Railway Track & Structures - July 2008 - (Page 45) NEW & USED EQUIPMENT Railroad Ready Trucks Available For Sale Or Lease Call Today For Your Custom Build Needs See Our Ad On Page 7 Of This Issue Fleet Body Equipment - Call Toll Free 877-323-7278 Rentals Leasing Sales Pre-Emission M/W Equipment Sale/Rent 1999 Mark IV Tamper, 2003 System V, V4.10, Surface fit, Smart I/O CALL! 1997 Mark IV Tamper, 2003 System V, V4.10, Surface fit, Smart I/O CALL! 1995 Mark IV Tamper, 2007 System V, V4.10, Surface fit, Smart I/O CALL! (4) 1993 Mark IV Tampers, System V, 4.10, Smart I/O, Surface fit, Laser CALL! Remanufactured Mark III ECTR-130G Tamper, four wheel drive, combo clamp CALL! (7) 1996 - 1983 Mark III, ECTR-130G Tampers, combo clamp, 4 wheel drive, AC CALL! (2) STM-XLC Switch Tamper w/surfacing & lining capability! CALL! (2) STM Switch Tampers, no jacks. Enclosed cabs. Nice machines! CALL! (16) Fairmont Tamper Mark I,II, ES, ES-TDAG`, EA, EAS, JRM Tampers available! CALL! (5) Harsco TR-10/TR-1’s Tie Remover/Inserters, 1998,1996,1993 Models & Older CALL! NORDCO 2008 Factory Remanufactured Auto-Lift Automatic Rail Lifter CALL! Knox Kershaw KBR-900 Ballast Regulator, Detroit 4-53T, AC CALL! (3) Kershaw / RTW Tie Cranes & Bridge Cranes. Some w/enclosed cabs & AC CALL! Racine Dual Anchor Spreaders and Dual Anchor Adjusters CALL! (5) Teleweld Rail Heaters w/vibrators, self propelled CALL! 2007 Sterling LT9513 with Rotobec loader and DMF Hi Rail gear The Hi-Rail Specialists V&H 14' Roto-Dump Mounted on a 2007 Sterling LT9513 Axle Chassis ■ 20,000 Front Axle ■ 40,000 & 46,000 Rear Axle ■ Mercedes Engine 410 HP ■ Fuller Transmission RTO--14908 LL V&H has a large selection of single and tandem flatbeds, boom trucks and more, with and without railgear. Check our inventory at www.vhtrucks.com We offer: ■ Financing or leasing ■ Nationwide Warranty on the complete package. V&H, THE DRIVING FORCE IN HEAVY TRUCKS AND EQUIPMENT. Lots more Equipment & Parts! Check out our website, e-mail or call for more details! (All of the above equipment is located in Illinois.) JER OVERHAUL INC./NEWMAN MACHINERY WEBSITE: www.newmanmachiner y.com E-MAIL: mofwman@cox.net SALES & RENTAL Tel# (602) 952-0035 • Fax# (602) 952-6026 PARTS & SERVICE: Tel# (217) 268-4823 • Fax# (217) 268-4813 (A NORDCO COMPANY) Call today for the Sales Representative in your area. For rental information ask for Dean Olson V&H Trucks 800-826-2308 1505 S. Central Ave. • Marshfield, WI 54449 www.vhtrucks.com A Fleet of Hirail Vehicles Ready to Go Pickup Rotary Dump Grapple Truck Hirail Gradall w/opt. Brush Cutter Crew Cab Boom Truck ■ Hirail Trucks ■ Rotary Dumps ■ Boom Dumps ■ Gapple Trucks w/mags. & remote control. ■ Flats, Vans, Crew Cabs ■ Hirail Gradall w/opt. brush cutter ■ Ballast Regs. ■ Hytracker, Stone Cars, Pettibone ■ DMF & Fairmont parts, service, installation Phone: 315-455-0100 • Fax: 315-455-6008 • Syracuse, NY • Please visit our website www.franktartaglia.com Find your rail industry job opportunities at www.rtands.com & www.railwayage.com www.rtands.com Railway Track & Structures June 2008 45 http://www.vhtrucks.com http://www.franktartaglia.com http://www.rtands.com http://www.railwayage.com http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - July 2008 Railway Track & Structures - July 2008 On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Products and Literature People Calendar Sales Representatives Website Directory Advertisers Index Professional Directory Classified Advertising Chicago Perspective Extending Service Life for Costly Special Trackwork Rail Welding Gets Act Together Premium Fasteners, Rail Steels Help Meet Strain of Heavy Haul Railway Track & Structures - July 2008 Railway Track & Structures - July 2008 - Railway Track & Structures - July 2008 (Page Cover1) Railway Track & Structures - July 2008 - Railway Track & Structures - July 2008 (Page Cover2) Railway Track & Structures - July 2008 - Railway Track & Structures - July 2008 (Page 1) Railway Track & Structures - July 2008 - Railway Track & Structures - July 2008 (Page 2) Railway Track & Structures - July 2008 - On Track (Page 3) Railway Track & Structures - July 2008 - On Track (Page 4) Railway Track & Structures - July 2008 - Industry Today (Page 5) Railway Track & Structures - July 2008 - Industry Today (Page 6) Railway Track & Structures - July 2008 - Supplier News (Page 7) Railway Track & Structures - July 2008 - Supplier News (Page 8) Railway Track & Structures - July 2008 - AREMA News (Page 9) Railway Track & Structures - July 2008 - AREMA News (Page 10) Railway Track & Structures - July 2008 - AREMA News (Page 11) Railway Track & Structures - July 2008 - AREMA News (Page 12) Railway Track & Structures - July 2008 - AREMA News (Page 13) Railway Track & Structures - July 2008 - AREMA News (Page 14) Railway Track & Structures - July 2008 - AREMA News (Page 15) Railway Track & Structures - July 2008 - NRC News (Page 16) Railway Track & Structures - July 2008 - TTCI R&D (Page 17) Railway Track & Structures - July 2008 - TTCI R&D (Page 18) Railway Track & Structures - July 2008 - TTCI R&D (Page 19) Railway Track & Structures - July 2008 - TTCI R&D (Page 20) Railway Track & Structures - July 2008 - Extending Service Life for Costly Special Trackwork (Page 21) Railway Track & Structures - July 2008 - Extending Service Life for Costly Special Trackwork (Page 22) Railway Track & Structures - July 2008 - Extending Service Life for Costly Special Trackwork (Page 23) Railway Track & Structures - July 2008 - Extending Service Life for Costly Special Trackwork (Page 24) Railway Track & Structures - July 2008 - Extending Service Life for Costly Special Trackwork (Page 25) Railway Track & Structures - July 2008 - Extending Service Life for Costly Special Trackwork (Page 26) Railway Track & Structures - July 2008 - Extending Service Life for Costly Special Trackwork (Page 27) Railway Track & Structures - July 2008 - Extending Service Life for Costly Special Trackwork (Page 28) Railway Track & Structures - July 2008 - Extending Service Life for Costly Special Trackwork (Page 29) Railway Track & Structures - July 2008 - Rail Welding Gets Act Together (Page 30) Railway Track & Structures - July 2008 - Rail Welding Gets Act Together (Page 31) Railway Track & Structures - July 2008 - Rail Welding Gets Act Together (Page 32) Railway Track & Structures - July 2008 - Rail Welding Gets Act Together (Page 33) Railway Track & Structures - July 2008 - Premium Fasteners, Rail Steels Help Meet Strain of Heavy Haul (Page 34) Railway Track & Structures - July 2008 - Premium Fasteners, Rail Steels Help Meet Strain of Heavy Haul (Page 35) Railway Track & Structures - July 2008 - Premium Fasteners, Rail Steels Help Meet Strain of Heavy Haul (Page 36) Railway Track & Structures - July 2008 - Premium Fasteners, Rail Steels Help Meet Strain of Heavy Haul (Page 37) Railway Track & Structures - July 2008 - Products and Literature (Page 38) Railway Track & Structures - July 2008 - People (Page 39) Railway Track & Structures - July 2008 - Sales Representatives (Page 40) Railway Track & Structures - July 2008 - Website Directory (Page 41) Railway Track & Structures - July 2008 - Advertisers Index (Page 42) Railway Track & Structures - July 2008 - Professional Directory (Page 43) Railway Track & Structures - July 2008 - Classified Advertising (Page 44) Railway Track & Structures - July 2008 - Classified Advertising (Page 45) Railway Track & Structures - July 2008 - Classified Advertising (Page 46) Railway Track & Structures - July 2008 - Classified Advertising (Page 47) Railway Track & Structures - July 2008 - Chicago Perspective (Page 48) Railway Track & Structures - July 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - July 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.