Railway Track & Structures - June 2008 - (Page 45) Fasteners Fasteners help railroads get a grip Fastener vendors are meeting railroad demands for long-lasting, reliable fasteners that can be installed quickly and can stand up to today’s heavy traffic. by Tom Judge, editor T o paraphrase the philosopher, if the fasteners don’t hold, there is chaos. Fortunately, fasteners suppliers are coming up with new products and features that ensure everything will hold together—and chaos can be kept at bay. AirBoss “AirBoss continues to make progress with our Tie Captive System that offers our fastening components pre-assembled on a concrete tie,” said Bob Magnuson, president of AirBoss Railway Products, Inc. “Sufficient interest has been generated with our customers that will encourage significant installations this month. The benefits of the system are reduced labor input for field installation and larger shoulder face design to increase insulator life. By integrating the existing clip design into the new system, we are confident that fastening dependability and service life will generate significant improvements for the end user. Preliminary laboratory examinawww.rtands.com tions have verified this optimism. “Because of significant cutbacks in new tie installations projected by our major customers, our market projection is generally static,” he said. “However, with new customers such as DART in Dallas and Rail Runner in New Mexico, we are optimistic about entering other domestic markets heretofore unavailable to us. ATP and AirBoss combined for a DF installation with DART that began in March. Rail Runner construction will include our Tie Captive System mounted on Rocla concrete ties.” Magnuson continued: “We are completing tests for a second AirBoss/ATP venture, with the Long Island Rail Road being the recipient. ATP is supplying the cast plates for a DF installation that is being utilized for new construction and AirBoss is supplying the clips, insulators and pads.” Advanced Track Products “Required qualification testing has completed successfully and Trackmas- ter™ shipments have started for both the DART in Dallas and ACL (Long Island Rail Road) projects, said Bill Osler of Advanced Track Products. “Service conditions for these two projects are quite different. DART involves 14-ton axles and speeds of 6075 mph. ACL involves up-to-37-ton axles and speeds up to 80 mph. Installation of 60,000 DART TM’s and 30,000 ACL TMs will start this summer. These track fasteners were produced in our U.S. manufacturing facility.” Osler continued: “DART is the first transit system to specify captive rail clips, i.e., arrives at destination with clips an integral part of the bonded DF body. Advantages include ease and speed of installation and reduction of job-site loss when clips are a separate component. ATP is not the only one to supply a captive DF design. But importantly, we are the first and only one to supply a captive, bonded track fasPandrol VICTOR system with FASTCLIP fasteners on a bridge on an eastern freight railroad. Railway Track & Structures June 2008 45 http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - June 2008 Railway Track & Structures - June 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Grade Crossings Provide Interface Between Railroads, Public Grade-Crossing Equipment & Materials Guide Fastener Suppliers Getting a Grip Grinding Plays Part in Rail Maintenance Big Picture Products and Literature People Calendar Sales Representatives Website Directory Advertisers Index Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - June 2008 Railway Track & Structures - June 2008 - Railway Track & Structures - June 2008 (Page Cover1) Railway Track & Structures - June 2008 - Railway Track & Structures - June 2008 (Page Cover2) Railway Track & Structures - June 2008 - Contents (Page 1) Railway Track & Structures - June 2008 - Contents (Page 2) Railway Track & Structures - June 2008 - On Track (Page 3) Railway Track & Structures - June 2008 - On Track (Page 4) Railway Track & Structures - June 2008 - Industry Today (Page 5) Railway Track & Structures - June 2008 - Industry Today (Page 6) Railway Track & Structures - June 2008 - Supplier News (Page 7) Railway Track & Structures - June 2008 - Supplier News (Page 8) Railway Track & Structures - June 2008 - Supplier News (Page 9) Railway Track & Structures - June 2008 - AREMA News (Page 10) Railway Track & Structures - June 2008 - AREMA News (Page 11) Railway Track & Structures - June 2008 - AREMA News (Page 12) Railway Track & Structures - June 2008 - AREMA News (Page 13) Railway Track & Structures - June 2008 - AREMA News (Page 14) Railway Track & Structures - June 2008 - AREMA News (Page 15) Railway Track & Structures - June 2008 - AREMA News (Page 16) Railway Track & Structures - June 2008 - NRC News (Page 17) Railway Track & Structures - June 2008 - TTCI R&D (Page 18) Railway Track & Structures - June 2008 - TTCI R&D (Page 19) Railway Track & Structures - June 2008 - TTCI R&D (Page 20) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 21) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 22) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 23) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 24) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 25) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 26) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 27) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 28) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 29) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 30) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 31) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 32) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 33) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 34) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 35) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 36) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 37) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 38) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 39) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 40) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 41) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 42) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 43) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 44) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 45) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 46) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 47) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 48) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 49) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 50) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 51) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 52) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 53) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 54) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 55) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 56) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 57) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 58) Railway Track & Structures - June 2008 - People (Page 59) Railway Track & Structures - June 2008 - Sales Representatives (Page 60) Railway Track & Structures - June 2008 - Website Directory (Page 61) Railway Track & Structures - June 2008 - Advertisers Index (Page 62) Railway Track & Structures - June 2008 - Professional Directory (Page 63) Railway Track & Structures - June 2008 - Classified Advertising (Page 64) Railway Track & Structures - June 2008 - Classified Advertising (Page 65) Railway Track & Structures - June 2008 - Classified Advertising (Page 66) Railway Track & Structures - June 2008 - Classified Advertising (Page 67) Railway Track & Structures - June 2008 - Chicago Perspective (Page 68) Railway Track & Structures - June 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - June 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.