Consulting-Specifying Engineer - November 2008 - (Page 15) PARTICIPANTS M/E Roundtable Joel Londenberg Project Manager, Design West Engineering, San Bernardino, Calif Is BIM ready for prime time engineered systems? Mechanical, electrical, and plumbing engineers have justifiably lagged behind architects and structural engineers in their use of building information modeling (BIM) software. Is it the right time for them to upgrade? BY MICHAEL IVANOVICH, Editor-in-Chief, PATRICK LYNCH, Associate Editor CSE: Explain why BIM is or is not ready fo r p rime time amo n g M E P d esig n firms. Robert Middlebrooks: Building Information Modeling is more than just software—it is an integrated design process built on coordinated, reliable information about a project from design through to construction and operation. Using BIM, engineers can generate and exchange information and create digital representations of all phases of the design process. The more appropriate question would be, is the MEP firm ready for BIM? We see many MEP engineering firms moving to BIM to meet requirements for sustainable design, 3-D coordination, visualization, simulation, and analysis. Firms transitioning must absorb learning curves, which will be minimal in comparison to the productivity increases possible with solutions specifically built for MEP firms. Joel Londenberg: BIM is about adding more information to the final product. Currently there are BIM software tools that are entirely useable for day-to-day design and documentation tasks. It takes more effort in part because we are adding more information than in previous design/documentation methods. Using this different method also requires a willingness to make some changes in the appearance of an engineer’s final product, construction documents, and willingness to spend the time to learn something new. Shreshth Nagpal: With regard to BIM tools, while information modeling for architectural and structural aspects has been evolving for almost a decade, MEP-BIM is relatively recent. In addition to modeling in lieu of drawing, BIM requires all relevant information about each individual component to be embedded into the model. MEP design involves more technical/ industrial components and connections when compared to architectural modeling. This brings a lot of concern regarding whether all component blocks and modules are readily available. Understandably, generating custom BIM blocks requires much more time and is more effort intensive than developing custom CAD blocks. As for the BIM process, the transition from how most MEP design firms perceive design currently is completely different from the way BIM envisions it to be. Much like the name, designs have to transcend from drawings (2-D or even 3-D) and get into information modeling. This entails more effort in putting together the building information model before the design drawings could be extracted out of it. Along with the time and effort required, there is a steep learning curve for designers to understand the information-modeling process, and most design firms are at the beginning of the curve. Kevin Settlemyre: BIM to me is the building Robert E. Middlebrooks, AIA Autodesk Industry Programs Manager Autodesk, Inc. Waltham, MA Shreshth Nagpal, LEED AP Sustainability Specialist Syska Hennessy Group Washington, D.C. Kevin Settlemyre Sustainability Consultant and Head of IES, North American Operations Integrated Environmental Solutions Boston Brad Workman Vice President of Building and Plant Solutions Bentley Exton, Penn. Consulting-Specifying Engineer • NOVEMBER 2008 15
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 Contents Viewpoint News M/E Roundtable Comissioning Lighting Controls Prevent Plugholing: Smoke Control Done Right Commercial Geothermal Heating and Cooling System Design Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover2) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 2) Consulting-Specifying Engineer - November 2008 - Contents (Page 3) Consulting-Specifying Engineer - November 2008 - Contents (Page 4) Consulting-Specifying Engineer - November 2008 - Contents (Page 5) Consulting-Specifying Engineer - November 2008 - Contents (Page 6) Consulting-Specifying Engineer - November 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - November 2008 - News (Page 8) Consulting-Specifying Engineer - November 2008 - News (Page 9) Consulting-Specifying Engineer - November 2008 - News (Page 10) Consulting-Specifying Engineer - November 2008 - News (Page 11) Consulting-Specifying Engineer - November 2008 - News (Page 12) Consulting-Specifying Engineer - November 2008 - News (Page 13) Consulting-Specifying Engineer - November 2008 - News (Page 14) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 22) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 23) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 24) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 25) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 26) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 27) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 28) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 29) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 30) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 31) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 32) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 33) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 34) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 35) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 36) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 37) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 38) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 39) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 40) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 41) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 42) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 43) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 44) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 45) Consulting-Specifying Engineer - November 2008 - Case Study (Page 46) Consulting-Specifying Engineer - November 2008 - Case Study (Page 47) Consulting-Specifying Engineer - November 2008 - Case Study (Page 48) Consulting-Specifying Engineer - November 2008 - Case Study (Page 49) Consulting-Specifying Engineer - November 2008 - New Products (Page 50) Consulting-Specifying Engineer - November 2008 - New Products (Page 51) Consulting-Specifying Engineer - November 2008 - New Products (Page 52) Consulting-Specifying Engineer - November 2008 - New Products (Page 53) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 54) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 55) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56A) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56B) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 66) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - November 2008 - Green Space (Page 68) Consulting-Specifying Engineer - November 2008 - Green Space (Page 69) Consulting-Specifying Engineer - November 2008 - Green Space (Page 70) Consulting-Specifying Engineer - November 2008 - Green Space (Page S1) Consulting-Specifying Engineer - November 2008 - Green Space (Page S2) Consulting-Specifying Engineer - November 2008 - Green Space (Page S3) Consulting-Specifying Engineer - November 2008 - Green Space (Page S4) Consulting-Specifying Engineer - November 2008 - Green Space (Page S5) Consulting-Specifying Engineer - November 2008 - Green Space (Page S6) Consulting-Specifying Engineer - November 2008 - Green Space (Page S7) Consulting-Specifying Engineer - November 2008 - Green Space (Page S8) Consulting-Specifying Engineer - November 2008 - Green Space (Page S9) Consulting-Specifying Engineer - November 2008 - Green Space (Page S10) Consulting-Specifying Engineer - November 2008 - Green Space (Page S11) Consulting-Specifying Engineer - November 2008 - Green Space (Page S12) Consulting-Specifying Engineer - November 2008 - Green Space (Page S13) Consulting-Specifying Engineer - November 2008 - Green Space (Page S14) Consulting-Specifying Engineer - November 2008 - Green Space (Page S15) Consulting-Specifying Engineer - November 2008 - Green Space (Page S16) Consulting-Specifying Engineer - November 2008 - Green Space (Page S17) Consulting-Specifying Engineer - November 2008 - Green Space (Page S18) Consulting-Specifying Engineer - November 2008 - Green Space (Page S19) Consulting-Specifying Engineer - November 2008 - Green Space (Page S20) Consulting-Specifying Engineer - November 2008 - Green Space (Page S21) Consulting-Specifying Engineer - November 2008 - Green Space (Page S22) Consulting-Specifying Engineer - November 2008 - Green Space (Page S23) Consulting-Specifying Engineer - November 2008 - Green Space (Page S24) Consulting-Specifying Engineer - November 2008 - Green Space (Page S25) Consulting-Specifying Engineer - November 2008 - Green Space (Page S26) Consulting-Specifying Engineer - November 2008 - Green Space (Page S27) Consulting-Specifying Engineer - November 2008 - Green Space (Page S28) Consulting-Specifying Engineer - November 2008 - Green Space (Page S29) Consulting-Specifying Engineer - November 2008 - Green Space (Page S30) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.