 79) Consulting-Specifying Engineer - October 2008 - New Products (Page 80) Consulting-Specifying Engineer - October 2008 - New Products (Page 81) Consulting-Specifying Engineer - October 2008 - New Products (Page 82) Consulting-Specifying Engineer - October 2008 - New Products (Page 83) Consulting-Specifying Engineer - October 2008 - New Products (Page 84) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 85) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 86) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 87) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 88) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 89) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 90) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 91) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 92) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 93) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 94) Consulting-Specifying Engineer - October 2008 - Advertiser Index (Page 95) Consulting-Specifying Engineer - October 2008 - Green Space (Page 96) Consulting-Specifying Engineer - October 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - October 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.