Railway Track & Structures - February 2009 - (Page 12) AREMA NEWS AREMA Online Instructions to order publications from www. arema.org. 1. Enter your User Name and Password in the boxes located on the left menu. Standard login (for those who have not changed their login information): User name = AREMA ID Number Password = Last name + First initial (no spaces and not case sensitive) For example, the Password for John Smith is smithj. 2. If you have never ordered a publication, been a member or attended a conference or seminar, click Create Account to set-up a record and assign a User Name and Password in order to login to the Website. 3. Click the Online Store link located on the top menu. 4. Choose your publication using one of the following methods: a. Click “add to your products” if your item is one of the Featured Products. b. Click on the appropriate heading in the Departments section. i. Navigate the pages within each department by clicking the page number or Next located just above Featured Products. ii. Click “add to your products” on the publication to be ordered. 5. Click Keep Shopping if choosing additional publications. 6. When all publications have been selected, click Proceed To Checkout to review the order. 7. Click Product Total to review the fees. 8. Click Check-Out to enter credit card information. 10. Click Check-Out to complete the order. Be sure to click this button only once in order to prevent multiple charges. 11. To print the confirmation page and charges, set your printer to Landscape. For further assistance with ordering online, call AREMA at +1 (301) 459-3200. Please note that these online instructions are for shipments within the United States and Canada. For other locations, please call +1 (301) 459-3200, ext. 701. 12 Railway Track & Structures February 2009 AREMA Publications AREMA Bridge Inspection Handbook© The AREMA Bridge Inspection Handbook© provides a comprehensive source of information and criteria for bridge inspections for engineers engaged in the assessment of railway bridges. This Handbook is published as a guide to establishing policies and practices relative to bridge inspection. It covers such topics as confined spaces, site conditions, loads & forces, nomenclature, bridge decks, timber, concrete & steel bridges, movable bridges, tunnel and culvert inspections, and emergency & post-earthquake inspections. Also included are many color photographed examples in several chapters, as well as a glossary in the back of the book. 2009 Communications & Signals Manual of Recommended Practices There are almost 115 new, revised, reaffirmed & extended Manual Parts in the 2009 edition. An Entirely new section - Section 23 Communication-Based Signaling has been added. The Manual is an annual publication, available in 5-volume loose-leaf format, CD-ROM, revision set (loose-leaf format) and individual sections (loose-leaf format only). 2008 Manual for Railway Engineering There have been numerous updates to more than 4,000 pages of the Manual for Railway Engineering. The chapters are grouped into four general categories, each in a separate volume: • Track • Structures • Infrastructure & Passenger • System Management The Manual is available in 4-volume loose-leaf format, CD-ROM, revision set (loose-leaf format only) and individual chapters (loose-leaf format only). Practical Guide to Railway Engineering This guide provides a comprehensive overview and understanding of the railway system. Whether you are new to the rail industry or a longtime contributor wanting to learn more, this bound book and CD-ROM offer in-depth coverage of railway fundamentals and serve as an excellent reference. (Also available in a CD-ROM version only.) 2008 Portfolio of Trackwork Plans The 2008 Portfolio of Trackwork Plans consists of plans and specifications that relate to the design, details, materials and workmanship for switches, frogs, turnouts & crossovers, crossings, rails and other special trackwork. This is a companion volume to the Manual for Railway Engineering. To order any or all of the AREMA publications, please log on to www.arema.org or contact Beth Caruso at +1 (301) 459-3200, ext. 701 or bcaruso@arema.org. American Railway Engineering and Maintenance-of-Way Association 10003 Derekwood Lane, Suite 210, Lanham, MD 20706-4362 Phone: +1 (301) 459-3200 / Fax: +1 (301) 459-8077 www.arema.org www.rtands.com http://www.arema.org http://www.arema.org http://www.arema.org http://www.arema.org http://www.arema.org http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - February 2009 Railway Track and Structures - February 2009 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Railroads Stepping Up Use of Technology to Locate Rail Flaws Rail Lubrication Realizing Great Potential M/W Challenges: Track Settlement at Bridge Approaches Supplier Profiles Products and Literature People Calendar Advertisers Index Sales Representatives Website Directory Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - February 2009 Railway Track & Structures - February 2009 - Railway Track and Structures - February 2009 (Page Cover1) Railway Track & Structures - February 2009 - Railway Track and Structures - February 2009 (Page Cover2) Railway Track & Structures - February 2009 - Contents (Page 1) Railway Track & Structures - February 2009 - Contents (Page 2) Railway Track & Structures - February 2009 - On Track (Page 3) Railway Track & Structures - February 2009 - Industry Today (Page 4) Railway Track & Structures - February 2009 - Industry Today (Page 5) Railway Track & Structures - February 2009 - Industry Today (Page 6) Railway Track & Structures - February 2009 - Supplier News (Page 7) Railway Track & Structures - February 2009 - AREMA News (Page 8) Railway Track & Structures - February 2009 - AREMA News (Page 9) Railway Track & Structures - February 2009 - AREMA News (Page 10) Railway Track & Structures - February 2009 - AREMA News (Page 11) Railway Track & Structures - February 2009 - AREMA News (Page 12) Railway Track & Structures - February 2009 - AREMA News (Page 13) Railway Track & Structures - February 2009 - AREMA News (Page 14) Railway Track & Structures - February 2009 - AREMA News (Page 15) Railway Track & Structures - February 2009 - NRC News (Page 16) Railway Track & Structures - February 2009 - TTCI R&D (Page 17) Railway Track & Structures - February 2009 - TTCI R&D (Page 18) Railway Track & Structures - February 2009 - TTCI R&D (Page 19) Railway Track & Structures - February 2009 - TTCI R&D (Page 20) Railway Track & Structures - February 2009 - TTCI R&D (Page 21) Railway Track & Structures - February 2009 - TTCI R&D (Page 22) Railway Track & Structures - February 2009 - Railroads Stepping Up Use of Technology to Locate Rail Flaws (Page 23) Railway Track & Structures - February 2009 - Railroads Stepping Up Use of Technology to Locate Rail Flaws (Page 24) Railway Track & Structures - February 2009 - Railroads Stepping Up Use of Technology to Locate Rail Flaws (Page 25) Railway Track & Structures - February 2009 - Railroads Stepping Up Use of Technology to Locate Rail Flaws (Page 26) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 27) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 28) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 29) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 30) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 31) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 32) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 33) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 34) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 35) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 36) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 37) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 38) Railway Track & Structures - February 2009 - Supplier Profiles (Page 39) Railway Track & Structures - February 2009 - People (Page 40) Railway Track & Structures - February 2009 - Calendar (Page 41) Railway Track & Structures - February 2009 - Sales Representatives (Page 42) Railway Track & Structures - February 2009 - Website Directory (Page 43) Railway Track & Structures - February 2009 - Professional Directory (Page 44) Railway Track & Structures - February 2009 - Classified Advertising (Page 45) Railway Track & Structures - February 2009 - Classified Advertising (Page 46) Railway Track & Structures - February 2009 - Classified Advertising (Page 47) Railway Track & Structures - February 2009 - Chicago Perspective (Page 48) Railway Track & Structures - February 2009 - Chicago Perspective (Page Cover3) Railway Track & Structures - February 2009 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.