Consulting-Specifying Engineer - November 2008 - (Page 41) Purge port (at system high point) Ground-Coupled Heat Pump Systems, available from the IGSHPA (www.igshpa.okstate.edu). Since thermal conductivity (Btu/h-ft-°F) and thermal diffusivity are the most important design variables to consider before attempting to design a commercial geothermal system, an in-situ thermal conductivity test may be warranted for a project. The test runs typically 48 hours and requires a test bore with a unicoil that has been backfilled with grout. The test can typically begin five to seven days after the test bore has been completed and should follow the recommended procedures in the ASHRAE Handbook, HVAC Applications. A detailed drill log must be kept to assist in the proper estimating of drill costs as well as conductivity heat transfer. The test will provide information about drilling conditions, the types of soil present, thermal properties of the soil, and deep-earth temperatures. Generally, soil conductivity tests are conducted on systems larger than 20 tons, as design variations in loop sizing assumptions do not have a significant impact on installed costs for smaller systems. Typical costs for the test per borehole are $6,000 to $11,000, and the borehole can be reused for the installed system. Importance of commissioning A system is only as good as its design and installation, and performance testing must be mandated in any commercial GSHP system. Good commissioning practice will verify proper water and air flow through each heat pump, the heat pump capacity and efficiency, and the ground loop installation. All ground installations must be flushed to remove construction debris, purged to remove air, and pressure tested to 100 psi, or the requirement of the authority having jurisdiction, before backfilling or grouting. Figure 3 shows locations of purge ports required to effectively purge air from a geothermal loop. Operating efficiencies should be verified using the following equations: Cooling Efficiency (Imperial Units) • Heat from electrical energy (Btu) = V x amp x Power Factor x 3.412 Btu/W (single-phase electrical power) • Heat rejected from loop (Btu) = GPM x Delta T x 485 (water/antifreeze loop) • Net cooling capacity (Btu) = heat rejected from loop (Btu) – heat from electrical energy (Btu) • Total cooling capacity (Btu) = heat rejected from loop (Btu) + heat from electrical energy (Btu) • EER = Net cooling capacity (Btu)/W Heat pump Air vent (optional) Expansion tank (optional) Purge port Borehole field Cold water make-up Figure 3 Purge port configuration. Source: Peter D’Antonio, PCD Engineering Services Heating Efficiency (Imperial Units) • Heat from electrical energy (Btu) = V x amp x Power Factor x 3.412 Btu/W (single phase) • Heat absorbed from loop (Btu) = GPM x Delta T x 485 (water/ antifreeze loop) • Total heating capacity (Btu) = heat absorbed from loop (Btu) + heat from electrical energy (Btu) • COP = Total heating capacity (Btu)/heat from electrical energy (Btu) GSHP systems have enjoyed a surge in recent years thanks to developments within the industry and the push toward more energy- and environmentally efficient buildings. However, there is still uncertainty about first cost, lifecycle cost, operation and maintenance, and system long-term reliability. In order to achieve broader acceptance, mechanical design teams must have a better understanding of not only the economic, environmental, and comfort benefits that these systems can provide, but also the long-term operational, maintenance, and reliability issues that they can expect to face over the life of the system. D’Antonio is president of PCD Engineering Services, a provider of energy and environmental efficiency in buildings. He is a member of Consulting-Specifying Engineer’s editorial advisory board and a 2008 “40 Under Online resources 40” honoree. Here is a partial list of resources related to the design of geothermal systems: References 1. Kavanaugh, S. P., et al. 1997. Ground-source • www.igshpa.okstate.edu/publication heat pumps: Design of geothermal systems /publication.htm for commercial and institutional buildings. • www.geoexchangebc.ca/pdf/ahsrae ASHRAE. _april292005.pdf 2. Shonder, John A. and Patrick J. Hughes, PE. • www.geoexchangebc.ca/products Increasing confidence in geothermal heat pump design methods. Oak Ridge National Laboratory, .aspx Oak Ridge, Tenn. 1998. • www.nyserda.org/programs/ 3. ASHRAE. 2002. Commissioning, preventative geothermal/geothermal_manual.pdf maintenance, and troubleshooting guide for • www.nyc.gov/html/ddc/downloads/pdf commercial ground-source heat pump systems. /geotherm.pdf ASHRAE SP-94, 2002. Consulting-Specifying Engineer • NOVEMBER 2008 41 http://www.igshpa.okstate.edu http://www.igshpa.okstate.edu/publication/publication.htm http://www.igshpa.okstate.edu/publication/publication.htm http://www.geoexchangebc.ca/pdf/ahsrae_april292005.pdf http://www.geoexchangebc.ca/pdf/ahsrae_april292005.pdf http://www.geoexchangebc.ca/products.aspx http://www.geoexchangebc.ca/products.aspx http://www.nyserda.org/programs/geothermal/geothermal_manual.pdf http://www.nyserda.org/programs/geothermal/geothermal_manual.pdf http://www.nyc.gov/html/ddc/downloads/pdf/geotherm.pdf http://www.nyc.gov/html/ddc/downloads/pdf/geotherm.pdf
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 Contents Viewpoint News M/E Roundtable Comissioning Lighting Controls Prevent Plugholing: Smoke Control Done Right Commercial Geothermal Heating and Cooling System Design Codes &Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover2) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 2) Consulting-Specifying Engineer - November 2008 - Contents (Page 3) Consulting-Specifying Engineer - November 2008 - Contents (Page 4) Consulting-Specifying Engineer - November 2008 - Contents (Page 5) Consulting-Specifying Engineer - November 2008 - Contents (Page 6) Consulting-Specifying Engineer - November 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - November 2008 - News (Page 8) Consulting-Specifying Engineer - November 2008 - News (Page 9) Consulting-Specifying Engineer - November 2008 - News (Page 10) Consulting-Specifying Engineer - November 2008 - News (Page 11) Consulting-Specifying Engineer - November 2008 - News (Page 12) Consulting-Specifying Engineer - November 2008 - News (Page 13) Consulting-Specifying Engineer - November 2008 - News (Page 14) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 22) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 23) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 24) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 25) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 26) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 27) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 28) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 29) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 30) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 31) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 32) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 33) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 34) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 35) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 36) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 37) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 38) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 39) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 40) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 41) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 42) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 43) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 44) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 45) Consulting-Specifying Engineer - November 2008 - Case Study (Page 46) Consulting-Specifying Engineer - November 2008 - Case Study (Page 47) Consulting-Specifying Engineer - November 2008 - Case Study (Page 48) Consulting-Specifying Engineer - November 2008 - Case Study (Page 49) Consulting-Specifying Engineer - November 2008 - New Products (Page 50) Consulting-Specifying Engineer - November 2008 - New Products (Page 51) Consulting-Specifying Engineer - November 2008 - New Products (Page 52) Consulting-Specifying Engineer - November 2008 - New Products (Page 53) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 54) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 55) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56A) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56B) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 66) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - November 2008 - Green Space (Page 68) Consulting-Specifying Engineer - November 2008 - Green Space (Page 69) Consulting-Specifying Engineer - November 2008 - Green Space (Page 70) Consulting-Specifying Engineer - November 2008 - Green Space (Page S1) Consulting-Specifying Engineer - November 2008 - Green Space (Page S2) Consulting-Specifying Engineer - November 2008 - Green Space (Page S3) Consulting-Specifying Engineer - November 2008 - Green Space (Page S4) Consulting-Specifying Engineer - November 2008 - Green Space (Page S5) Consulting-Specifying Engineer - November 2008 - Green Space (Page S6) Consulting-Specifying Engineer - November 2008 - Green Space (Page S7) Consulting-Specifying Engineer - November 2008 - Green Space (Page S8) Consulting-Specifying Engineer - November 2008 - Green Space (Page S9) Consulting-Specifying Engineer - November 2008 - Green Space (Page S10) Consulting-Specifying Engineer - November 2008 - Green Space (Page S11) Consulting-Specifying Engineer - November 2008 - Green Space (Page S12) Consulting-Specifying Engineer - November 2008 - Green Space (Page S13) Consulting-Specifying Engineer - November 2008 - Green Space (Page S14) Consulting-Specifying Engineer - November 2008 - Green Space (Page S15) Consulting-Specifying Engineer - November 2008 - Green Space (Page S16) Consulting-Specifying Engineer - November 2008 - Green Space (Page S17) Consulting-Specifying Engineer - November 2008 - Green Space (Page S18) Consulting-Specifying Engineer - November 2008 - Green Space (Page S19) Consulting-Specifying Engineer - November 2008 - Green Space (Page S20) Consulting-Specifying Engineer - November 2008 - Green Space (Page S21) Consulting-Specifying Engineer - November 2008 - Green Space (Page S22) Consulting-Specifying Engineer - November 2008 - Green Space (Page S23) Consulting-Specifying Engineer - November 2008 - Green Space (Page S24) Consulting-Specifying Engineer - November 2008 - Green Space (Page S25) Consulting-Specifying Engineer - November 2008 - Green Space (Page S26) Consulting-Specifying Engineer - November 2008 - Green Space (Page S27) Consulting-Specifying Engineer - November 2008 - Green Space (Page S28) Consulting-Specifying Engineer - November 2008 - Green Space (Page S29) Consulting-Specifying Engineer - November 2008 - Green Space (Page S30) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.