Consulting-Specifying Engineer - December 2008 - (Page 52) Case Study Beloit School District powers up with UPS protection T AT A GLANCE The wiring closets in the Beloit School District help connect data servers, IT systems, and network configurations. Source: Hewlett Packard The School District of Beloit, Wis., houses more than 7,000 students in 17 schools and administrative buildings. Facing problems with the network servers, datacom, and phone lines, the school district selected the Hewlett Packard HP T1500 G2 UPS with USB support. Rated up to 1,500 VA and 900 W, the UPS provides enough backup for network, storage, and switch equipment. Placed on each UPS, the loads provide 10 to 20 minutes of backup power should the power go out. The technology department uses HP’s Power Manager Software to remotely monitor and manage power environments through comprehensive control of the UPSs. he School District of Beloit, Wis., is responsible for more than 7,000 students in 17 schools and administrative buildings. Ranging from kindergarten to high school to alternative education, the school district emphasizes the implementation of new technology to further student achievement. Due to its growing size, the school district began to face problems connected to loss of data, interrupted IT performance, and missing network configurations. The high school in the Beloit district is a large, three-story building that holds more than 2,000 students. Linked in a star configuration, all of the building networks connect through the high school, which serves as the center of the configuration. Dean Larson, manager for technology in the Beloit School District, manages the technological infrastructure for the 16 schools and one administration center. Larson and his team narrowed down the school district’s problem to facility power quality. Facing issues of accessibility and reliability of the network servers, datacom, and phone lines, Larson’s team selected the Hewlett Packard HP T1500 G2 UPS with USB support to solve the problem. Rated up to 1,500 VA and 900 W, the UPS provides enough backup for network, storage, and switch equipment. Larson and his team placed the load on each UPS, which is designed to provide 10 to 20 minutes of backup power should the power go out. The additional time will provide an opportunity to shut down the systems or have the UPS power manager software perform an orderly shutdown. The technology department uses HP’s Power Manager Software to remotely monitor and manage power environments through comprehensive control of the UPSs. A browser interface provides secure access to management servers anywhere on the network. Power failure settings and individual load segments can be set for maximum uptime of critical servers. “There were times when we could hear the pipes and wires rattle in some of the build- Beloit-Merrill Elementary school relies on the HP UPS to provide continuous power to computer labs. Source: Hewlett Packard ings. This seemed to indicate power surges and sags as being the possible cause of our mystery issues. Along with our mystery power glitches, we also have power issues associated with lightning storms. But since we have the HP UPS protection, we have not lost any data or equipment that is plugged into those UPSs,” Larson said. In addition to the UPS, Beloit’s technology department uses an advanced alert system to notify the department when the batteries are no longer reliable and need to be replaced. The enhanced battery management feature doubles battery service life, optimizes battery recharge time, and provides advanced warning of battery failure. In the future, Larson’s team plans to install fiber, blade servers, and virtualization technology to consolidate and condense the number of servers in the various buildings to just about one-fifth the current number. The high school will serve as the focal point of the new network setup. As part of the disaster recovery plan, there will be an alternative site with IT and power protection backup facilities as well. Information provided by Hewlett-Packard Company. 52 Consulting-Specifying Engineer • DECEMBER 2008
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 Contents Viewpoint News M/E Roundtable ARC Awards New Construction Gold New Construction Silver New Construction Bronze Renovation Gold Renovation Silver A Green Approach to Air Conditioning Systems Turning Down the Lights Case Study New Products Equipment Lifecycles Advertiser Index Green Space Gas Technology Pure Power Supplement Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover2) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 2) Consulting-Specifying Engineer - December 2008 - Contents (Page 3) Consulting-Specifying Engineer - December 2008 - Contents (Page 4) Consulting-Specifying Engineer - December 2008 - Contents (Page 5) Consulting-Specifying Engineer - December 2008 - Contents (Page 6) Consulting-Specifying Engineer - December 2008 - Contents (Page 7) Consulting-Specifying Engineer - December 2008 - Contents (Page 8) Consulting-Specifying Engineer - December 2008 - Viewpoint (Page 9) Consulting-Specifying Engineer - December 2008 - News (Page 10) Consulting-Specifying Engineer - December 2008 - News (Page 11) Consulting-Specifying Engineer - December 2008 - News (Page 12) Consulting-Specifying Engineer - December 2008 - News (Page 13) Consulting-Specifying Engineer - December 2008 - News (Page 14) Consulting-Specifying Engineer - December 2008 - News (Page 15) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 24) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 25) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 26) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 27) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 28) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 29) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 30) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 31) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 32) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 33) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 34) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 35) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 36) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 37) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 38) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 39) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 40) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 41) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 42) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 43) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 44) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 45) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 46) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 47) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 48) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC1) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC2) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 49) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 50) Consulting-Specifying Engineer - December 2008 - Case Study (Page 51) Consulting-Specifying Engineer - December 2008 - Case Study (Page 52) Consulting-Specifying Engineer - December 2008 - Case Study (Page 53) Consulting-Specifying Engineer - December 2008 - New Products (Page 54) Consulting-Specifying Engineer - December 2008 - New Products (Page 55) Consulting-Specifying Engineer - December 2008 - New Products (Page 56) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - December 2008 - Advertiser Index (Page 63) Consulting-Specifying Engineer - December 2008 - Green Space (Page 64) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A1) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A2) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A4) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A5) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A6) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A7) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A8) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A9) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A10) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A11) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A12) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S5) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S6) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S7) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S8) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S9) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S10) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S11) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S12) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S13) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S14) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S15) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S16) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S17) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S18) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S19) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S20) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S21) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S22) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S23) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S24) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S25) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S26) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S27) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S28) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S29) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S30) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S31) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S32) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S33) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S34) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S35) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S36) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S37) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S38) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S39) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S40) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S41) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S42) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S43) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S44) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.