Consulting-Specifying Engineer - November 2007 - (Page 51) Management Report Controlling HVAC intelligently BY JARED MALARSKY, China business manager, ARC Advisory Group, Dedham, Mass. he HVAC controls market exceeded $10 billion in 2006 and is forecasted to continue growing at a compounded annual growth rate of nearly 4% over the next five years, hitting $13 billion in 2011. One of the key factors contributing to the growth is the drive to upgrade and efficiently operate the aging facilities in the mature markets of North America and Europe. In response to increasing interest in this market, ARC Advisory Group, Dedham, Mass., conducted a study to validate the trends and drivers affecting this market. Although the HVAC controls market is stable, it is nonetheless undergoing some significant changes, as ARC’s research identified. This article highlights findings in the report concerning manufacturers and buying preferences of owners that are of interest to the engineering community. System upgrades and replacement represent 28% and 25% of revenue, respectively, and these numbers are higher when only looking at the developed markets of North America and Europe, owing to their installed bases. Traditionally, once a supplier installed a proprietary system in a building, the supplier could count on many years of steady replacement and upgrade business. As today’s building owners become more sophisticated, they value the flexibility of pursuing best-of-breed solutions. However, at the end of the day, most building owners are cost-conscious and want to replace or upgrade only bad components, not the entire system. Owners also want to be able to place multiple buildings on a single network integrating systems from different suppliers. In this way, the installed base is driving the move toward open platforms and easy IT-based integration between newer systems and legacy systems. T With this shift, a dilemma crops up in the minds of suppliers. As the open systems that suppliers reluctantly have developed begin to allow existing customers to shop around when upgrading or replacing system components, more pressure is put on suppliers to differentiate in order to maintain the relationship with their customers. Suppliers have responded by offering innovative hardware. However, there will be less of a distinguishing characteristic going forward, because many of the controllers and associated hardware devices can be sourced cheaply as commodities from low-cost manufacturers in Asia. At your service Service is where leading suppliers can best leverage their decades of experience and engineering resources, and this is where most suppliers are making their most concerted efforts to differentiate themselves. Survey methodology This report looks at who are the leading suppliers of HVAC control systems, what challenges and opportunities are driving the market, and what the growth path is likely to be over a five-year forecast period. The market is broken down into segmentations including hardware, software, and services; world region; market sector or vertical; building size; and sales channel. Data for the report were gathered through interviews with senior executives of leading HVAC controls suppliers, secondary research, and from ARC’s extensive database. ARC’s report focuses on the intelligent control portion of HVAC systems such as controllers, software, and human-machine interface, and excludes equipment such as chillers, fans, and sensors. Consulting-Specifying Engineer • NOVEMBER 2007 61 51
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer Contents Editor's Viewpoint Letters In The News M/E Roundtable Emergency Power for Healthcare 2007 Products of the Year Industrial-strength Lighting Hazardous HVAC Codes and Standards Management Report Jobs/Classifieds Specifier's Notebook On-Peak Performance Contents Best Battery Selector in Engine Starting Applications NEC 708: Practical Impact on Backup Power Systems Protecting Power: Specifying Outdoor Generator Enclosures Investing in Backup Power Systems Coes, Consultants, Manufacturers, and Standby Power Systems Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer - November 2007 - (Page Intro) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover2) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 2) Consulting-Specifying Engineer - November 2007 - Contents (Page 3) Consulting-Specifying Engineer - November 2007 - Contents (Page 4) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 5) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 6) Consulting-Specifying Engineer - November 2007 - Letters (Page 7) Consulting-Specifying Engineer - November 2007 - Letters (Page 8) Consulting-Specifying Engineer - November 2007 - In The News (Page 9) Consulting-Specifying Engineer - November 2007 - In The News (Page 10) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 11) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 18) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 19) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 20) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 21) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 22) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 23) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 24) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 25) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 26) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 27) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 28) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 29) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 30) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 31) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 32) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 33) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 34) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 35) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 36) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 37) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 38) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 39) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 40) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 41) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 42) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 43) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 44) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 45) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 46) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 47) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 48) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 49) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 50) Consulting-Specifying Engineer - November 2007 - Management Report (Page 51) Consulting-Specifying Engineer - November 2007 - Management Report (Page 52) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 53) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 54) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 55) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 56) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 57) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page 58) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover3) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover4) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S1) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S2) Consulting-Specifying Engineer - November 2007 - Contents (Page S3) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S4) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S5) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S6) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S7) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S8) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S9) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S10) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S11) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S12) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S13) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S14) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S15) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S16) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S17) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S18) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S19) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S20) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S21) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S22) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S23) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S24) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S25) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S26) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S27) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S28) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S29) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S30) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S31) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S32)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.