Consulting-Specifying Engineer - December 2008 - (Page 27) ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// years ago, Olson studied sustainable practices in the United Kingdom. It was during that stay that Dunham learned about thermal displacement ventilation, an energy-saving concept that is commonly used across Europe. In a traditional air system, overhead diffusers use cooler air than a displacement ventilation system, and then mix the air in the room to a certain temperature, typically 72 F. “Ninety percent of buildings in America use this,” said Olson, who has worked at Dunham since 1996. With thermal displacement ventilation, cool air circulates in the floor, supplying 64 F air instead of the traditional 55 F air, which eliminates the need for very cold water in the coolant coils. Because heat rises, it creates a naturally self-balancing system that provides as much heat as needed. Olson likens the system to a sweaty runner: “If you ran 3 miles and I was standing next to you, a lot more heat would come off your head. As that happens, cooler air would naturally be attracted to the heat to balance everything.” An 18-in. raised floor assists with airflow and allows enough space for current electrical distribution and for future technology advancements. Two outside air units contain energy recovery wheels that recover latent and sensible energy from building relief and toilet exhaust. An air-to-air plate exchanger provides free cooling and free reheat of supply air during dehumidification mode, but allows bypass when not dehumidifying to reduce fan static pressure. The beauty of the system is its ability to allow 30% more outside air to enter the building than required by code. Thermal displacement ventilation is an energy-saving concept. In traditional geothermal systems, vertical wells typically 200 ft deep are used to exchange energy with the earth. But Dunham noticed the 6-acre lake on Great River Energy’s property and thought about using that instead. Even though the lake was large, Olson didn’t know its depth or temperature. To see if the lake could be used as a possible energy source, Lonnie Vande Kamp, Dunham’s engineer of record, paddled a canoe to the middle of it in mid-August. He dropped a depth finder and thermometer for preliminary readings. “It wasn’t a very scientific starting point,” Olson said with a laugh. “But we had to see what we were dealing with.” After discovering the lake’s depth of 32 ft, Dunham commissioned a lake study to create a month-by-month temperature profile. The study showed the lake remained near 39 F during the winter and peaked at 60 F during the summer. Dunham considered a ground loop system but ultimately opted to use the lake since the study showed it offered hundreds of hours of free cooling from October through June, and the overall lake temperature would change only by a half degree. Two heat transfer methods were then considered: metallic heat exchangers and polyethylene tubing. Ultimately, Dunham used more than 30 miles of rugged-yet-flexible polyethylene tubing instead of metallic heat exchangers, which have a limited history and raise concerns about maintenance and long-term performance. Since the flexible coils don’t have joints and fittings, the ¾-in. coils were placed on top of a pallet. Twelve-inch concrete cinder blocks were attached under the pallet to elevate the piping slightly above the bottom of the lake, minimizing the lake bottom contact area to less than 1,200 sq ft. The 39 heat exchanger bundles were inflated with air and floated in raft-like fashion to Daylighting in occupied spaces, expansive views to the outside, and displacement ventilation provide superior indoor environmental quality. Photo: Don F. Wong These are roof-mounted photovoltaic fixed arrays, with the 200 kW wind turbine in the background. The arrays are connected to a series of dc-ac converters. Photo: Lucie Marusin Consulting-Specifying Engineer • DECEMBER 2008 27
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 Contents Viewpoint News M/E Roundtable ARC Awards New Construction Gold New Construction Silver New Construction Bronze Renovation Gold Renovation Silver A Green Approach to Air Conditioning Systems Turning Down the Lights Case Study New Products Equipment Lifecycles Advertiser Index Green Space Gas Technology Pure Power Supplement Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover2) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 2) Consulting-Specifying Engineer - December 2008 - Contents (Page 3) Consulting-Specifying Engineer - December 2008 - Contents (Page 4) Consulting-Specifying Engineer - December 2008 - Contents (Page 5) Consulting-Specifying Engineer - December 2008 - Contents (Page 6) Consulting-Specifying Engineer - December 2008 - Contents (Page 7) Consulting-Specifying Engineer - December 2008 - Contents (Page 8) Consulting-Specifying Engineer - December 2008 - Viewpoint (Page 9) Consulting-Specifying Engineer - December 2008 - News (Page 10) Consulting-Specifying Engineer - December 2008 - News (Page 11) Consulting-Specifying Engineer - December 2008 - News (Page 12) Consulting-Specifying Engineer - December 2008 - News (Page 13) Consulting-Specifying Engineer - December 2008 - News (Page 14) Consulting-Specifying Engineer - December 2008 - News (Page 15) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 24) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 25) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 26) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 27) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 28) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 29) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 30) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 31) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 32) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 33) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 34) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 35) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 36) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 37) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 38) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 39) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 40) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 41) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 42) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 43) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 44) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 45) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 46) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 47) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 48) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC1) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC2) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 49) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 50) Consulting-Specifying Engineer - December 2008 - Case Study (Page 51) Consulting-Specifying Engineer - December 2008 - Case Study (Page 52) Consulting-Specifying Engineer - December 2008 - Case Study (Page 53) Consulting-Specifying Engineer - December 2008 - New Products (Page 54) Consulting-Specifying Engineer - December 2008 - New Products (Page 55) Consulting-Specifying Engineer - December 2008 - New Products (Page 56) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - December 2008 - Advertiser Index (Page 63) Consulting-Specifying Engineer - December 2008 - Green Space (Page 64) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A1) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A2) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A4) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A5) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A6) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A7) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A8) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A9) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A10) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A11) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A12) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S5) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S6) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S7) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S8) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S9) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S10) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S11) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S12) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S13) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S14) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S15) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S16) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S17) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S18) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S19) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S20) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S21) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S22) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S23) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S24) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S25) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S26) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S27) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S28) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S29) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S30) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S31) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S32) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S33) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S34) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S35) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S36) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S37) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S38) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S39) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S40) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S41) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S42) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S43) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S44) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.