Railway Track & Structures - June 2008 - (Page 5) INDUSTRY TODAY UP back on track after major Oregon mudslide After 105 days and 19 million cubic feet of mud, Union Pacific completed the Herculean task of restoring all rail service through the Cascade Mountains in Oregon. The mudslide occurred on Jan. 19, 2008, eight miles southeast of Oakridge, Ore., and wiped out 3,000 feet of track in three different areas. Union Pacific employees and contractors worked around the clock to remove logs and unsuitable material from the site, and bring in rock to rebuild the mountain. “Our folks did an incredible job. They rolled up their sleeves and made the impossible, possible,” said Bill Van Trump, assistant vice president of engineering and maintenance for UP, who led the efforts at the site. “This was an extraordinary event which required an extraordinary effort. Not only did we put a mountain back together, we were also able to do it safely, without any injuries.” Crews worked on clean-up efforts until late this past month. A slide fence, which activates a warning if there is a subsequent slide, was constructed on the mountain. Until the fence is complete this month, the area will be continuously monitored to ensure the tracks are safe for rail traffic. By the numbers: 200: Number of workers at the site during the peak of construction. 150: Number of construction equipment at the site. 660,000 board feet of timber: Total volume of timber that was salvaged from the site – which is the property of the National Forestry Department. This is enough timber to build approximately 66 three-bedroom houses. 700,000 tons: Amount of rock it took to restabilize the mountain. One million tons: Amount of unsuitable material that was removed from the site, about the weight of 25 super carrier naval ships. Most of the slide was very fine silt that could not be used in rebuilding the mountain. 42-76 hours: The typical delay to customers due to the mudslide. 15: Number of daily trains that had to be rerouted via Bend, Ore., and Salt Lake City. 30: Daily average of the number of Union Pacific work train round trips that helped haul material in and out of the site. 1: Helicopter used to remove timber. 0: Number of available hotel rooms in Oakridge, Ore., during construction. Harriman Awards honor 12 railroads for safety records Last year was another strong year for safety on the nation's railroads, with records being set in two key safety measurements, while a third fell just shy of setting a record. “Over the years, the railroad industry has developed a strong safety culture,” said Edward R. Hamberger, president and ceo of the Association of American Railroads at the annual E.H. Harriman Awards luncheon that honors railroads with the best employee safety records for the previous year. “Last year, the train accident rate was the lowest in history. So was the grade-crossing accident rate. The total number of fatalities from all rail-related incidents was also the lowest in history. And the employee injury rate was the second lowest in history, missing the record set in 2006 by less than one percent.” Norfolk Southern was awarded top, gold honors for the 19th year in a row in Group A, which is comprised of linehaul railroads whose employees worked 15 million employee-hours or more during 2007. Other Group A recipients included CSX Transportation (silver) and Union Pacific (bronze). In Group B (line-haul railroads www.rtands.com Railway Track & Structures June 2008 5 http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - June 2008 Railway Track & Structures - June 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Grade Crossings Provide Interface Between Railroads, Public Grade-Crossing Equipment & Materials Guide Fastener Suppliers Getting a Grip Grinding Plays Part in Rail Maintenance Big Picture Products and Literature People Calendar Sales Representatives Website Directory Advertisers Index Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - June 2008 Railway Track & Structures - June 2008 - Railway Track & Structures - June 2008 (Page Cover1) Railway Track & Structures - June 2008 - Railway Track & Structures - June 2008 (Page Cover2) Railway Track & Structures - June 2008 - Contents (Page 1) Railway Track & Structures - June 2008 - Contents (Page 2) Railway Track & Structures - June 2008 - On Track (Page 3) Railway Track & Structures - June 2008 - On Track (Page 4) Railway Track & Structures - June 2008 - Industry Today (Page 5) Railway Track & Structures - June 2008 - Industry Today (Page 6) Railway Track & Structures - June 2008 - Supplier News (Page 7) Railway Track & Structures - June 2008 - Supplier News (Page 8) Railway Track & Structures - June 2008 - Supplier News (Page 9) Railway Track & Structures - June 2008 - AREMA News (Page 10) Railway Track & Structures - June 2008 - AREMA News (Page 11) Railway Track & Structures - June 2008 - AREMA News (Page 12) Railway Track & Structures - June 2008 - AREMA News (Page 13) Railway Track & Structures - June 2008 - AREMA News (Page 14) Railway Track & Structures - June 2008 - AREMA News (Page 15) Railway Track & Structures - June 2008 - AREMA News (Page 16) Railway Track & Structures - June 2008 - NRC News (Page 17) Railway Track & Structures - June 2008 - TTCI R&D (Page 18) Railway Track & Structures - June 2008 - TTCI R&D (Page 19) Railway Track & Structures - June 2008 - TTCI R&D (Page 20) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 21) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 22) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 23) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 24) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 25) Railway Track & Structures - June 2008 - Grade Crossings Provide Interface Between Railroads, Public (Page 26) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 27) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 28) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 29) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 30) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 31) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 32) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 33) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 34) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 35) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 36) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 37) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 38) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 39) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 40) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 41) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 42) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 43) Railway Track & Structures - June 2008 - Grade-Crossing Equipment & Materials Guide (Page 44) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 45) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 46) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 47) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 48) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 49) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 50) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 51) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 52) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 53) Railway Track & Structures - June 2008 - Fastener Suppliers Getting a Grip (Page 54) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 55) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 56) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 57) Railway Track & Structures - June 2008 - Grinding Plays Part in Rail Maintenance Big Picture (Page 58) Railway Track & Structures - June 2008 - People (Page 59) Railway Track & Structures - June 2008 - Sales Representatives (Page 60) Railway Track & Structures - June 2008 - Website Directory (Page 61) Railway Track & Structures - June 2008 - Advertisers Index (Page 62) Railway Track & Structures - June 2008 - Professional Directory (Page 63) Railway Track & Structures - June 2008 - Classified Advertising (Page 64) Railway Track & Structures - June 2008 - Classified Advertising (Page 65) Railway Track & Structures - June 2008 - Classified Advertising (Page 66) Railway Track & Structures - June 2008 - Classified Advertising (Page 67) Railway Track & Structures - June 2008 - Chicago Perspective (Page 68) Railway Track & Structures - June 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - June 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.