CSE Pure Power - Fall 2008 - (Page 6) ❯❯ PURE POWER // FALL 2008 6 in the news RENEWABLES FOCUS NEW INTEREST ON REGIONAL TRANSMISSION Transmission line access is emerging as a major roadblock to greater development of renewable energy resources, and legislators at the state and federal levels are considering new proposals to streamline approval processes. More than 25 states now have renewable portfolio standards (RPS) in place that require electric utilities to purchase a percentage of the power they sell to consumers from renewable resources. The definitions of “renewable” differ among the states, but they all include wind and solar power among acceptable technologies. In some states, utilities will be expected to provide up to 20% of their electricity from renewable sources by 2020. The lack of transmission-line access to these often-remote resources is causing many providers to question the attainability of such goals. In fact, up to 60 gigaW of new renewable capacity will need to be developed by 2025 if states are to meet current RPS goals, according to a study released in April by the Lawrence Berkeley National Laboratory. More than 93% of nonhydroelectric renewable capacity added since 1998 has come from wind power, said the authors of “Renewables Portfolio Standards in the United States.” Many of the best locations for wind-power generation are not served by existing transmission lines, raising the call for a coordinated approach to new development efforts. The National Energy Policy Act of 2005 is addressing transmission congestion. The U.S. Dept. of Energy and the Federal Energy Regulatory Commission have been given power to declare national interest energy transmission corridors, within which federal authorities www.purepowermagazine.com may be able to provide construction permits for especially contentious projects. Now some areas are considering similar corridors for areas where renewable energy might be especially plentiful. The Western Governors Assn., which represents the interests of 19 states, kicked off the Western Renewable Energy Zones Project in May. The initiative aims to identify regional renewable energy districts and encourage development of transmission capacity to reach these areas. Two Canadian provinces and areas of Mexico that also are connected to the Western Interconnection also are participating. Building on this effort, Sen. Harry Reid (R-Nevada) proposed legislation this spring authorizing federal renewable energy zones, where renewable sources could generate at least 1,000 MW. The bill would provide new financing options for building transmission lines needed to connect those resources. At the opposite end of the country, Maine regulators are taking a comprehensive look at that state’s transmission system, spurred by interconnection requests by developers to add up to 1,250 MW of wind-power capacity to the state’s grid. Maine’s transmission system has been declared maxed out by regulators, so new project developers have no way to get their power to market. Proposed line upgrades would enable that electricity to serve the entire New England grid. One of the proposed projects would add up to 400 wind turbines, and 800 MW of capacity to Aroostook County, at the state’s northernmost point. http://www.purepowermagazine.com
Table of Contents Feed for the Digital Edition of CSE Pure Power - Fall 2008 CSE Pure Power - Fall 2008 In the News Commissioning CHP Enhancing Emergency Lighting Data Centers for Uncle Sam Handling a Nuisance Trip Sustainable Projects and Partnerships New Products Ad Index CSE Pure Power - Fall 2008 CSE Pure Power - Fall 2008 - CSE Pure Power - Fall 2008 (Page Cover1) CSE Pure Power - Fall 2008 - CSE Pure Power - Fall 2008 (Page Cover2) CSE Pure Power - Fall 2008 - CSE Pure Power - Fall 2008 (Page 1) CSE Pure Power - Fall 2008 - CSE Pure Power - Fall 2008 (Page 2) CSE Pure Power - Fall 2008 - CSE Pure Power - Fall 2008 (Page 3) CSE Pure Power - Fall 2008 - CSE Pure Power - Fall 2008 (Page 4) CSE Pure Power - Fall 2008 - In the News (Page 5) CSE Pure Power - Fall 2008 - In the News (Page 6) CSE Pure Power - Fall 2008 - In the News (Page 7) CSE Pure Power - Fall 2008 - In the News (Page 8) CSE Pure Power - Fall 2008 - In the News (Page 9) CSE Pure Power - Fall 2008 - In the News (Page 10) CSE Pure Power - Fall 2008 - In the News (Page 11) CSE Pure Power - Fall 2008 - In the News (Page 12) CSE Pure Power - Fall 2008 - In the News (Page 13) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 14) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 15) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 16) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 16A) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 16B) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 17) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 18) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 19) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 20) CSE Pure Power - Fall 2008 - Commissioning CHP (Page 21) CSE Pure Power - Fall 2008 - Enhancing Emergency Lighting (Page 22) CSE Pure Power - Fall 2008 - Enhancing Emergency Lighting (Page 23) CSE Pure Power - Fall 2008 - Enhancing Emergency Lighting (Page 24) CSE Pure Power - Fall 2008 - Enhancing Emergency Lighting (Page 25) CSE Pure Power - Fall 2008 - Data Centers for Uncle Sam (Page 26) CSE Pure Power - Fall 2008 - Data Centers for Uncle Sam (Page 27) CSE Pure Power - Fall 2008 - Data Centers for Uncle Sam (Page 28) CSE Pure Power - Fall 2008 - Data Centers for Uncle Sam (Page 29) CSE Pure Power - Fall 2008 - Data Centers for Uncle Sam (Page 30) CSE Pure Power - Fall 2008 - Data Centers for Uncle Sam (Page 31) CSE Pure Power - Fall 2008 - Handling a Nuisance Trip (Page 32) CSE Pure Power - Fall 2008 - Handling a Nuisance Trip (Page 33) CSE Pure Power - Fall 2008 - Handling a Nuisance Trip (Page 34) CSE Pure Power - Fall 2008 - Handling a Nuisance Trip (Page 35) CSE Pure Power - Fall 2008 - Handling a Nuisance Trip (Page 36) CSE Pure Power - Fall 2008 - Sustainable Projects and Partnerships (Page 37) CSE Pure Power - Fall 2008 - Sustainable Projects and Partnerships (Page 38) CSE Pure Power - Fall 2008 - Sustainable Projects and Partnerships (Page 39) CSE Pure Power - Fall 2008 - Sustainable Projects and Partnerships (Page 40) CSE Pure Power - Fall 2008 - New Products (Page 41) CSE Pure Power - Fall 2008 - New Products (Page 42) CSE Pure Power - Fall 2008 - New Products (Page 43) CSE Pure Power - Fall 2008 - Ad Index (Page 44) CSE Pure Power - Fall 2008 - Ad Index (Page Cover3) CSE Pure Power - Fall 2008 - Ad Index (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.