Railway Track & Structures - February 2009 - (Page 31) resources, in order to efficiently and effectively maintain and fill systems across the territory. High Speed tribometer surveys and instrumented lateral/vertical force measurement sites are being utilized to verify overall system performance. The net result for CPR is hands-free friction management, in which all maintenance and filling logistics are handled by Portec Rail Group, and overall system performance is reported regularly to ensure ongoing delivery of expected benefits. Tranergy Sid Kumar, chairman/president of Tranergy Corp., said, “Tranergy has continued its tradition of continuous R&D leading to ‘innovation through understanding’ and has progressed a great deal in developing unique new solutions for optimizing the wheel rail interface for reducing railroad costs and simultaneously improving performance and safety in an environmentally clean way. We agree with David Connell, vice president-engineering, Union Pacific, who said, ‘I believe optimizing wheel-rail friction continues to be one of the largest opportunities the industry has to drive down operating costs’. “We believe that railroads will maintain and possibly increase their rail lubrication programs in 2009, Kumar said. “This is because of the large benefits they derive from the new top-of-rail lubrication products available to them today and because it reduces their m/w costs, fuel costs, derailment risk, environmental costs and it helps their bottom line. “Tranergy had its best year yet in 2008,” he noted. “Our export business has increased and railroads are realizing the benefits of Tranergy’s lubrication products.” He further stated, “With several years of R&D, Tranergy Tranergy’s new CurvGlide™ is for wayside top-of-rail plus gauge corner lubrication of curves. has introduced a revolutionary new product called CurvGlide™ for wayside top-of-rail plus gauge corner lubrication of curves. It is a computer-controlled precision micro-jet-technology-based rail-curve lubrication system that can be installed in the beginning or the middle of a curve or an S curve for maximum rail coverage of several miles. Unlike other systems that require one machine for gauge face lubrication and another for top-of-rail lubrication, one CurvGlide machine accomplishes both tasks, making it cost effective to buy. It becomes even more cost effective when two or three tracks need to be lubricated at one site. CurvGlide models for this purpose are available.” Thom Miller, national sales manager, added, “The amount www.rtands.com Railway Track & Structures February 2009 31 http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - February 2009 Railway Track and Structures - February 2009 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Railroads Stepping Up Use of Technology to Locate Rail Flaws Rail Lubrication Realizing Great Potential M/W Challenges: Track Settlement at Bridge Approaches Supplier Profiles Products and Literature People Calendar Advertisers Index Sales Representatives Website Directory Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - February 2009 Railway Track & Structures - February 2009 - Railway Track and Structures - February 2009 (Page Cover1) Railway Track & Structures - February 2009 - Railway Track and Structures - February 2009 (Page Cover2) Railway Track & Structures - February 2009 - Contents (Page 1) Railway Track & Structures - February 2009 - Contents (Page 2) Railway Track & Structures - February 2009 - On Track (Page 3) Railway Track & Structures - February 2009 - Industry Today (Page 4) Railway Track & Structures - February 2009 - Industry Today (Page 5) Railway Track & Structures - February 2009 - Industry Today (Page 6) Railway Track & Structures - February 2009 - Supplier News (Page 7) Railway Track & Structures - February 2009 - AREMA News (Page 8) Railway Track & Structures - February 2009 - AREMA News (Page 9) Railway Track & Structures - February 2009 - AREMA News (Page 10) Railway Track & Structures - February 2009 - AREMA News (Page 11) Railway Track & Structures - February 2009 - AREMA News (Page 12) Railway Track & Structures - February 2009 - AREMA News (Page 13) Railway Track & Structures - February 2009 - AREMA News (Page 14) Railway Track & Structures - February 2009 - AREMA News (Page 15) Railway Track & Structures - February 2009 - NRC News (Page 16) Railway Track & Structures - February 2009 - TTCI R&D (Page 17) Railway Track & Structures - February 2009 - TTCI R&D (Page 18) Railway Track & Structures - February 2009 - TTCI R&D (Page 19) Railway Track & Structures - February 2009 - TTCI R&D (Page 20) Railway Track & Structures - February 2009 - TTCI R&D (Page 21) Railway Track & Structures - February 2009 - TTCI R&D (Page 22) Railway Track & Structures - February 2009 - Railroads Stepping Up Use of Technology to Locate Rail Flaws (Page 23) Railway Track & Structures - February 2009 - Railroads Stepping Up Use of Technology to Locate Rail Flaws (Page 24) Railway Track & Structures - February 2009 - Railroads Stepping Up Use of Technology to Locate Rail Flaws (Page 25) Railway Track & Structures - February 2009 - Railroads Stepping Up Use of Technology to Locate Rail Flaws (Page 26) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 27) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 28) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 29) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 30) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 31) Railway Track & Structures - February 2009 - Rail Lubrication Realizing Great Potential (Page 32) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 33) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 34) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 35) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 36) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 37) Railway Track & Structures - February 2009 - M/W Challenges: Track Settlement at Bridge Approaches (Page 38) Railway Track & Structures - February 2009 - Supplier Profiles (Page 39) Railway Track & Structures - February 2009 - People (Page 40) Railway Track & Structures - February 2009 - Calendar (Page 41) Railway Track & Structures - February 2009 - Sales Representatives (Page 42) Railway Track & Structures - February 2009 - Website Directory (Page 43) Railway Track & Structures - February 2009 - Professional Directory (Page 44) Railway Track & Structures - February 2009 - Classified Advertising (Page 45) Railway Track & Structures - February 2009 - Classified Advertising (Page 46) Railway Track & Structures - February 2009 - Classified Advertising (Page 47) Railway Track & Structures - February 2009 - Chicago Perspective (Page 48) Railway Track & Structures - February 2009 - Chicago Perspective (Page Cover3) Railway Track & Structures - February 2009 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.