Consulting-Specifying Engineer - December 2008 - (Page 39) ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// to leave critical historic areas unaffected. Instead of sacrificing historic ceiling space, Spectrum removed the false ceilings that had been installed in earlier renovations and restored the original handcrafted plaster ceilings. Then the walls were thickened for ductwork in vertical distribution. “It was a year and half of weekly meetings to make sure every single duct would coordinate,” said Todd Rindlisbaker, Spectrum’s project mechanical engineer. “There were a lot of surprises that we wouldn’t discover until demolition because some of the concrete beams ran in different directions or weren’t as wide as they were shown on drawings from 100 years ago.” Because the ductwork was vertically stacked, if one floor had to be changed, it affected the two floors above or below the two-tier system. After designs were planned around 48 in. of space in the attic for ductwork, the team discovered that only 30 in. remained between the roof structure and the floor of the attic. That meant redesigning the entire quadrant of the building with flat oval ductwork, instead of round, to save space. Spectrum also performed an energy impact study and changed the electrical distribution specifications from 3 + 3 (three conductors with three dedicated neutrals) to 3 + 1 with an oversized shared neutral and more than 2,000 branch circuits totaling about Because ductwork was vertically stacked, if one floor had to be changed, it affected the two floors above or below. 1.8 million ft of wire. This resulted in $20,000 in immediate savings and $7,000 in annual energy savings. The architects wanted the building to appear just as it had in the early 1900s, which meant that smoke detectors had to be hidden in lighting fixtures and cove moldings. Old photographs were used as models for traditional lighting and plumbing fixtures. Original lighting fixtures were restored, refurbished, or replicated. To re-create historic lighting levels, which were darker during the early 1900s, the architects used incandescent lamps, which accounted for 8% of the new lighting fixtures. They were used in special rooms, like the Governor’s Ceremonial Office and the Gold Room, where dignitaries meet the governor amid antique furniture, gold leaf accents, and restored chandeliers. The other 92% of lighting fixtures use energy-efficient fluorescent, HID, or LED lamps. The result The $212 million capitol renovation project began in design in 2002, with demolition in September 2004. The project was completed in December 2007 and dedicated a month later. “There’s always a great sense of satisfaction when you finish a project,” Wesemann said, “especially since this renovation was designed for the next 100 years and you know it’s going to be used by your children and grandchildren.” Conditioned air is delivered through new vents, ensuring modern comfort. New utility openings are concealed by decorative grilles designed to match originals. All photos: Spectrum Engineers The central heating and cooling plant serves the Capitol, Legislative, and Senate Expansion Buildings and the State Office Building. Energy-saving equipment includes high-efficiency boilers and chillers. Consulting-Specifying Engineer • DECEMBER 2008 39
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 Contents Viewpoint News M/E Roundtable ARC Awards New Construction Gold New Construction Silver New Construction Bronze Renovation Gold Renovation Silver A Green Approach to Air Conditioning Systems Turning Down the Lights Case Study New Products Equipment Lifecycles Advertiser Index Green Space Gas Technology Pure Power Supplement Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover2) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 2) Consulting-Specifying Engineer - December 2008 - Contents (Page 3) Consulting-Specifying Engineer - December 2008 - Contents (Page 4) Consulting-Specifying Engineer - December 2008 - Contents (Page 5) Consulting-Specifying Engineer - December 2008 - Contents (Page 6) Consulting-Specifying Engineer - December 2008 - Contents (Page 7) Consulting-Specifying Engineer - December 2008 - Contents (Page 8) Consulting-Specifying Engineer - December 2008 - Viewpoint (Page 9) Consulting-Specifying Engineer - December 2008 - News (Page 10) Consulting-Specifying Engineer - December 2008 - News (Page 11) Consulting-Specifying Engineer - December 2008 - News (Page 12) Consulting-Specifying Engineer - December 2008 - News (Page 13) Consulting-Specifying Engineer - December 2008 - News (Page 14) Consulting-Specifying Engineer - December 2008 - News (Page 15) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 24) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 25) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 26) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 27) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 28) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 29) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 30) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 31) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 32) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 33) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 34) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 35) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 36) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 37) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 38) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 39) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 40) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 41) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 42) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 43) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 44) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 45) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 46) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 47) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 48) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC1) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC2) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 49) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 50) Consulting-Specifying Engineer - December 2008 - Case Study (Page 51) Consulting-Specifying Engineer - December 2008 - Case Study (Page 52) Consulting-Specifying Engineer - December 2008 - Case Study (Page 53) Consulting-Specifying Engineer - December 2008 - New Products (Page 54) Consulting-Specifying Engineer - December 2008 - New Products (Page 55) Consulting-Specifying Engineer - December 2008 - New Products (Page 56) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - December 2008 - Advertiser Index (Page 63) Consulting-Specifying Engineer - December 2008 - Green Space (Page 64) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A1) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A2) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A4) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A5) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A6) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A7) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A8) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A9) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A10) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A11) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A12) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S5) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S6) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S7) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S8) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S9) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S10) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S11) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S12) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S13) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S14) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S15) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S16) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S17) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S18) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S19) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S20) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S21) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S22) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S23) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S24) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S25) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S26) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S27) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S28) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S29) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S30) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S31) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S32) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S33) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S34) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S35) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S36) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S37) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S38) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S39) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S40) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S41) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S42) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S43) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S44) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.