Consulting-Specifying Engineer - November 2008 - (Page 68) Green Space Divide to conquer net-zero BY EDWARD BRZEZOWSKI, PE, Noveda Technologies, Branchburg, N.J. Getting to net-zero carbon emissions is a difficult challenge for any building. First, you have to decide if you’re going to tackle both electrical and thermal energy loads, which really is a lot to take on at once. Having faced this decision, I recommend the divide-and-conquer approach: Choose net-zero electrical or thermal, and after achieving one, tackle the other. That’s the path Ferreira Group took Having completed the net-zero electricity leg of a two-part journey, for what has become known as the 31 Tanour goal for net-zero carbon nery Project in Branchemissions is within reach. burg, N.J. In May 2006, Ferreira Group moved into its new office building and shop. In July 2007, it became the first documented net-zero electric commercial building in the United States. The 42,000-sq-ft building is the corporate headquarters for more than 200 people and provides shop space for a busy design/build firm. It also serves local and international communities as a living lab and showcase for energy efficiency and renewable energy systems and equipment. In addition to perfect Energy Star 100 ratings for two years, July 2008 also marked the building’s second anniversary of documented net-zero electric operation. What that means is that 31 Tannery produces at least as much electrical energy that it uses in a year, when accounted for at the site. It is generating a surplus of electrical energy, enough to operate for more than Brzezowski is the founder one month. Right now, Ferreira Group sells this and executive vice president excess electricity and its solar renewable energy of engineering of Noveda Technologies. While working credits back to the power utility, earning $1.11/ for The Ferreira Group, he sq ft/year (after paying all of its annual electric engineered the 31 Tannery and natural gas costs). Ferreira is now working building and developed its on a fleet of plug-in hybrid vehicles that will approach for visualizationcharge from the building, helping the company based montitoring. take energy efficiency to next level. The renewable electrical source of energy is a 223-kW photovoltaic system that feeds into inverters for conventional 3-phase 277/480 VAC electrical distribution. There’s also a solar-heated domestic hot water system. There are three key technologies for achieving net-zero buildings: energy conserving products, renewable energy sources, and monitoring and visualization. Getting thermal, electrical, and moisture loads down is of huge importance, and so is running equipment efficiently (or not at all when not needed). But what about monitoring and visualization? In a net-zero building, loads and power systems have to be closely monitored backward and forward in time. Problems cannot be allowed to persist, nor can we wait for utility bills to arrive 30 to 45 days after use. Therefore, 31 Tannery has dedicated monitoring and visualization systems that produce instantaneous status reports on the building, systems, and equipment, as well as easy-to-read trends. A Web-based BAS, pervasive voice/data/video system, and kiosk displays provide real-time, ongoing commissioning for optimal operations. To complete the transformation to total netzero, 31 Tannery needs to eliminate its need of natural gas for space heating. Ferreira Group and Noveda Technologies are currently investigating options and potential partners to accomplish this. Solar thermal might work; but perhaps a deep bore, direct-use geothermal system is a better option. In either case, the efficiency of the building and the availability of the hydronic radiant loops make us well prepared for going totally net-zero in the future. Having completed the net-zero electricity leg of a two-part journey, our goal for net-zero carbon emissions is within reach. 68 Consulting-Specifying Engineer • NOVEMBER 2008
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 Contents Viewpoint News M/E Roundtable Comissioning Lighting Controls Prevent Plugholing: Smoke Control Done Right Commercial Geothermal Heating and Cooling System Design Codes & Standards Case Study New Products Equipment Lifecycles Advertiser Index Green Space Consulting-Specifying Engineer - November 2008 Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page Cover2) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 1) Consulting-Specifying Engineer - November 2008 - Consulting-Specifying Engineer - November 2008 (Page 2) Consulting-Specifying Engineer - November 2008 - Contents (Page 3) Consulting-Specifying Engineer - November 2008 - Contents (Page 4) Consulting-Specifying Engineer - November 2008 - Contents (Page 5) Consulting-Specifying Engineer - November 2008 - Contents (Page 6) Consulting-Specifying Engineer - November 2008 - Viewpoint (Page 7) Consulting-Specifying Engineer - November 2008 - News (Page 8) Consulting-Specifying Engineer - November 2008 - News (Page 9) Consulting-Specifying Engineer - November 2008 - News (Page 10) Consulting-Specifying Engineer - November 2008 - News (Page 11) Consulting-Specifying Engineer - November 2008 - News (Page 12) Consulting-Specifying Engineer - November 2008 - News (Page 13) Consulting-Specifying Engineer - November 2008 - News (Page 14) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 15) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - November 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 22) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 23) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 24) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 25) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 26) Consulting-Specifying Engineer - November 2008 - Comissioning Lighting Controls (Page 27) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 28) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 29) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 30) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 31) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 32) Consulting-Specifying Engineer - November 2008 - Prevent Plugholing: Smoke Control Done Right (Page 33) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 34) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 35) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 36) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 37) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 38) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 39) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 40) Consulting-Specifying Engineer - November 2008 - Commercial Geothermal Heating and Cooling System Design (Page 41) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 42) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 43) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 44) Consulting-Specifying Engineer - November 2008 - Codes & Standards (Page 45) Consulting-Specifying Engineer - November 2008 - Case Study (Page 46) Consulting-Specifying Engineer - November 2008 - Case Study (Page 47) Consulting-Specifying Engineer - November 2008 - Case Study (Page 48) Consulting-Specifying Engineer - November 2008 - Case Study (Page 49) Consulting-Specifying Engineer - November 2008 - New Products (Page 50) Consulting-Specifying Engineer - November 2008 - New Products (Page 51) Consulting-Specifying Engineer - November 2008 - New Products (Page 52) Consulting-Specifying Engineer - November 2008 - New Products (Page 53) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 54) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 55) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56A) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 56B) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 63) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 64) Consulting-Specifying Engineer - November 2008 - Equipment Lifecycles (Page 65) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 66) Consulting-Specifying Engineer - November 2008 - Advertiser Index (Page 67) Consulting-Specifying Engineer - November 2008 - Green Space (Page 68) Consulting-Specifying Engineer - November 2008 - Green Space (Page 69) Consulting-Specifying Engineer - November 2008 - Green Space (Page 70) Consulting-Specifying Engineer - November 2008 - Green Space (Page S1) Consulting-Specifying Engineer - November 2008 - Green Space (Page S2) Consulting-Specifying Engineer - November 2008 - Green Space (Page S3) Consulting-Specifying Engineer - November 2008 - Green Space (Page S4) Consulting-Specifying Engineer - November 2008 - Green Space (Page S5) Consulting-Specifying Engineer - November 2008 - Green Space (Page S6) Consulting-Specifying Engineer - November 2008 - Green Space (Page S7) Consulting-Specifying Engineer - November 2008 - Green Space (Page S8) Consulting-Specifying Engineer - November 2008 - Green Space (Page S9) Consulting-Specifying Engineer - November 2008 - Green Space (Page S10) Consulting-Specifying Engineer - November 2008 - Green Space (Page S11) Consulting-Specifying Engineer - November 2008 - Green Space (Page S12) Consulting-Specifying Engineer - November 2008 - Green Space (Page S13) Consulting-Specifying Engineer - November 2008 - Green Space (Page S14) Consulting-Specifying Engineer - November 2008 - Green Space (Page S15) Consulting-Specifying Engineer - November 2008 - Green Space (Page S16) Consulting-Specifying Engineer - November 2008 - Green Space (Page S17) Consulting-Specifying Engineer - November 2008 - Green Space (Page S18) Consulting-Specifying Engineer - November 2008 - Green Space (Page S19) Consulting-Specifying Engineer - November 2008 - Green Space (Page S20) Consulting-Specifying Engineer - November 2008 - Green Space (Page S21) Consulting-Specifying Engineer - November 2008 - Green Space (Page S22) Consulting-Specifying Engineer - November 2008 - Green Space (Page S23) Consulting-Specifying Engineer - November 2008 - Green Space (Page S24) Consulting-Specifying Engineer - November 2008 - Green Space (Page S25) Consulting-Specifying Engineer - November 2008 - Green Space (Page S26) Consulting-Specifying Engineer - November 2008 - Green Space (Page S27) Consulting-Specifying Engineer - November 2008 - Green Space (Page S28) Consulting-Specifying Engineer - November 2008 - Green Space (Page S29) Consulting-Specifying Engineer - November 2008 - Green Space (Page S30) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover3) Consulting-Specifying Engineer - November 2008 - Green Space (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.