Consulting-Specifying Engineer - October 2008 - (Page 28) If the design includes a horizontal exit and the sprinkler contractor isn’t informed that additional hose valves are required, that could create a costly change order. Elevators One common example of coordinated fire protection aspects is elevator systems. Although they are not typically thought of VFD-Induced Bearing Currents Kill Motors! Protect Bearings, Prevent Motor Failure! BEARING PROTECTION RING Safely channels harmful currents away from bearings to ground Easy field or OEM installation — in just minutes Maintenance-free, contaminationproof, lasts for life of motor Standard sizes for any motor Split mounting kit simplifies field installation on NEMA or IEC motors including those with shaft shoulders, slingers, or other end bell protrusions To download a free technical paper on bearing protection technologies, visit our website: 1-866-738-1857 | sales @est-aegis.com www.est-aegis.com/cse2 Input #217 at csemag.com/quickResponse this way, elevators constitute highly sophisticated fire protection systems. This is often overlooked because the required protection is so ingrained into codes and standards that there are rarely issues serious enough to hold up building occupancy. The standard prescriptive fire protection aspects for elevators in major facilities include: • The 2-hour hoistway with 1.5-hour automatic sliding hoistway doors • A maximum of four cars per hoistway • Automatic opening hoistway vents • Smoke detector activated recall with primary and secondary levels • Generators to provide secondary power • Air conditioning systems serving the machine room to protect the sensitive electronics • Emergency responder and public use two-way communication systems • Emergency responder manual overrides • Status panels in the fire command center (FCC). If sprinklers are installed in the hoistway and/or elevator machine room, heat detector activated shunts are required to de-energize power to all elevators in the respective hoistway(s). At times, elevator lobbies are required to reduce the potential for smoke migration from floor to floor. This also can be accomplished by pressurizing the hoistway relative to the landings on each floor. Lately, there is a movement to provide additional protection for emergency responders by requiring fire-resistive elevator lobbies at each floor level. To protect the sensitive electronic equipment in the machine room from smoke, Clark County has historically considered an elevator machine room a separate smoke zone from the associated hoistway(s). Standard practice to reduce smoke migration through cable slots in the floor has been to pressurize the machine room relative to the hoistway. From the preceding description, it becomes quite clear that elevators constitute holistic fire protection systems. The reason this complexity typically isn’t a prob- 28 Consulting-Specifying Engineer • OCTOBER 2008 http://www.est-aegis.com http://www.est-aegis.com http://www.csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - October 2008 Consulting-Specifying Engineer - October 2008 Contents Viewpoint Letters News M/E Roundtable Cities Under One Roof Eight Design Tips for Integration Is 'Green' Really New? Down the Drain Product of the Year Awards Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - October 2008 Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page Cover1) Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page Cover2) Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page 1) Consulting-Specifying Engineer - October 2008 - Consulting-Specifying Engineer - October 2008 (Page 2) Consulting-Specifying Engineer - October 2008 - Contents (Page 3) Consulting-Specifying Engineer - October 2008 - Contents (Page 4) Consulting-Specifying Engineer - October 2008 - Contents (Page 5) Consulting-Specifying Engineer - October 2008 - Contents (Page 6) Consulting-Specifying Engineer - October 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - October 2008 - Letters (Page 8) Consulting-Specifying Engineer - October 2008 - Letters (Page 9) Consulting-Specifying Engineer - October 2008 - Letters (Page 10) Consulting-Specifying Engineer - October 2008 - Letters (Page 11) Consulting-Specifying Engineer - October 2008 - News (Page 12) Consulting-Specifying Engineer - October 2008 - News (Page 13) Consulting-Specifying Engineer - October 2008 - News (Page 14) Consulting-Specifying Engineer - October 2008 - News (Page 15) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - October 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 24) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 25) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 26) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 27) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 28) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 29) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 30) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 31) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 32) Consulting-Specifying Engineer - October 2008 - Cities Under One Roof (Page 33) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 34) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 35) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 36) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 37) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 38) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 39) Consulting-Specifying Engineer - October 2008 - Eight Design Tips for Integration (Page 40) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 41) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 42) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 43) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 44) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 45) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 46) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 47) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 48) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 48A) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 48B) Consulting-Specifying Engineer - October 2008 - Is 'Green' Really New? (Page 49) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 50) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 51) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 52) Consulting-Specifying Engineer - October 2008 - Down the Drain (Page 53) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 54) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 55) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 56) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 57) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 58) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 59) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 60) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 61) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 62) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 63) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 64) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 65) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 66) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 67) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 68) Consulting-Specifying Engineer - October 2008 - Product of the Year Awards (Page 69) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 70) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 71) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 72) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 73) Consulting-Specifying Engineer - October 2008 - Codes & Standards (Page 74) Consulting-Specifying Engineer - October 2008 - Case Study (Page 75) Consulting-Specifying Engineer - October 2008 - Case Study (Page 76) Consulting-Specifying Engineer - October 2008 - Case Study (Page 77) Consulting-Specifying Engineer - October 2008 - New Products (Page 78) Consulting-Specifying Engineer - October 2008 - New Products (Page 79) Consulting-Specifying Engineer - October 2008 - New Products (Page 80) Consulting-Specifying Engineer - October 2008 - New Products (Page 81) Consulting-Specifying Engineer - October 2008 - New Products (Page 82) Consulting-Specifying Engineer - October 2008 - New Products (Page 83) Consulting-Specifying Engineer - October 2008 - New Products (Page 84) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 85) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 86) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 87) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 88) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 89) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 90) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 91) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 92) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 93) Consulting-Specifying Engineer - October 2008 - Equipment Lifecycles (Page 94) Consulting-Specifying Engineer - October 2008 - Advertiser Index (Page 95) Consulting-Specifying Engineer - October 2008 - Green Space (Page 96) Consulting-Specifying Engineer - October 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - October 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.