Consulting-Specifying Engineer - November 2007 - (Page S4) on-peakperformance Best Battery Selector By Mike Benson and Bill Kaewert President Stored Energy Systems Longmont, Colo. >>>>>>>>>>>>>> in Engine Starting Using a BBS in engine starting systems adds up to reliability when one battery fails. >> A best battery selector (BBS) in engine starting systems enables use of two independent batteries to increase starting system reliability. In other words, if one battery fails, there is backup. In this case, the term “battery” means multiple cells connected in series. There are two reasons for using a BBS and two separate batteries—here we’ll call them “Battery A” and “Battery B”: 1) The engine can be started even if one battery fails (dead, short, or low voltage). 2) The failed battery is automatically isolated from the good battery, preventing a discharge path from the good battery into the failed battery. What’s a BBS? A properly engineered BBS consists of two highcurrent diodes, specialized heat sinks, voltage surge protection, and high-current terminals assembled and mounted in a metal housing. Each diode Normal Operation Batteries each provide ~50% power allows starter-motor cranking current to flow in the forward direction, but blocks current from flowing in the reverse direction. The BBS is so named because the best battery is the one that provides the majority of current to the starter. Because a BBS is a passive device, it does not perform any switching or control functions, so the best battery is selected in a passive manner, based on the principle that current flows from the source of the highest voltage. In a system that has well-matched batteries and cabling, under normal operating conditions, two good batteries will each provide about 50% of the total power delivered to the starters. In the case of a partial battery failure, the stronger battery will supply the majority of the starter current. But with total battery failure, the remaining battery becomes the “best battery” and provides 100% of the power delivered to the starter. Figure 1 below shows a starting system drawing 2,000 amps. Battery B FAILED Current flows to the starter and NOT into failed Battery B (Battery A current is blocked by Battery B’s diode) Battery B Battery A Battery B Failed + - Battery A BBS BBS - + + - - + 1,000 amps 1,000 amps 2,000 amps 0 amps 2,000 amps Starter 2,000 amps Starter current is blocked here Figure 1 - In this system that draws a starter current of 2,000 amps, when Battery B fails, current flows into the starter and not into the failed battery. The BBS couples good batteries and isolates a failed battery. 4 november2007
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer Contents Editor's Viewpoint Letters In The News M/E Roundtable Emergency Power for Healthcare 2007 Products of the Year Industrial-strength Lighting Hazardous HVAC Codes and Standards Management Report Jobs/Classifieds Specifier's Notebook On-Peak Performance Contents Best Battery Selector in Engine Starting Applications NEC 708: Practical Impact on Backup Power Systems Protecting Power: Specifying Outdoor Generator Enclosures Investing in Backup Power Systems Coes, Consultants, Manufacturers, and Standby Power Systems Consulting-Specifying Engineer - November 2007 Consulting-Specifying Engineer - November 2007 - (Page Intro) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page Cover2) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 1) Consulting-Specifying Engineer - November 2007 - Consulting-Specifying Engineer (Page 2) Consulting-Specifying Engineer - November 2007 - Contents (Page 3) Consulting-Specifying Engineer - November 2007 - Contents (Page 4) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 5) Consulting-Specifying Engineer - November 2007 - Editor's Viewpoint (Page 6) Consulting-Specifying Engineer - November 2007 - Letters (Page 7) Consulting-Specifying Engineer - November 2007 - Letters (Page 8) Consulting-Specifying Engineer - November 2007 - In The News (Page 9) Consulting-Specifying Engineer - November 2007 - In The News (Page 10) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 11) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 12) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 13) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 14) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2007 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 18) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 19) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 20) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 21) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 22) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 23) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 24) Consulting-Specifying Engineer - November 2007 - Emergency Power for Healthcare (Page 25) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 26) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 27) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 28) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 29) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 30) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 31) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 32) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 33) Consulting-Specifying Engineer - November 2007 - 2007 Products of the Year (Page 34) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 35) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 36) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 37) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 38) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 39) Consulting-Specifying Engineer - November 2007 - Industrial-strength Lighting (Page 40) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 41) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 42) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 43) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 44) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 45) Consulting-Specifying Engineer - November 2007 - Hazardous HVAC (Page 46) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 47) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 48) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 49) Consulting-Specifying Engineer - November 2007 - Codes and Standards (Page 50) Consulting-Specifying Engineer - November 2007 - Management Report (Page 51) Consulting-Specifying Engineer - November 2007 - Management Report (Page 52) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 53) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 54) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 55) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 56) Consulting-Specifying Engineer - November 2007 - Jobs/Classifieds (Page 57) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page 58) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover3) Consulting-Specifying Engineer - November 2007 - Specifier's Notebook (Page Cover4) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S1) Consulting-Specifying Engineer - November 2007 - On-Peak Performance (Page S2) Consulting-Specifying Engineer - November 2007 - Contents (Page S3) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S4) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S5) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S6) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S7) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S8) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S9) Consulting-Specifying Engineer - November 2007 - Best Battery Selector in Engine Starting Applications (Page S10) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S11) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S12) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S13) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S14) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S15) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S16) Consulting-Specifying Engineer - November 2007 - NEC 708: Practical Impact on Backup Power Systems (Page S17) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S18) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S19) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S20) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S21) Consulting-Specifying Engineer - November 2007 - Protecting Power: Specifying Outdoor Generator Enclosures (Page S22) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S23) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S24) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S25) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S26) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S27) Consulting-Specifying Engineer - November 2007 - Investing in Backup Power Systems (Page S28) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S29) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S30) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S31) Consulting-Specifying Engineer - November 2007 - Coes, Consultants, Manufacturers, and Standby Power Systems (Page S32)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.