Consulting-Specifying Engineer - December 2008 - (Page 9) Editor’s Viewpoint Michael Ivanovich, Editor-in-Chief The half-full glass hile contemplating this month’s column, I noticed that the glass on my desk was half-full of coffee—cold, cruddy, day-old coffee from the community pot—that I poured into the glass so I could give my cup its annual cleaning. Why I didn’t throw the coffee away, I can’t imagine. I must have imagined that I might drink it or something. Nonetheless, my glass is half full. I guess this proves I’m an optimist. Which brings me to my point: perspective. With the economy being what it is, it’s tempting to be negative. The economic earthquake that hit in September caused a lot of panic, and we’ve been experiencing shockwaves ever since. But I’ve been tracking various sources, and I believe things are not as bad as they seem. So here’s my holiday message to you all: Look for the bright spots; there’s more than you may be aware of. In October, I attended a webcast by Reed Construction Data’s chief economist, Jim Haughey, who’s been analyzing and reporting the numbers of the construction market for more than 20 years. In his October webcast, Haughey projected a drop in the growth of the nonresidential construction market—from double-digit growth years of 2006, 2007, and 2008—to a growth of around 1% in 2009, or essentially remaining flat. This equates to a total revenue of around $450 billion. For a little perspective: In 2006, the nonresidential new construction market was around $320 billion, according to Reed Construction Data. I didn’t hear anyone complaining that 2006 was a bad year. Haughey looks primarily at construction starts. The $450 billion does not include renovations and retrofits. Renovations, retrofits, and replacements would add significantly to this number. But that was October, and a lot has happened since then, right? America has lost hundreds of thousands of jobs, U.S. automakers parked an empty dump truck in front of Congress that they want loaded with cash, and the stock market goes down every time Treasury Secretary Hank Paulson opens his mouth. So what is Haughey saying now? Well, I just got off the phone with Haughey (it’s Dec. 10 as I write this), and he said that the 2009 numbers are a bit lower than his October forecast, but not much. He said that the damage has been front-end loaded—we’re seeing the worst of it now, especially in school, office, and retail construction. Hospitals, utilities, stadiums, etc. are still going strong, generally speaking, and so are projects where the money was allocated and available for construction spending. Basically, Haughey said, the September panic did the damage. Financing is beginning to get worked out, and nonresidential construction should snap back relatively quickly in 2009 and into 2010. So, out with the bad coffee, and in with some fresh water. And a toast to your health, happiness, and success—in that order. See you in 2009. Editor’s note: Jim Haughey is authoring an article for our January issue on the 2009 and 2010 construction markets, so stay tuned. W Send your questions and comments to: Michael.Ivanovich@reedbusiness.com Consulting-Specifying Engineer • DECEMBER 2008 9
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 Contents Viewpoint News M/E Roundtable ARC Awards New Construction Gold New Construction Silver New Construction Bronze Renovation Gold Renovation Silver A Green Approach to Air Conditioning Systems Turning Down the Lights Case Study New Products Equipment Lifecycles Advertiser Index Green Space Gas Technology Pure Power Supplement Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover2) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 2) Consulting-Specifying Engineer - December 2008 - Contents (Page 3) Consulting-Specifying Engineer - December 2008 - Contents (Page 4) Consulting-Specifying Engineer - December 2008 - Contents (Page 5) Consulting-Specifying Engineer - December 2008 - Contents (Page 6) Consulting-Specifying Engineer - December 2008 - Contents (Page 7) Consulting-Specifying Engineer - December 2008 - Contents (Page 8) Consulting-Specifying Engineer - December 2008 - Viewpoint (Page 9) Consulting-Specifying Engineer - December 2008 - News (Page 10) Consulting-Specifying Engineer - December 2008 - News (Page 11) Consulting-Specifying Engineer - December 2008 - News (Page 12) Consulting-Specifying Engineer - December 2008 - News (Page 13) Consulting-Specifying Engineer - December 2008 - News (Page 14) Consulting-Specifying Engineer - December 2008 - News (Page 15) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 24) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 25) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 26) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 27) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 28) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 29) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 30) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 31) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 32) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 33) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 34) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 35) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 36) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 37) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 38) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 39) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 40) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 41) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 42) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 43) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 44) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 45) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 46) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 47) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 48) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC1) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC2) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 49) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 50) Consulting-Specifying Engineer - December 2008 - Case Study (Page 51) Consulting-Specifying Engineer - December 2008 - Case Study (Page 52) Consulting-Specifying Engineer - December 2008 - Case Study (Page 53) Consulting-Specifying Engineer - December 2008 - New Products (Page 54) Consulting-Specifying Engineer - December 2008 - New Products (Page 55) Consulting-Specifying Engineer - December 2008 - New Products (Page 56) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - December 2008 - Advertiser Index (Page 63) Consulting-Specifying Engineer - December 2008 - Green Space (Page 64) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A1) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A2) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A4) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A5) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A6) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A7) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A8) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A9) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A10) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A11) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A12) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S5) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S6) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S7) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S8) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S9) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S10) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S11) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S12) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S13) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S14) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S15) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S16) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S17) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S18) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S19) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S20) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S21) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S22) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S23) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S24) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S25) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S26) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S27) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S28) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S29) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S30) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S31) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S32) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S33) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S34) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S35) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S36) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S37) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S38) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S39) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S40) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S41) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S42) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S43) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S44) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.