Consulting-Specifying Engineer - November 2008 - (Page 46) Case Study Airport spreads its wings S AT A GLANCE Pittsburgh International Airport (PIT) tapped Honeywell to supply the HVAC and fire alarm systems for its new terminal. When that terminal opened in 1992, it had 17,000 HVAC points, 9,000 fire alarm points, 155 Honeywell Excel Plus HVAC controllers, 550 MCL variable air volume zone controllers, and 30 FS90 fire alarm panels. All of these systems were integrated into a Graphics Central. Six years later, the fire alarm system was expanded to include all of PIT’s remote buildings in the fire protection platform, bringing an additional 20 FS90 panels. The year after, 80 XL50 controllers were added to control the HVAC for the air bridges. In response to the Sept. 11, 2001, terrorist attacks, PIT adopted Honeywell’s Enterprise Buildings Integrator (EBI), an ituated on a 10,000-acre site located 20 miles west of the city, Pittsburgh International Airport (PIT) accommodates almost 10 million travelers each year. PIT services about 210 non-stop flights per day to 59 destinations. With new routes being added each year and growing development surrounding the airfield, the airport is a major economic engine for southwestern Pennsylvania. Expansion In the late 1980s the Allegheny County Airport Authority recognized the need to expand and update its facilities to accommodate the growing number of domestic and international flights at PIT. The airport’s original terminal, built in 1952, was considered one of the most modern and spacious in the country when it first came online, second only in size to JFK International Airport in New York. However, despite the addition of an international wing in 1972, along with several new docks and rotundas throughout the 1980s to increase the number of gates, the capacity of the original terminal still proved inadequate. “We needed a larger terminal with modern jetways not only for the growing number of flights, but also for the larger aircraft passing through the airport,” said Tom Long, director of maintenance and a 38-year PIT employee. “We also knew the original facility contained asbestos, as well as old building control equipment that were not able to be upgraded.” Construction on the new PIT terminal began in 1990. It was designed to offer 7.7 million sq ft of air-side space, more than 100 gates, and a mall of more than 100 restaurants and specialty shops. Based on the Honeywell’s more-than-40year relationship with the airport, PIT and its architectural consultants tapped Honeywell to supply HVAC and fire alarm systems throughout the new space. When the terminal opened to the flying public in 1992, Honeywell technology helped control more than 17,000 HVAC points and 9,000 fire alarm points throughout the facility. At the heart of the building automation architecture were 155 Honeywell Excel Plus HVAC controllers, 550 MCL variable air volume zone controllers, and 30 FS90 fire alarm panels—all that integrates almost all of PIT’s building systems into a flexible open architecture. EBI is helping PIT attain its goal of having complete control of building operations from one centralized location. PIT and Honeywell continue to work as a team to develop ideas to improve the airport’s operations, systems, and energy management strategies. 46 Consulting-Specifying Engineer • NOVEMBER 2008 Photo courtesy of Pittsburgh International Airport enterprise management system
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 Contents Viewpoint News M/E Roundtable Comissioning Lighting Controls Prevent Plugholing: Smoke Control Done Right Commercial Geothermal Heating and Cooling System Design Codes &Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover2) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 2) Consulting-Specifying Engineer - November 2008 - Contents (Page 3) Consulting-Specifying Engineer - November 2008 - Contents (Page 4) Consulting-Specifying Engineer - November 2008 - Contents (Page 5) Consulting-Specifying Engineer - November 2008 - Contents (Page 6) Consulting-Specifying Engineer - November 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - November 2008 - News (Page 8) Consulting-Specifying Engineer - November 2008 - News (Page 9) Consulting-Specifying Engineer - November 2008 - News (Page 10) Consulting-Specifying Engineer - November 2008 - News (Page 11) Consulting-Specifying Engineer - November 2008 - News (Page 12) Consulting-Specifying Engineer - November 2008 - News (Page 13) Consulting-Specifying Engineer - November 2008 - News (Page 14) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 22) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 23) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 24) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 25) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 26) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 27) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 28) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 29) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 30) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 31) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 32) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 33) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 34) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 35) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 36) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 37) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 38) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 39) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 40) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 41) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 42) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 43) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 44) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 45) Consulting-Specifying Engineer - November 2008 - Case Study (Page 46) Consulting-Specifying Engineer - November 2008 - Case Study (Page 47) Consulting-Specifying Engineer - November 2008 - Case Study (Page 48) Consulting-Specifying Engineer - November 2008 - Case Study (Page 49) Consulting-Specifying Engineer - November 2008 - New Products (Page 50) Consulting-Specifying Engineer - November 2008 - New Products (Page 51) Consulting-Specifying Engineer - November 2008 - New Products (Page 52) Consulting-Specifying Engineer - November 2008 - New Products (Page 53) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 54) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 55) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56A) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56B) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 66) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - November 2008 - Green Space (Page 68) Consulting-Specifying Engineer - November 2008 - Green Space (Page 69) Consulting-Specifying Engineer - November 2008 - Green Space (Page 70) Consulting-Specifying Engineer - November 2008 - Green Space (Page S1) Consulting-Specifying Engineer - November 2008 - Green Space (Page S2) Consulting-Specifying Engineer - November 2008 - Green Space (Page S3) Consulting-Specifying Engineer - November 2008 - Green Space (Page S4) Consulting-Specifying Engineer - November 2008 - Green Space (Page S5) Consulting-Specifying Engineer - November 2008 - Green Space (Page S6) Consulting-Specifying Engineer - November 2008 - Green Space (Page S7) Consulting-Specifying Engineer - November 2008 - Green Space (Page S8) Consulting-Specifying Engineer - November 2008 - Green Space (Page S9) Consulting-Specifying Engineer - November 2008 - Green Space (Page S10) Consulting-Specifying Engineer - November 2008 - Green Space (Page S11) Consulting-Specifying Engineer - November 2008 - Green Space (Page S12) Consulting-Specifying Engineer - November 2008 - Green Space (Page S13) Consulting-Specifying Engineer - November 2008 - Green Space (Page S14) Consulting-Specifying Engineer - November 2008 - Green Space (Page S15) Consulting-Specifying Engineer - November 2008 - Green Space (Page S16) Consulting-Specifying Engineer - November 2008 - Green Space (Page S17) Consulting-Specifying Engineer - November 2008 - Green Space (Page S18) Consulting-Specifying Engineer - November 2008 - Green Space (Page S19) Consulting-Specifying Engineer - November 2008 - Green Space (Page S20) Consulting-Specifying Engineer - November 2008 - Green Space (Page S21) Consulting-Specifying Engineer - November 2008 - Green Space (Page S22) Consulting-Specifying Engineer - November 2008 - Green Space (Page S23) Consulting-Specifying Engineer - November 2008 - Green Space (Page S24) Consulting-Specifying Engineer - November 2008 - Green Space (Page S25) Consulting-Specifying Engineer - November 2008 - Green Space (Page S26) Consulting-Specifying Engineer - November 2008 - Green Space (Page S27) Consulting-Specifying Engineer - November 2008 - Green Space (Page S28) Consulting-Specifying Engineer - November 2008 - Green Space (Page S29) Consulting-Specifying Engineer - November 2008 - Green Space (Page S30) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.