Consulting-Specifying Engineer - November 2007 - (Page 22) One can use a tie breaker in parallel switchgear designs. As shown in Figure 2, the tie breaker in the open position will allow for the “A” To further clarify the performance of a generator in a fault scenario, the engineer must become familiar with the generator decrement curve. side generator to come up to speed and connect to the bus at the same time as the a “B” side generator. This effectively doubles the priority 1 load capabilities of the system because each side can be on in 10 s. Once they are on, the generators can synchronize and the tie breaker closes, creating a single bus, or the tie can remain open if design requires it. Typically the emergency distribution system is not the primary contributor of fault current, but when multiple generators are paralleled together, the fault can exceed that of the utility service. It is important that design engineers evaluate the fault both from a normal service and an emergency service standpoint. The example shown in Figure 2 is taken from a project where the emergency side generator fault (including the estimated fault contribution from the two future generators) is approximately 90,000 amps, significantly more than what is available at the utility service entrance. To further clarify the performance of a generator in a fault scenario the engineer must become familiar with the generator decrement curve. The decrement curve represents the fault output of a generator and is plotted as a function of various generator characteristics including subtransient reactance–Xd” (one to five cycles), transient reactance–Xd’ (five to 200 cycles), synchronous reactance Xd (above 200 cycles), subtransient time constant (Td”), transient time constant (Td’), armature short circuit time constant (Ta). The reactances are typically per unit values with the generator kVA and full load amps as the base. These values should be provided by the generator manufacturer, along with the a plot of the generator decrement curve. This document also should include the full load amperage of the generator, and the instantaneous fault output. Now that we have these values it is easy to determine what the instantaneous fault of the generator is. The equation for the instantaneous generator fault is Isc = Ea / Xd”, where Ea is the internal generated voltage identified a 1.0/ unit, simplifying the formula to Isc = 1 / Xd”. We should we evaluate instantaneous available fault current within our calculations because Generator Connection Cabinet Portable Generator Connection Made Safe and Easy! Don’t make backup power an afterthought The Berthold Electric Generator Connection Cabinet provides a quick and convenient station to safely connect a portable generator to a facility’s electrical power distribution system. User voltage– up to 600V 400A-3200A sizes Outdoor installation Save time & labor when connecting a rental generator. Share one generator among multiple facilities. Great for load banks, too. Applications: Telecommunications, hospitals, schools, industrial, commercial, and more. Berthold Electric Co. www.GenConCab.com 800-657-6650 Install a Berthold Electric Generator Connection Cabinet! The didn’t-plan-ahead way: Exposed energized parts and cables on the floor are safety and security hazards. Connection time: 8+ hours. www.GenConCab.com Input #213 at csemag.com/quickResponse The Berthold Electric way: All cables outdoors, no disruption to equipment or facility. Connection time: <1 hour. 22 Consulting-Specifying Engineer • NOVEMBER 2007 http://www.GenConCab.com http://www.GenConCab.com http://www.GenConCab.com http://csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer Contents Editor's Viewpoint Letters In The News M/E Roundtable Emergency Power for Healthcare 2007 Products of the Year Industrial-strength Lighting Hazardous HVAC Codes and Standards Management Report Jobs/Classifieds Specifier's Notebook On-Peak Performance Contents Best Battery Selector in Engine Starting Applications NEC 708: Practical Impact on Backup Power Systems Protecting Power: Specifying Outdoor Generator Enclosures Investing in Backup Power Systems Coes, Consultants, Manufacturers, and Standby Power Systems Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer - November 2007 - (Page Intro) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover2) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 2) Consulting-Specifying Engineer - November 2007 - Contents (Page 3) Consulting-Specifying Engineer - November 2007 - Contents (Page 4) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 5) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 6) Consulting-Specifying Engineer - November 2007 - Letters (Page 7) Consulting-Specifying Engineer - November 2007 - Letters (Page 8) Consulting-Specifying Engineer - November 2007 - In The News (Page 9) Consulting-Specifying Engineer - November 2007 - In The News (Page 10) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 11) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 18) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 19) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 20) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 21) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 22) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 23) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 24) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 25) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 26) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 27) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 28) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 29) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 30) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 31) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 32) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 33) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 34) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 35) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 36) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 37) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 38) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 39) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 40) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 41) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 42) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 43) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 44) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 45) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 46) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 47) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 48) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 49) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 50) Consulting-Specifying Engineer - November 2007 - Management Report (Page 51) Consulting-Specifying Engineer - November 2007 - Management Report (Page 52) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 53) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 54) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 55) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 56) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 57) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page 58) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover3) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover4) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S1) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S2) Consulting-Specifying Engineer - November 2007 - Contents (Page S3) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S4) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S5) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S6) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S7) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S8) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S9) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S10) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S11) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S12) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S13) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S14) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S15) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S16) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S17) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S18) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S19) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S20) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S21) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S22) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S23) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S24) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S25) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S26) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S27) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S28) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S29) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S30) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S31) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S32)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.