Consulting-Specifying Engineer - December 2008 - (Page A3) In many cases, replacement of an older oven with a new model, such as this new impingement oven by Aeroglide, will not only increase energy efficiency, but will increase production potential. NEW IDEAS Opportunities Exist for Major Energy Savings With Industrial Ovens WWW.ENERGYSOLUTIONSCENTER.ORG In the Oven CHANGES TAKING PLACE IN THE DESIGN of industrial ovens promise major energy savings. Even a modest improvement in existing oven operations can save significant energy. Often it’s just a matter of adjusting the oven to optimum settings for the product. A new oven with full energy efficiency design can provide even larger savings. Let’s confine our discussion to gas-fired thermal ovens used in industrial applications. Operating temperatures may range from a few hundred degrees to as high as 1200°F. Generally, units that operate at higher temperatures and have rigid steel plate walls are classified as furnaces. Ovens usually have insulated sheet metal walls. The oven may be a batch type, or a continuous conveyor oven. The purpose may range from baking pastry to heat treating steel. But the common thread is an enclosed space with a controlled hightemperature environment. large as a 100 foot-long conveyor oven in a commercial bakery or food plant. The common characteristic is the use of a controlled natural gas burner to provide heat at a specified level. One of the major oven manufacturers is Wisconsin Oven Corporation. The East Troy, Wisconsin manufacturer has a broad range of batch, conveyor, quench and many specialty thermal ovens. According to Mike Grande, Technical Vice President with the firm, there is growing customer interest in achieving maximum efficiency. “There are steps owners can take, many of which are with existing ovens, and there are exciting potential energy savings with new oven equipment.” Steps to Improve Efficiency With existing ovens, he explains, a practical step is to use the idle mode when the oven is not in use for a few hours. Sometimes this feature is already installed on the oven, but not being used. Grande says, “It takes considerable energy to heat an oven up from cold.” On-site energy monitoring can help the industrial owner verify the relative efficiencies of longer standby intervals versus shutting down the oven and re-starting in advance of use. Ovens for Every Purpose Manufacturers offer ovens for many specialized uses. The loading systems, temperature ranges, and required level of precision vary. It may be as small as a bench oven in a metallurgical shop or as gastechnology / WINTER 08 A3 http://WWW.ENERGYSOLUTIONSCENTER.ORG
Table of Contents Feed for the Digital Edition of Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 Contents Viewpoint News M/E Roundtable ARC Awards New Construction Gold New Construction Silver New Construction Bronze Renovation Gold Renovation Silver A Green Approach to Air Conditioning Systems Turning Down the Lights Case Study New Products Equipment Lifecycles Advertiser Index Green Space Gas Technology Pure Power Supplement Consulting-Specifying Engineer - December 2008 Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page Cover2) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 1) Consulting-Specifying Engineer - December 2008 - Consulting-Specifying Engineer - December 2008 (Page 2) Consulting-Specifying Engineer - December 2008 - Contents (Page 3) Consulting-Specifying Engineer - December 2008 - Contents (Page 4) Consulting-Specifying Engineer - December 2008 - Contents (Page 5) Consulting-Specifying Engineer - December 2008 - Contents (Page 6) Consulting-Specifying Engineer - December 2008 - Contents (Page 7) Consulting-Specifying Engineer - December 2008 - Contents (Page 8) Consulting-Specifying Engineer - December 2008 - Viewpoint (Page 9) Consulting-Specifying Engineer - December 2008 - News (Page 10) Consulting-Specifying Engineer - December 2008 - News (Page 11) Consulting-Specifying Engineer - December 2008 - News (Page 12) Consulting-Specifying Engineer - December 2008 - News (Page 13) Consulting-Specifying Engineer - December 2008 - News (Page 14) Consulting-Specifying Engineer - December 2008 - News (Page 15) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 16) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 17) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 18) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 19) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 20) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 21) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 22) Consulting-Specifying Engineer - December 2008 - M/E Roundtable (Page 23) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 24) Consulting-Specifying Engineer - December 2008 - ARC Awards (Page 25) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 26) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 27) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 28) Consulting-Specifying Engineer - December 2008 - New Construction Gold (Page 29) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 30) Consulting-Specifying Engineer - December 2008 - New Construction Silver (Page 31) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 32) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 33) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 34) Consulting-Specifying Engineer - December 2008 - New Construction Bronze (Page 35) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 36) Consulting-Specifying Engineer - December 2008 - Renovation Gold (Page 37) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 38) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 39) Consulting-Specifying Engineer - December 2008 - Renovation Silver (Page 40) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 41) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 42) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 43) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 44) Consulting-Specifying Engineer - December 2008 - A Green Approach to Air Conditioning Systems (Page 45) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 46) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 47) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 48) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC1) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page BRC2) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 49) Consulting-Specifying Engineer - December 2008 - Turning Down the Lights (Page 50) Consulting-Specifying Engineer - December 2008 - Case Study (Page 51) Consulting-Specifying Engineer - December 2008 - Case Study (Page 52) Consulting-Specifying Engineer - December 2008 - Case Study (Page 53) Consulting-Specifying Engineer - December 2008 - New Products (Page 54) Consulting-Specifying Engineer - December 2008 - New Products (Page 55) Consulting-Specifying Engineer - December 2008 - New Products (Page 56) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 57) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 58) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 59) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 60) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 61) Consulting-Specifying Engineer - December 2008 - Equipment Lifecycles (Page 62) Consulting-Specifying Engineer - December 2008 - Advertiser Index (Page 63) Consulting-Specifying Engineer - December 2008 - Green Space (Page 64) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A1) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A2) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A4) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A5) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A6) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A7) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A8) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A9) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A10) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A11) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page A12) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover3) Consulting-Specifying Engineer - December 2008 - Gas Technology (Page Cover4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S1) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S2) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S4) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S5) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S6) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S7) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S8) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S9) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S10) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S11) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S12) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S13) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S14) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S15) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S16) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S17) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S18) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S19) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S20) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S21) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S22) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S23) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S24) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S25) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S26) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S27) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S28) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S29) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S30) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S31) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S32) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S33) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S34) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S35) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S36) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S37) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S38) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S39) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S40) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S41) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S42) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S43) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page S44) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover3) Consulting-Specifying Engineer - December 2008 - Pure Power Supplement (Page SCover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.