Railway Track & Structures - May 2008 - (Page 33) PIPE RAMMING Pipe ramming can be a horizontal or vertical installation as an Iowa Trenchless crew demonstrates. The crew installed a 30-inch casing at a 47-percent grade for a storm sewer. The crew hammered the pipe on line and grade. After the hammering was complete, the crew used an auger boring machine to clean the casing. Nicholson, Clark and Holcomb all agree that humps, sags and voids are not strong concerns with pipe ramming. “We’ve had a lot better luck with ramming more than anything else with having less humps and sags,” said Clark. “We’re doing an 84-inch ram that was designed with inadequate cover and it’s in looser ground, but humps and sags have not been a problem.” Nicholson said, “This is where the ability to swallow debris is beneficial. We’re dealing with a casing that is typically a half-inch thick in diameter. If we capped off the end of the pipe and were trying to drive it into the ground, we would have a problem, but by leaving the end of the casing open, we’re allowing that debris, material, rock, railroad tie or whatever has been buried to be swallowed in the casing.” “Railroads are purchasing ramming tools and replacing bad culverts themselves and also contract many projects out to contractors that specialize in boring. Many railroads specify ramming as a preferred boring technique after they experience the method because it minimizes the chance for undermining of the tracks,” said Holcomb. Railroad use rising Nicholson relates the safety factor of pipe ramming to its growing use among railroads. “It does go back to the one disadvantage of auger boring, which is that lead head is out in front of the pipe and settlement and rail safety is always a concern, so knowing that soil will not be removed until after the fact creates a great opportunity. “It is a viable option for new installations and certainly [an option] as railroads continue to rehabilitate or continue to improve the state of their infrastructure,” said Nicholson. Clark agrees, “Railroads have been more open and we’ve been doing more of it. Some railroad people are skeptical until they see the process. We’ve never had anyone who did not like pipe ramming after using it.” www.rtands.com Railway Track & Structures May 2008 33 http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - May 2008 Railway Track & Structures - May 2008 On Track Industry Today Supplier News AREMA News NRC News TTCI R&D NRC In Good Shape to Face Upcoming Challenges Pipe Ramming Can Aid Drainage Conrail Building to Handle Booming Northern New Jersey Traffic Products and Literature People Calendar Sales Representatives Advertisers Index Website Directory Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - May 2008 Railway Track & Structures - May 2008 - Railway Track & Structures - May 2008 (Page Cover1) Railway Track & Structures - May 2008 - Railway Track & Structures - May 2008 (Page Cover2) Railway Track & Structures - May 2008 - Railway Track & Structures - May 2008 (Page 1) Railway Track & Structures - May 2008 - Railway Track & Structures - May 2008 (Page 2) Railway Track & Structures - May 2008 - On Track (Page 3) Railway Track & Structures - May 2008 - On Track (Page 4) Railway Track & Structures - May 2008 - Industry Today (Page 5) Railway Track & Structures - May 2008 - Industry Today (Page 6) Railway Track & Structures - May 2008 - Supplier News (Page 7) Railway Track & Structures - May 2008 - Supplier News (Page 8) Railway Track & Structures - May 2008 - Supplier News (Page 9) Railway Track & Structures - May 2008 - Supplier News (Page 10) Railway Track & Structures - May 2008 - AREMA News (Page 11) Railway Track & Structures - May 2008 - AREMA News (Page 12) Railway Track & Structures - May 2008 - AREMA News (Page 13) Railway Track & Structures - May 2008 - AREMA News (Page 14) Railway Track & Structures - May 2008 - AREMA News (Page 15) Railway Track & Structures - May 2008 - AREMA News (Page 16) Railway Track & Structures - May 2008 - AREMA News (Page 17) Railway Track & Structures - May 2008 - NRC News (Page 18) Railway Track & Structures - May 2008 - TTCI R&D (Page 19) Railway Track & Structures - May 2008 - TTCI R&D (Page 20) Railway Track & Structures - May 2008 - TTCI R&D (Page 21) Railway Track & Structures - May 2008 - TTCI R&D (Page 22) Railway Track & Structures - May 2008 - NRC In Good Shape to Face Upcoming Challenges (Page 23) Railway Track & Structures - May 2008 - NRC In Good Shape to Face Upcoming Challenges (Page 24) Railway Track & Structures - May 2008 - NRC In Good Shape to Face Upcoming Challenges (Page 25) Railway Track & Structures - May 2008 - NRC In Good Shape to Face Upcoming Challenges (Page 26) Railway Track & Structures - May 2008 - NRC In Good Shape to Face Upcoming Challenges (Page 27) Railway Track & Structures - May 2008 - NRC In Good Shape to Face Upcoming Challenges (Page 28) Railway Track & Structures - May 2008 - NRC In Good Shape to Face Upcoming Challenges (Page 29) Railway Track & Structures - May 2008 - NRC In Good Shape to Face Upcoming Challenges (Page 30) Railway Track & Structures - May 2008 - Pipe Ramming Can Aid Drainage (Page 31) Railway Track & Structures - May 2008 - Pipe Ramming Can Aid Drainage (Page 32) Railway Track & Structures - May 2008 - Pipe Ramming Can Aid Drainage (Page 33) Railway Track & Structures - May 2008 - Pipe Ramming Can Aid Drainage (Page 34) Railway Track & Structures - May 2008 - Conrail Building to Handle Booming Northern New Jersey Traffic (Page 35) Railway Track & Structures - May 2008 - Conrail Building to Handle Booming Northern New Jersey Traffic (Page 36) Railway Track & Structures - May 2008 - Conrail Building to Handle Booming Northern New Jersey Traffic (Page 37) Railway Track & Structures - May 2008 - Conrail Building to Handle Booming Northern New Jersey Traffic (Page 38) Railway Track & Structures - May 2008 - Conrail Building to Handle Booming Northern New Jersey Traffic (Page 39) Railway Track & Structures - May 2008 - Conrail Building to Handle Booming Northern New Jersey Traffic (Page 40) Railway Track & Structures - May 2008 - Conrail Building to Handle Booming Northern New Jersey Traffic (Page 41) Railway Track & Structures - May 2008 - Conrail Building to Handle Booming Northern New Jersey Traffic (Page 42) Railway Track & Structures - May 2008 - Products and Literature (Page 43) Railway Track & Structures - May 2008 - People (Page 44) Railway Track & Structures - May 2008 - Sales Representatives (Page 45) Railway Track & Structures - May 2008 - Advertisers Index (Page 46) Railway Track & Structures - May 2008 - Website Directory (Page 47) Railway Track & Structures - May 2008 - Professional Directory (Page 48) Railway Track & Structures - May 2008 - Classified Advertising (Page 49) Railway Track & Structures - May 2008 - Classified Advertising (Page 50) Railway Track & Structures - May 2008 - Classified Advertising (Page 51) Railway Track & Structures - May 2008 - Chicago Perspective (Page 52) Railway Track & Structures - May 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - May 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.