Consulting-Specifying Engineer - November 2008 - (Page 54) Equipment Lifecycles Picking the right fire extinguisher Review of the entire process of stored pressure fire extinguishers by identifying the types that best fit your building, the best locations to place them, and maintenance and disposal. BY JOE BERANEK, Tyco Fire Suppression & Building Products, Marinette, Wis. hen supplying a building with fire extinguishers and suppressants, ensuring the security of the entire structure is extremely important. As mentioned in NFPA 10 Chapter 1, portable fire extinguishers are intended to be the first line of defense for fires of a limited size and can be used in several areas including vehicle repair, aircraft and marine servicing, cooking areas, and storage and manufacturing processes (painting, dipping, coating, and the handling of flammable liquids). The following steps will help you determine the right fire extinguishers and agents for your own building. 1. Perform a site survey In order to properly classify the right extinguisher necessary and where it should be located in a room, a thorough site survey must be completed. This should be conducted with a facility representative that is well-versed in the layout, O&M, and processes of the building. In addition, it is helpful to have detailed sketches of the building layout including specifications on doorways, aisles, stairways, interior structures, machinery, and equipment locations—all places that may not be initially considered. Having floor plans handy also is helpful and recommended because it helps visualize the entire floor layout, and can be helpful later on when determining the distribution of fire extinguishers. W When analyzing, identify potentially hazardous conditions such as liquids, chemicals, and atmospheric gases. Evaluate the potential severity of a resulting fire and make sure that you have both the personnel and equipment to handle it. Keep staff members trained on how to handle equipment as well as potential operational hazards. 2. Selecting the proper type of extinguisher When selecting a fire extinguisher, special thought should be given to the potential occupancy hazards within the facility that might require additional protection. Keep in mind the manufacturing processes that are taking place in the building, as well as flammable liquid handling and storage areas. This can help determine the potential severity of a fire, which is key when deciding the type of extinguisher required. Mixing volatile chemicals in an area can either start or add to the intensity of a fire. Other potential hazards in the building that would require special attention are equipment repair areas, which are potential areas for 3-D class B fires; gases in the atmosphere; and areas that have pressurized flammable liquids and gases. There are five classifications of extinguishers (see Table 1) that are used to put out different types of fires. When considering the best fit for your building, determine which 54 Consulting-Specifying Engineer • NOVEMBER 2008
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 Contents Viewpoint News M/E Roundtable Comissioning Lighting Controls Prevent Plugholing: Smoke Control Done Right Commercial Geothermal Heating and Cooling System Design Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover2) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 2) Consulting-Specifying Engineer - November 2008 - Contents (Page 3) Consulting-Specifying Engineer - November 2008 - Contents (Page 4) Consulting-Specifying Engineer - November 2008 - Contents (Page 5) Consulting-Specifying Engineer - November 2008 - Contents (Page 6) Consulting-Specifying Engineer - November 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - November 2008 - News (Page 8) Consulting-Specifying Engineer - November 2008 - News (Page 9) Consulting-Specifying Engineer - November 2008 - News (Page 10) Consulting-Specifying Engineer - November 2008 - News (Page 11) Consulting-Specifying Engineer - November 2008 - News (Page 12) Consulting-Specifying Engineer - November 2008 - News (Page 13) Consulting-Specifying Engineer - November 2008 - News (Page 14) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 22) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 23) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 24) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 25) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 26) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 27) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 28) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 29) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 30) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 31) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 32) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 33) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 34) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 35) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 36) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 37) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 38) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 39) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 40) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 41) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 42) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 43) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 44) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 45) Consulting-Specifying Engineer - November 2008 - Case Study (Page 46) Consulting-Specifying Engineer - November 2008 - Case Study (Page 47) Consulting-Specifying Engineer - November 2008 - Case Study (Page 48) Consulting-Specifying Engineer - November 2008 - Case Study (Page 49) Consulting-Specifying Engineer - November 2008 - New Products (Page 50) Consulting-Specifying Engineer - November 2008 - New Products (Page 51) Consulting-Specifying Engineer - November 2008 - New Products (Page 52) Consulting-Specifying Engineer - November 2008 - New Products (Page 53) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 54) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 55) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56A) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56B) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 66) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - November 2008 - Green Space (Page 68) Consulting-Specifying Engineer - November 2008 - Green Space (Page 69) Consulting-Specifying Engineer - November 2008 - Green Space (Page 70) Consulting-Specifying Engineer - November 2008 - Green Space (Page S1) Consulting-Specifying Engineer - November 2008 - Green Space (Page S2) Consulting-Specifying Engineer - November 2008 - Green Space (Page S3) Consulting-Specifying Engineer - November 2008 - Green Space (Page S4) Consulting-Specifying Engineer - November 2008 - Green Space (Page S5) Consulting-Specifying Engineer - November 2008 - Green Space (Page S6) Consulting-Specifying Engineer - November 2008 - Green Space (Page S7) Consulting-Specifying Engineer - November 2008 - Green Space (Page S8) Consulting-Specifying Engineer - November 2008 - Green Space (Page S9) Consulting-Specifying Engineer - November 2008 - Green Space (Page S10) Consulting-Specifying Engineer - November 2008 - Green Space (Page S11) Consulting-Specifying Engineer - November 2008 - Green Space (Page S12) Consulting-Specifying Engineer - November 2008 - Green Space (Page S13) Consulting-Specifying Engineer - November 2008 - Green Space (Page S14) Consulting-Specifying Engineer - November 2008 - Green Space (Page S15) Consulting-Specifying Engineer - November 2008 - Green Space (Page S16) Consulting-Specifying Engineer - November 2008 - Green Space (Page S17) Consulting-Specifying Engineer - November 2008 - Green Space (Page S18) Consulting-Specifying Engineer - November 2008 - Green Space (Page S19) Consulting-Specifying Engineer - November 2008 - Green Space (Page S20) Consulting-Specifying Engineer - November 2008 - Green Space (Page S21) Consulting-Specifying Engineer - November 2008 - Green Space (Page S22) Consulting-Specifying Engineer - November 2008 - Green Space (Page S23) Consulting-Specifying Engineer - November 2008 - Green Space (Page S24) Consulting-Specifying Engineer - November 2008 - Green Space (Page S25) Consulting-Specifying Engineer - November 2008 - Green Space (Page S26) Consulting-Specifying Engineer - November 2008 - Green Space (Page S27) Consulting-Specifying Engineer - November 2008 - Green Space (Page S28) Consulting-Specifying Engineer - November 2008 - Green Space (Page S29) Consulting-Specifying Engineer - November 2008 - Green Space (Page S30) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.