Consulting-Specifying Engineer - November 2007 - (Page 7) staff EDITORIAL STAFF MICHAEL G. IVANOVICH, Editor-in-Chief michael.ivanovich@reedbusiness.com SCOTT SIDDENS, Senior Editor ssiddens@reedbusiness.com AMARA ROZGUS, Senior Editor & Manager of E-Content amara.rozgus@reedbusiness.com MELISSA HILLEBRAND, Associate Editor melissa.hillebrand@reedbusiness.com PATRICK LYNCH, Editorial lntern patrick.lynch@reedbusiness.com DIRK CHRISTENSEN, Web site Specialist MYLES ADAMSON, Art Director BARBARA HORWITZ-BENNETT, Contributing Editor CONSULTING EDITORS ANIL AHUJA, PE, LEED AP, RCDD, CCJM Engineers, Chicago PAT BANSE, PE, LEED AP, Senior Mechanical Engineer Smith Seckman Reid Inc., Houston FLOYD BARWIG, AIA, Director, Iowa Engineering Center, Ames ALFRED R. BORDEN IV, IALD, The Lighting Practice, Philadelphia DAVID COOPER, PE, C.E.M., Executive Vice President Flack + Kurtz, New York PETER D’ANTONIO, PE, LEED AP, President PCD Engineering Services Inc., Longmont, Colo. RAJ P. GUPTA, PE, President Environmental Systems Design Inc., Chicago WILLIAM KOSIK, PE, LEED AP, Managing Principal EYP Mission Critical Facilities Inc., Chicago KEITH LANE, PE, RCDD, LC, LEED AP, Partner/Principal Lane Coburn & Assocs., Seattle KENNETH L. LOVORN, PE, President Lovorn Engineering Assocs., Pittsburgh JOHN MAGLIANO, PE, Syska Hennessy Group, New York ERIN MCCONAHEY, PE, Associate Principal, Arup, Los Angeles SYED PEERAN, PE, Ph.D., Senior Engineer Camp Dresser & McKee, Inc., Cambridge, Mass. JOHN M. RATTENBURY, PE, LEED AP, VP of Engineering Rainwater Management Solutions, Salem, Va. MARTIN H. REISS, PE, The RJA Group, Inc., Framingham, Mass. DAVID SELLERS, PE, Senior Engineer Facility Dynamics Engineering Inc., Portland, Ore. ALAN TRAUGOTT, Principal, CJL Engineering, Moon Township, Pa. PETER D. ZAK, PE, Principal Graef, Anhalt, Schloemer & Assocs. Inc., Milwaukee PUBLICATION SERVICES JIM LANGHENRY, Publisher 630-288-8789 jlanghenry@reedbusiness.com TRUDY KELLY, Assistant to the Publisher ELENA MOELLER-YOUNGER, Marketing Director ALLISON TERNES, Audience Marketing Director ELETTA HARRIS, Production Manager FELECIA STEPHENS, Advertising Services Consulting-Specifying Engineer’s editorial offices are located at 2000 Clearwater Dr., Oak Brook, IL 60523. Phone 630-288-8000. For subscription information, call 303-470-4445 or go to: getFREEmag.com/cse. For reprints, call 800-290-5460 x100 or e-mail CSE@reprintbuyer.com. REED BUSINESS INFORMATION Founded in 1933 Tad Smith, Chief Executive Officer Jeff Greisch, President, Chicago Division Letters READER FEEDBACK (www.csemag.com, 10/22/07) said that “the energy used by commercial and industrial buildings in the United States is responsible for 45% of the nation’s greenhouse gas emissions.” This is encouraging for the potential to make a big dent in those emissions. Although most domestic and non-domestic buildings are very wasteful of energy, in many ways that waste is easier to tackle in non-domestic buildings: First, the energy bill is usually much higher in non-domestic buildings, so there are greater financial rewards to be achieved by investing time into improving energy efficiency. There’s a big economyof-scale effect in the savings that can be achieved by investing time into energy management. Second, the larger the building, the greater the chance that it already has interval metering equipment and access to interval energy data from that equipment. For buildings that don’t have such equipment, the larger they are, the greater the payback from investing in such equipment. Analysis of such interval energy data for energy management purposes can easily lead to identification of huge sources of energy waste that would be very difficult to find without that data. Admittedly, these benefits will spread into the domestic sector as interval metering catches on there. Ultimately, the greatest energy saving are from motivating people to do their bit. This can be difficult in a work or home environment, but initiatives such as the Kilowatt Crackdown can make a huge difference. MARTIN BROMLEY ENERGY MANAGEMENT CONSULTANT VIA THE INTERNET Power for security In the article “Quality Power for Security Systems” (Pure Power, Fall 2007, p. 17) the author gives “underground local metal structures (gas piping, for example)” as one of the legal ways of connecting a grounding system to the earth. The author refers to the National Electrical Code for the listing. But according to NEC Article 250-52(a), “a metal underground gas piping shall not be used as a grounding electrode.” Can the author expand on this? IGOR A. ALTSHULER ENGINEER BALTIMORE VIA THE INTERNET Author responds: Indeed, you are most correct. The statement should have read “Other local metal underground piping (except gas lines).” Likewise, tanks that have been used to store explosive or hazardous contents should not be used as supplemental grounding electrodes. An acceptable example would be an abandoned underground metallic water storage tank that has been filled with moist sand. JAY ADAMS APPLICATIONS ENGINEER TRANSTECTOR SYSTEMS HAYDEN, IDAHO Energy efficiency The story “The climate has changed for energy efficiency” Consulting-Specifying Engineer • NOVEMBER 2007 7 http://www.csemag.com http://getFREEmag.com/cse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer Contents Editor's Viewpoint Letters In The News M/E Roundtable Emergency Power for Healthcare 2007 Products of the Year Industrial-strength Lighting Hazardous HVAC Codes and Standards Management Report Jobs/Classifieds Specifier's Notebook On-Peak Performance Contents Best Battery Selector in Engine Starting Applications NEC 708: Practical Impact on Backup Power Systems Protecting Power: Specifying Outdoor Generator Enclosures Investing in Backup Power Systems Coes, Consultants, Manufacturers, and Standby Power Systems Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer - November 2007 - (Page Intro) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover2) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 2) Consulting-Specifying Engineer - November 2007 - Contents (Page 3) Consulting-Specifying Engineer - November 2007 - Contents (Page 4) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 5) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 6) Consulting-Specifying Engineer - November 2007 - Letters (Page 7) Consulting-Specifying Engineer - November 2007 - Letters (Page 8) Consulting-Specifying Engineer - November 2007 - In The News (Page 9) Consulting-Specifying Engineer - November 2007 - In The News (Page 10) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 11) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 18) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 19) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 20) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 21) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 22) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 23) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 24) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 25) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 26) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 27) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 28) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 29) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 30) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 31) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 32) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 33) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 34) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 35) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 36) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 37) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 38) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 39) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 40) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 41) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 42) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 43) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 44) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 45) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 46) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 47) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 48) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 49) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 50) Consulting-Specifying Engineer - November 2007 - Management Report (Page 51) Consulting-Specifying Engineer - November 2007 - Management Report (Page 52) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 53) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 54) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 55) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 56) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 57) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page 58) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover3) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover4) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S1) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S2) Consulting-Specifying Engineer - November 2007 - Contents (Page S3) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S4) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S5) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S6) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S7) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S8) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S9) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S10) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S11) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S12) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S13) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S14) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S15) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S16) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S17) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S18) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S19) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S20) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S21) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S22) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S23) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S24) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S25) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S26) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S27) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S28) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S29) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S30) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S31) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S32)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.