Consulting-Specifying Engineer - November 2008 - (Page 47) Statement of Ownership, Management and Circulation Statement of Ownership, Management, and Circulation (Required by Title 39 United States Code 3685) of Consulting-Specifying Engineer (ISSN# 0892-5046), published monthly at Highlands Ranch, CO 80129-2345 for November 1, 2008. Annual Subscription Prices: $105.99 USA; 143.99 CAN; $143.99 MEX; $261.99 International. integrated into a Graphics Central system with redundant backups and four remote terminals. Honeywell upgraded the front end to its Excel Building Supervisor-Integrated (XBSi) in 1997, which allowed the airport to migrate from Microsoft Windows 3.1 to a Windows 98 platform. In 1998, the company completed a fire alarm expansion, bringing all the remote buildings at PIT onto the fire protection platform. This added another XBSi terminal as well as 20 more FS90 panels. Finally, 80 XL50 controllers were added to control the HVAC for the air bridges in 1999. To assist in managing this wide array of equipment, two full-time Honeywell technicians work with the airport’s maintenance department as part of an ongoing service agreement, maintaining equipment and supervising much of the fieldwork. “It’s an integrated team,” Long said. “Honeywell takes care of the core computer equipment up to the panel, and we work with the Honeywell technicians to maintain the end devices. They also provide training to our system operators as needed. Our maintenance and operations departments have really benefited from the service relationship.” Systems integration With heightened security concerns following Sept. 11, 2001, PIT officials wanted the ability to monitor and control all building systems from its Emergency Operations Center (EOC). The vision was that EOC operators would control not only HVAC and lighting systems through a centralized management platform, but also life safety, security, and other building systems to provide the most safe and comfortable environment for travelers and airport personnel. Honeywell recommended that the airport switch to the company’s Enterprise Buildings Integrator (EBI), an enterprise management system that boosts energy 1. Complete Mailing Address of Known Office of Publication: Reed Business Information, 8878 South Barrons Blvd., Highlands Ranch, CO 80129-2345. 2. Complete Mailing Address of Headquarters or General Business Office of Publisher: Reed Business Information, Division of Reed Elsevier Inc., 360 Park Avenue South, New York, NY 10010 3. Full Names and Complete Mailing Addresses of Publisher, Editor, and Managing Editor: Publisher, Jim Langhenry; Editor, Michael Ivanovich; and Senior Editor, Scott Siddens, Reed Business Information, 2000 Clearwater Drive, Oak Brook, IL 60523 4. The owner is Reed Business Information, a Division of Reed Elsevier, Inc., 360 Park Avenue South, New York, NY 10010. 5. Extent and Nature of Circulation Average No. Copies Each Issue No. Copies of Single Issue During Preceding 12 Months Published Nearest to Filing Date A. Total Number of Copies (Net Press Run) 39,738 38,095 B. Paid and/or Requested Distribution (1) Paid/Requested Outside-County Mail Subscriptions 37,813 36,667 (2) Paid In-County Subscriptions (3) Sales Through Dealers and Carriers, 0 0 and Other Non-USPS Paid Distribution 29 22 (4) Other Classes Mailed Through USPS 0 0 C. Total Paid and/or Requested Circulation (Sum of 5B (1), (2), (3) and (4)) 37,842 36,689 D. Free Distribution by Mail (Samples, complimentary and other free) (1) Outside-County 792 850 (2) In-County 0 0 (3) Other Classes Mailed Through the USPS 0 0 E. Free Distribution Outside the Mail (Carriers or other means) 896 950 F. Total Distribution (Sum of 5C and 5E) 38,738 37,639 G. Copies not distributed 1000 456 H. Total (Sum of 5F and 5G) 39,738 38,095 I. Percent Paid and/or Requested Circulation (5C divided by 5F times 100) 97.69% 97.48% 6. This statement of ownership will be printed in the November issue of this publication. 7. I certify that all information furnished on this form is true and complete. I understand that anyone who furnishes false or misleading information on this form or who omits material or information requested on the form may be subject to criminal sanctions (including fines and imprisonment) and/or civil sanctions (including civil penalties). Simon Young (signed), Group Audience Marketing Director. Find a World of HVAC&R Technology for a More Sustainable Future INTERNATIONAL AIR-CONDITIONING • HEATING • REFRIGERATING EXPOSITION McCormick Place North & South Halls January 26-28 2009 January 26-28, 2009 Chicago, Illinois Co-sponsored by: Honorary sponsor: Free Registration and Information: www.ahrexpo.com Input #223 at csemag.com/quickResponse http://www.ahrexpo.com http://www.ahrexpo.com http://www.csemag.com/quickResponse
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 Contents Viewpoint News M/E Roundtable Comissioning Lighting Controls Prevent Plugholing: Smoke Control Done Right Commercial Geothermal Heating and Cooling System Design Codes &Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover2) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 2) Consulting-Specifying Engineer - November 2008 - Contents (Page 3) Consulting-Specifying Engineer - November 2008 - Contents (Page 4) Consulting-Specifying Engineer - November 2008 - Contents (Page 5) Consulting-Specifying Engineer - November 2008 - Contents (Page 6) Consulting-Specifying Engineer - November 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - November 2008 - News (Page 8) Consulting-Specifying Engineer - November 2008 - News (Page 9) Consulting-Specifying Engineer - November 2008 - News (Page 10) Consulting-Specifying Engineer - November 2008 - News (Page 11) Consulting-Specifying Engineer - November 2008 - News (Page 12) Consulting-Specifying Engineer - November 2008 - News (Page 13) Consulting-Specifying Engineer - November 2008 - News (Page 14) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 22) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 23) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 24) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 25) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 26) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 27) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 28) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 29) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 30) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 31) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 32) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 33) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 34) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 35) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 36) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 37) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 38) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 39) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 40) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 41) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 42) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 43) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 44) Consulting-Specifying Engineer - November 2008 - Codes &Standards (Page 45) Consulting-Specifying Engineer - November 2008 - Case Study (Page 46) Consulting-Specifying Engineer - November 2008 - Case Study (Page 47) Consulting-Specifying Engineer - November 2008 - Case Study (Page 48) Consulting-Specifying Engineer - November 2008 - Case Study (Page 49) Consulting-Specifying Engineer - November 2008 - New Products (Page 50) Consulting-Specifying Engineer - November 2008 - New Products (Page 51) Consulting-Specifying Engineer - November 2008 - New Products (Page 52) Consulting-Specifying Engineer - November 2008 - New Products (Page 53) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 54) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 55) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56A) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56B) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 66) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - November 2008 - Green Space (Page 68) Consulting-Specifying Engineer - November 2008 - Green Space (Page 69) Consulting-Specifying Engineer - November 2008 - Green Space (Page 70) Consulting-Specifying Engineer - November 2008 - Green Space (Page S1) Consulting-Specifying Engineer - November 2008 - Green Space (Page S2) Consulting-Specifying Engineer - November 2008 - Green Space (Page S3) Consulting-Specifying Engineer - November 2008 - Green Space (Page S4) Consulting-Specifying Engineer - November 2008 - Green Space (Page S5) Consulting-Specifying Engineer - November 2008 - Green Space (Page S6) Consulting-Specifying Engineer - November 2008 - Green Space (Page S7) Consulting-Specifying Engineer - November 2008 - Green Space (Page S8) Consulting-Specifying Engineer - November 2008 - Green Space (Page S9) Consulting-Specifying Engineer - November 2008 - Green Space (Page S10) Consulting-Specifying Engineer - November 2008 - Green Space (Page S11) Consulting-Specifying Engineer - November 2008 - Green Space (Page S12) Consulting-Specifying Engineer - November 2008 - Green Space (Page S13) Consulting-Specifying Engineer - November 2008 - Green Space (Page S14) Consulting-Specifying Engineer - November 2008 - Green Space (Page S15) Consulting-Specifying Engineer - November 2008 - Green Space (Page S16) Consulting-Specifying Engineer - November 2008 - Green Space (Page S17) Consulting-Specifying Engineer - November 2008 - Green Space (Page S18) Consulting-Specifying Engineer - November 2008 - Green Space (Page S19) Consulting-Specifying Engineer - November 2008 - Green Space (Page S20) Consulting-Specifying Engineer - November 2008 - Green Space (Page S21) Consulting-Specifying Engineer - November 2008 - Green Space (Page S22) Consulting-Specifying Engineer - November 2008 - Green Space (Page S23) Consulting-Specifying Engineer - November 2008 - Green Space (Page S24) Consulting-Specifying Engineer - November 2008 - Green Space (Page S25) Consulting-Specifying Engineer - November 2008 - Green Space (Page S26) Consulting-Specifying Engineer - November 2008 - Green Space (Page S27) Consulting-Specifying Engineer - November 2008 - Green Space (Page S28) Consulting-Specifying Engineer - November 2008 - Green Space (Page S29) Consulting-Specifying Engineer - November 2008 - Green Space (Page S30) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.