Railway Track & Structures - March 2009 - (Page 17) TTCI R&D Rail joint installation and maintenance recommended practices Table 1, left, shows the effects of component changes on maximum IJ epoxy stresses. Figure 1 shows the installation of IJs on track panels. TTCI gathers best practices to significantly extend rail joint service life. T he effects of installation, maintenance and rail longitudinal stress management on rail joint service life can be significant. Transportation Technology Center, Inc., observed current operations on two major railroads and supplemented the findings with analysis and controlled experiments to compile a list of best practices as described. Joint installation For all joint designs, a supported foundation is superior to a suspended foundation for purposes of maximizing service life in heavy-axle-load service.1 www.rtands.com A supported foundation is one that has a crosstie under the rail ends of the joint. Traditionally, suspended joints (with rail ends over a ballast crib) are used to ensure that a) tie plates will not cause an electrical short on insulated joints (IJ) and b) a thermite weld can be made to eliminate the joint in the future. With the advent of better insulator materials and application technologies, a reliable insulating bearing plate can now be used with supported foundation insulated joints. The most significant advantage of a supported foundation is the reduced maximum shear stresses in the joint. 2 For epoxied joints, the reduction is in the epoxy layer, near the end post. For non-epoxied joints, the reduction is in the compression (contact) surfaces of the joint and rail-bar fasteners. Table 1 shows the relative effects of various components on IJ epoxy stresses. Note that a supported foundation provides a larger benefit (up to 30 percent reduction in shear stress) as compared to other design changes. Contrary to expectations, increasing joint bar section modulus, while keeping all other design elements the same, will increase epoxy shear stresses. The joint will have less deflection, but the stresses in the weakest component, the epoxy, will be higher. If the intent is to replace a temporary mechanical joint with a thermite weld, then a suspended foundation is preferable. The base of a thermite weld would have to be ground flush with the rail to accept a David D. Davis, TTCI senior scientist, Muhammad N. Akhtar, TTCI senior engineer, and David M. Read, TTCI principal investigator Railway Track & Structures March 2009 17 http://www.aar.com http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - March 2009 Railway Track & Structures - March 2009 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D NRC Smashes Attendance Bridge Inspection Battling Bugs Ballast Fundamentals Vital to Keeping Track in Shape Products and Literature People Calendar Sales Representatives Advertisers Index Website Directory Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - March 2009 Railway Track & Structures - March 2009 - Railway Track & Structures - March 2009 (Page Cover1) Railway Track & Structures - March 2009 - Railway Track & Structures - March 2009 (Page Cover2) Railway Track & Structures - March 2009 - Contents (Page 1) Railway Track & Structures - March 2009 - Contents (Page 2) Railway Track & Structures - March 2009 - On Track (Page 3) Railway Track & Structures - March 2009 - On Track (Page 4) Railway Track & Structures - March 2009 - Industry Today (Page 5) Railway Track & Structures - March 2009 - Industry Today (Page 6) Railway Track & Structures - March 2009 - Supplier News (Page 7) Railway Track & Structures - March 2009 - Supplier News (Page 8) Railway Track & Structures - March 2009 - Supplier News (Page 9) Railway Track & Structures - March 2009 - AREMA News (Page 10) Railway Track & Structures - March 2009 - AREMA News (Page 11) Railway Track & Structures - March 2009 - AREMA News (Page 12) Railway Track & Structures - March 2009 - AREMA News (Page 13) Railway Track & Structures - March 2009 - AREMA News (Page 14) Railway Track & Structures - March 2009 - AREMA News (Page 15) Railway Track & Structures - March 2009 - NRC News (Page 16) Railway Track & Structures - March 2009 - TTCI R&D (Page 17) Railway Track & Structures - March 2009 - TTCI R&D (Page 18) Railway Track & Structures - March 2009 - TTCI R&D (Page 19) Railway Track & Structures - March 2009 - TTCI R&D (Page 20) Railway Track & Structures - March 2009 - NRC Smashes Attendance (Page 21) Railway Track & Structures - March 2009 - NRC Smashes Attendance (Page 22) Railway Track & Structures - March 2009 - NRC Smashes Attendance (Page 23) Railway Track & Structures - March 2009 - NRC Smashes Attendance (Page 24) Railway Track & Structures - March 2009 - NRC Smashes Attendance (Page 25) Railway Track & Structures - March 2009 - NRC Smashes Attendance (Page 26) Railway Track & Structures - March 2009 - Bridge Inspection Battling Bugs (Page 27) Railway Track & Structures - March 2009 - Bridge Inspection Battling Bugs (Page 28) Railway Track & Structures - March 2009 - Bridge Inspection Battling Bugs (Page 29) Railway Track & Structures - March 2009 - Bridge Inspection Battling Bugs (Page 30) Railway Track & Structures - March 2009 - Ballast Fundamentals Vital to Keeping Track in Shape (Page 31) Railway Track & Structures - March 2009 - Ballast Fundamentals Vital to Keeping Track in Shape (Page 32) Railway Track & Structures - March 2009 - Ballast Fundamentals Vital to Keeping Track in Shape (Page 33) Railway Track & Structures - March 2009 - Ballast Fundamentals Vital to Keeping Track in Shape (Page 34) Railway Track & Structures - March 2009 - Ballast Fundamentals Vital to Keeping Track in Shape (Page 35) Railway Track & Structures - March 2009 - Ballast Fundamentals Vital to Keeping Track in Shape (Page 36) Railway Track & Structures - March 2009 - Ballast Fundamentals Vital to Keeping Track in Shape (Page 37) Railway Track & Structures - March 2009 - Products and Literature (Page 38) Railway Track & Structures - March 2009 - Products and Literature (Page 39) Railway Track & Structures - March 2009 - People (Page 40) Railway Track & Structures - March 2009 - Calendar (Page 41) Railway Track & Structures - March 2009 - Advertisers Index (Page 42) Railway Track & Structures - March 2009 - Website Directory (Page 43) Railway Track & Structures - March 2009 - Professional Directory (Page 44) Railway Track & Structures - March 2009 - Classified Advertising (Page 45) Railway Track & Structures - March 2009 - Classified Advertising (Page 46) Railway Track & Structures - March 2009 - Classified Advertising (Page 47) Railway Track & Structures - March 2009 - Chicago Perspective (Page 48) Railway Track & Structures - March 2009 - Chicago Perspective (Page Cover3) Railway Track & Structures - March 2009 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.