Consulting-Specifying Engineer - November 2008 - (Page 35) Outside air Exhaust air Fan Heat exchanger Fan Exhaust air from spaces Balance damper Return air Heat pump Heat pump Heat pump Supply air VFD (secondary loop) Maximum 4 pipe dia. Differential pressure transducer Supplemental cooling (heating) source Borehole V-1 ventilation mode valve Borehole Borehole VFD (primary loop) Figure 1a Primary/secondary loop configuration with dedicated outdoor air and GSHP ventilation mode. Source: Peter D’Antonio, PCD Engineering Services Figure 1b depicts a piping variation to 1a, where the building loop and ground loop are tied together as a single primary loop. The ventilation mode also exists in this variation and is controlled by valve V-1. Switching to ventilation mode in this scenario will bypass the ground loop, reducing pipe friction loss and pumping energy. Another scenario has been employed in smaller commercial facilities as shown in Figure 2. Water-to-water heat pumps are arranged in a centralized system, and hot and chilled water is fed to buffer tanks. This is termed the “charging loop.” The buffer tanks serve to decouple the primary loop from the distribution loop and accommodate the differing flow rates in the tank charging loop and distribution loop. These systems also are a useful design option when the facility has a mix of heating systems, such as radiant and forced air, and to reduce or prevent short cycling of the central plant equipment/heat pump unit(s) in a system with small water volumes and variable loads. This system is in use at the 8,000-sq-ft Morningstar Learning Center in Big Sky, Mont. Outdoor air for either scenario can be effectively introduced through a dedicated outdoor air system. The outdoor air can be tempered to a neutral temperature of roughly 65 F using any number of sources including a fossil fuel heating system, air conditioning, or heat pump system. Greatest efficiency is gained when the outdoor air is fed into a heat or energy recovery device whereby the exhaust air energy is transferred to the incoming outdoor air as shown in Figure 1a. The ground piping loop, or loopfield, comes in two main forms, open or closed. The three most common geothermal systems are all closed-loop, and include the horizontal (including slinky approach), pond/lake installation, or vertical borehole installation. This article will focus on the vertical as it represents the largest market share of all systems installed, is the predominant choice in commercial construction, and often provides the most efficient use of space. The ground loop can be a single common loop for all heat pumps in the system or can serve each heat pump or small group of heat pumps with its/their own bore(s). The latter is appropriate in single-story buildings with small core areas or when retrofitting an existing building. The former is used for multistory buildings or large core areas to take advantage of load diversity. To heat pumps (see fig 1a) Borehole Borehole Borehole VFD V-1 ventilation mode valve Figure 1b Primary loop configuration. Source: Peter D’Antonio, PCD Engineering Services Consulting-Specifying Engineer • NOVEMBER 2008 35
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 Contents Viewpoint News M/E Roundtable Comissioning Lighting Controls Prevent Plugholing: Smoke Control Done Right Commercial Geothermal Heating and Cooling System Design Codes &Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover2) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 2) Consulting-Specifying Engineer - November 2008 - Contents (Page 3) Consulting-Specifying Engineer - November 2008 - Contents (Page 4) Consulting-Specifying Engineer - November 2008 - Contents (Page 5) Consulting-Specifying Engineer - November 2008 - Contents (Page 6) Consulting-Specifying Engineer - November 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - November 2008 - News (Page 8) Consulting-Specifying Engineer - November 2008 - News (Page 9) Consulting-Specifying Engineer - November 2008 - News (Page 10) Consulting-Specifying Engineer - November 2008 - News (Page 11) Consulting-Specifying Engineer - November 2008 - News (Page 12) Consulting-Specifying Engineer - November 2008 - News (Page 13) Consulting-Specifying Engineer - November 2008 - News (Page 14) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 22) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 23) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 24) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 25) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 26) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 27) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 28) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 29) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 30) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 31) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 32) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 33) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 34) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 35) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 36) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 37) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 38) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 39) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 40) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 41) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 42) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 43) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 44) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 45) Consulting-Specifying Engineer - November 2008 - Case Study (Page 46) Consulting-Specifying Engineer - November 2008 - Case Study (Page 47) Consulting-Specifying Engineer - November 2008 - Case Study (Page 48) Consulting-Specifying Engineer - November 2008 - Case Study (Page 49) Consulting-Specifying Engineer - November 2008 - New Products (Page 50) Consulting-Specifying Engineer - November 2008 - New Products (Page 51) Consulting-Specifying Engineer - November 2008 - New Products (Page 52) Consulting-Specifying Engineer - November 2008 - New Products (Page 53) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 54) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 55) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56A) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56B) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 66) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - November 2008 - Green Space (Page 68) Consulting-Specifying Engineer - November 2008 - Green Space (Page 69) Consulting-Specifying Engineer - November 2008 - Green Space (Page 70) Consulting-Specifying Engineer - November 2008 - Green Space (Page S1) Consulting-Specifying Engineer - November 2008 - Green Space (Page S2) Consulting-Specifying Engineer - November 2008 - Green Space (Page S3) Consulting-Specifying Engineer - November 2008 - Green Space (Page S4) Consulting-Specifying Engineer - November 2008 - Green Space (Page S5) Consulting-Specifying Engineer - November 2008 - Green Space (Page S6) Consulting-Specifying Engineer - November 2008 - Green Space (Page S7) Consulting-Specifying Engineer - November 2008 - Green Space (Page S8) Consulting-Specifying Engineer - November 2008 - Green Space (Page S9) Consulting-Specifying Engineer - November 2008 - Green Space (Page S10) Consulting-Specifying Engineer - November 2008 - Green Space (Page S11) Consulting-Specifying Engineer - November 2008 - Green Space (Page S12) Consulting-Specifying Engineer - November 2008 - Green Space (Page S13) Consulting-Specifying Engineer - November 2008 - Green Space (Page S14) Consulting-Specifying Engineer - November 2008 - Green Space (Page S15) Consulting-Specifying Engineer - November 2008 - Green Space (Page S16) Consulting-Specifying Engineer - November 2008 - Green Space (Page S17) Consulting-Specifying Engineer - November 2008 - Green Space (Page S18) Consulting-Specifying Engineer - November 2008 - Green Space (Page S19) Consulting-Specifying Engineer - November 2008 - Green Space (Page S20) Consulting-Specifying Engineer - November 2008 - Green Space (Page S21) Consulting-Specifying Engineer - November 2008 - Green Space (Page S22) Consulting-Specifying Engineer - November 2008 - Green Space (Page S23) Consulting-Specifying Engineer - November 2008 - Green Space (Page S24) Consulting-Specifying Engineer - November 2008 - Green Space (Page S25) Consulting-Specifying Engineer - November 2008 - Green Space (Page S26) Consulting-Specifying Engineer - November 2008 - Green Space (Page S27) Consulting-Specifying Engineer - November 2008 - Green Space (Page S28) Consulting-Specifying Engineer - November 2008 - Green Space (Page S29) Consulting-Specifying Engineer - November 2008 - Green Space (Page S30) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.