Consulting-Specifying Engineer - November 2007 - (Page 45) Exhaust design continues through the discharge stack. It is important that the hazardous vapors exhausted directly to the atmosphere for dilution not be recirculated back into the building Mathematical modeling, reduced-scale windtunnel studies or manual calculations are used to predict discharge stack behavior so recirculation cannot occur. Rain caps are inadvisable on exhaust stacks, because exhaust must discharge freely to the atmosphere. A minimum discharge velocity of 2,600 fpm will prevent rain from entering the stack when the fan is operating. Because rain has a terminal velocity of about 2,000 fpm a stack velocity of 3,000 fpm is recommended to resist downwash, increase effective stack height and allow a more optimum selection of the centrifugal exhaust fans to provide a stable operation point of the fan curve. High exhaust velocity is a poor substitute for stack height and effective stack design, unless one is specifying a high-plume exhaust fan that is designed for that application. With all these design parameters, don’t forget Undisturbed flow Roof recirculation region Roof wake boundry 1.5R 5:1 Uh Xc H hs Hc Lc 10:1 High turbulence region Building wake recirculation region L Lr Figure 2 Stack height design procedure. To manually predict stack exhaust behavior, determine the required stack height, represented by hs in the diagram. Source: ASHRAE that energy usage must be considered as well. As such, the guidelines provided in Chapter 44 of the 2007 ASHRAE Applications are an ideal source to manually predict stack exhaust behavior. A depiction of the design procedure for determining the required stack height, included in the ASHRAE Applications, is shown in Figure 2. At the end of the day, designing facilities with hazardous requirements can be challenging, but working out details through the design phase results in occupant safety and operations efficiency. Furthermore, involving the end user to understand the constraints of the control areas as they relate to the hazardous materials is vital in defining the requirements of the project as they relate to code regulations. Consulting-Specifying Engineer • NOVEMBER 2007 45
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer Contents Editor's Viewpoint Letters In The News M/E Roundtable Emergency Power for Healthcare 2007 Products of the Year Industrial-strength Lighting Hazardous HVAC Codes and Standards Management Report Jobs/Classifieds Specifier's Notebook On-Peak Performance Contents Best Battery Selector in Engine Starting Applications NEC 708: Practical Impact on Backup Power Systems Protecting Power: Specifying Outdoor Generator Enclosures Investing in Backup Power Systems Coes, Consultants, Manufacturers, and Standby Power Systems Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer - November 2007 - (Page Intro) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover2) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 2) Consulting-Specifying Engineer - November 2007 - Contents (Page 3) Consulting-Specifying Engineer - November 2007 - Contents (Page 4) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 5) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 6) Consulting-Specifying Engineer - November 2007 - Letters (Page 7) Consulting-Specifying Engineer - November 2007 - Letters (Page 8) Consulting-Specifying Engineer - November 2007 - In The News (Page 9) Consulting-Specifying Engineer - November 2007 - In The News (Page 10) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 11) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 18) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 19) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 20) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 21) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 22) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 23) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 24) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 25) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 26) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 27) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 28) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 29) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 30) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 31) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 32) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 33) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 34) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 35) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 36) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 37) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 38) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 39) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 40) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 41) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 42) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 43) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 44) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 45) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 46) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 47) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 48) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 49) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 50) Consulting-Specifying Engineer - November 2007 - Management Report (Page 51) Consulting-Specifying Engineer - November 2007 - Management Report (Page 52) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 53) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 54) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 55) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 56) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 57) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page 58) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover3) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover4) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S1) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S2) Consulting-Specifying Engineer - November 2007 - Contents (Page S3) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S4) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S5) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S6) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S7) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S8) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S9) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S10) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S11) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S12) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S13) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S14) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S15) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S16) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S17) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S18) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S19) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S20) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S21) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S22) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S23) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S24) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S25) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S26) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S27) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S28) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S29) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S30) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S31) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S32)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.