Railway Track & Structures - June 2008 - (Page 37) Equipment & Materials Guide International Track Systems, Inc.— Full-length 3⁄16- x 8-in. x 8-ft, 6-in. rubber tie pads are designed to improve ride quality and reduce grade-crossing maintenance when used on each tie in the crossing. Phone: 440-992-9206. Lewis Bolt & Nut Co.—Washerhead timber drive spikes are single-forged, which eliminates both the need for a separate washer and the corrosion that occurs between washer and head. The spikes can be driven with a maul or pneumatic spike driver, and can be removed with hand or power tools. The threads have excellent holding power, and the spikes are easily and quickly installed and removed. They are used in highwaycrossing planks and other timber structures. Phone: 800-328-3480. FAB-RA-CAST®—FAB-RA-FILLER™ bonds completely to the rail steel and to the panel regardless of its composition and retains its elasticity permanently. Because it is mixed on-site and poured in place, the material can be molded to provide a totally-flat running surface between the approach panel and rail head. FAB-RA-FILLER is a non-conductor, making it safe for use in signal territory to help isolate the rails. Phone: 248-354-7185. International Track Systems, Inc.— Flangeway filler strip: Eliminates the Flangeway Gap so industrial trucks can cross smoothly and prohibits bicycle tires, shoes and debris from being caught in the rail flange. Compresses under the wheels of rail traffic and then returns to its original shape. Available for all rail sizes and any type of crossing material. Phone: 440-992-9206. Lewis Bolt & Nut Co.—Sealtite Dome Head Drive Spikes have a thin domeshaped head that eliminates counterboring, thus preventing excessive timber decay and rust, and reduces maintenance. Low profile adds to worker safety. The large-diameter head seals moisture away from spike shank and prevents rust, and the extra-large bearing surface holds tight. Installed with a pneumatic air tool or with a maul, the spikes are used to fasten highway-crossing planks. Phone: 800-328-3480. tween road surface and the railtrack structure. The rubber inserts are engineered to dampen vehicle loading and absorb energy at the rail interface. The profiles are manufactured from specially-formulated rubber compounds designed specifically to provide outstanding performance and durability in the railroad crossing environment. Products are available in all rail sizes and fastening configurations or can be custom designed for specific requirements. Phone: 888-222-5968. GKI Cutting Tools—Distributor of carbide bits for rail drilling tools. Repair of bit holders at a savings of 50% or more over cost of new holders. Phone: 815-459-2330. Magnum Manufacturing Corp.— Rubber flange filler is a durable rubber placed in the flange to prevent dirt and debris from filling the crossing. The filler completely surrounds the flange with a thick rubber section and prevents rocks and other obstacles from being pressed into the flange area under train traffic. Fillers can be used on wood or concrete ties and on all rail sizes from 90 lbs to 136 lbs. These reusable flange fillers are designed for easy installation. Phone: 801-785-9700. HiRAIL Corp.—RS is a rubber rail seal product designed to protect the rail and to provide a pre-formed flangeway throughout the crossing surface. Fitting snugly against the rail on both gauge and field sides, it provides a buffer between the asphalt and the rail. Its rubber composition can flex with heavy rail traffic. Two people can install the rail seal that comes in 6-ft-long, 55-lb sections. The rubber flexes with changing temperatures and repels road chemicals. Phone: 800-274-7245. International Track Systems, Inc.—Flangeway rubber inserts eliminate the flangeway gap on industrial crossings. Manufactured from 70-durometer EPDM synthetic rubber, the inserts provide a smooth crossing surface that compresses under the wheels of railway traffic. The inserts have excellent weathering properties and are available for wood, concrete, asphalt or rubber crossings. Phone: 440-992-9206. www.rtands.com Phoenix DT GmbH—The Phoenix continuous resilient rail seating also used in sleeper tracks has many advantages as electrical insulation, high damping of structure-borne noise and adjustable rail deflection due to different base profiles. It can be combined with various surface materials such as concrete, asphalt, cobblestone or grass. The installation is very easy and efficient, prefabricated or on construction site even under operating conditions and available for turnouts or crossings. Phone: +49-3622 633 423. Lewis Bolt & Nut Co.—Speciallycoated, 5/8-in.- and 3⁄4-in.-diameter, Recessed-Head Timber Screws for crossing planks allow quick installation with standard tools. Pre-boring is recommended, but is not necessary, and the screws are available in various lengths with either round or square heads. Forged one-piece washerhead eliminates the need for separate washer and seals out moisture to prevent rust and wood decay. Phone: 800-328-3480. OMNI Products, Inc.—OMNI Virgin Rubber RailGuard™ (VRA) is made from 100% virgin rubber. RailGuard is used in combination with asphalt or precast concrete panels. VRA protects the track structure by absorbing traffic impact loads, and provides a positive flangeway, which controls surface water runoff and prevents breakup of the asphalt or concrete at the rail interface. RailGuard can be produced for 90-lb to 141-lb rail sizes. RailGuard can be installed on either timber or concrete ties. Phone: 815-344-3100. Performance Polymers Inc.—PPI Railseal profiles have been designed to provide a smooth transition be- Polycorp Ltd. —ISO 9001 Registered, Epflex® Railseal Interface and Eplock II have revolutionized the asphalt crossing. Our patented Eplock II clips mean fast, safe, longlasting crossings with increased structural integrity. Our broad product line allows for custom solutions for embedded rail problems. Extruded from virgin materials, Epflex Railseal Interface is available in all sizes and unconditionally guaranteed. Phone: 800-265-2710. June 2008 37 Railway Track & Structures http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - June 2008 Railway Track & Structures - June 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Grade Crossings Provide Interface Between Railroads, Public Grade-Crossing Equipment & Materials Guide Fastener Suppliers Getting a Grip Grinding Plays Part in Rail Maintenance Big Picture Products and Literature People Calendar Sales Representatives Website Directory Advertisers Index Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - June 2008 Railway Track & Structures - June 2008 - Railway Track & Structures - June 2008 (Page Cover1) Railway Track & Structures - June 2008 - Railway Track & Structures - June 2008 (Page Cover2) Railway Track & Structures - June 2008 - Contents (Page 1) Railway Track & Structures - June 2008 - Contents (Page 2) Railway Track & Structures - June 2008 - On Track (Page 3) Railway Track & Structures - June 2008 - On Track (Page 4) Railway Track & Structures - June 2008 - Industry Today (Page 5) Railway Track & Structures - June 2008 - Industry Today (Page 6) Railway Track & Structures - June 2008 - Supplier News (Page 7) Railway Track & Structures - June 2008 - Supplier News (Page 8) Railway Track & Structures - June 2008 - Supplier News (Page 9) Railway Track & Structures - June 2008 - AREMA News (Page 10) Railway Track & Structures - June 2008 - AREMA News (Page 11) Railway Track & Structures - June 2008 - AREMA News (Page 12) Railway Track & Structures - June 2008 - AREMA News (Page 13) Railway Track & Structures - June 2008 - AREMA News (Page 14) Railway Track & Structures - June 2008 - AREMA News (Page 15) Railway Track & Structures - June 2008 - AREMA News (Page 16) Railway Track & Structures - June 2008 - NRC News (Page 17) Railway Track & Structures - June 2008 - TTCI R&D (Page 18) Railway Track & Structures - June 2008 - TTCI R&D (Page 19) Railway Track & Structures - June 2008 - TTCI R&D (Page 20) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 21) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 22) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 23) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 24) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 25) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 26) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 27) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 28) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 29) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 30) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 31) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 32) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 33) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 34) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 35) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 36) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 37) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 38) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 39) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 40) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 41) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 42) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 43) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 44) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 45) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 46) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 47) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 48) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 49) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 50) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 51) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 52) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 53) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 54) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 55) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 56) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 57) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 58) Railway Track & Structures - June 2008 - People (Page 59) Railway Track & Structures - June 2008 - Sales Representatives (Page 60) Railway Track & Structures - June 2008 - Website Directory (Page 61) Railway Track & Structures - June 2008 - Advertisers Index (Page 62) Railway Track & Structures - June 2008 - Professional Directory (Page 63) Railway Track & Structures - June 2008 - Classified Advertising (Page 64) Railway Track & Structures - June 2008 - Classified Advertising (Page 65) Railway Track & Structures - June 2008 - Classified Advertising (Page 66) Railway Track & Structures - June 2008 - Classified Advertising (Page 67) Railway Track & Structures - June 2008 - Chicago Perspective (Page 68) Railway Track & Structures - June 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - June 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.