Railway Track & Structures - August 2008 - (Page 21) Choosing the best Photo courtesy Loram Maintenance of Way, Inc. m/w machinery Productivity and reliability are still high priorities for m/w machinery, according to chief engineers, but safety of both operating and maintenance personnel is still the Number One requirement. by Tom Judge, editor T he times they are a changin’, and engineering departments have to be able to deal with the changes, whether they are budgetary, technological or personnel. Even with all the new technologies being adopted, railroaders still want the basics, including safety, efficiency, reliability and productivity. Our annual survey lists more details on exactly what chief engineers want in m/w machinery. Main factors 2008 What features do you look for when in the market for m/w machinery? For example, is it safety, reliability, speed of operation, ease of getting on and off 1. track, ease of maintenance, cost, productivity or something else? “Once a determination is made to procure equipment based on our program requirements, the key drivers for machinery selection are as follows: Operator safety and ergonomic features, reliability, cycle time of equipment, on/off track capabilities, maintenance, life-cycle costs, reliability and fleet commonality,” said Steven Falkenstein, deputy chief engineer maintenance for Amtrak. “As to operator safety and ergonomic features offered by manufacturers or re-engineered upgrades, i.e., operator access, visibility, vibration and noise isolation, our specifications and pre-delivery inspections ensure these requirements are met. “With regard to speed of operation as work windows shrink, cycle times for surfacing and tie equipment should be maximized. Cycle times for set up include on/off track,” Falkenstein noted. “Life-cycle costs and fleet commonality also play a role in our selection process. Fleet commonality eases training requirements for operators and mechanics and also reduces repair parts inventory costs.” “The features that we continually look for are safe work environments for the operator and maintenance personnel,” said John Upward, general director roadway equipment for BNSF. “Reliability is also very important to us as equipment down time is a wasted opportunity. This is very costly in www.rtands.com Railway Track & Structures August 2008 21 http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - August 2008 Railway Track & Structures - August 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Wish List: What Chief Engineers Really Want in M/W Machinery Keeping Ballast in Shape Amtrak Turns to Sophisticated System to Manage NEC Assets Supplier Profiles Products and Literature People Calendar Sales Representatives Website Directory Advertisers Index Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - August 2008 Railway Track & Structures - August 2008 - Railway Track & Structures - August 2008 (Page Cover1) Railway Track & Structures - August 2008 - Railway Track & Structures - August 2008 (Page Cover2) Railway Track & Structures - August 2008 - Contents (Page 1) Railway Track & Structures - August 2008 - Contents (Page 2) Railway Track & Structures - August 2008 - On Track (Page 3) Railway Track & Structures - August 2008 - On Track (Page 4) Railway Track & Structures - August 2008 - Industry Today (Page 5) Railway Track & Structures - August 2008 - Industry Today (Page 6) Railway Track & Structures - August 2008 - Supplier News (Page 7) Railway Track & Structures - August 2008 - Supplier News (Page 8) Railway Track & Structures - August 2008 - AREMA News (Page 9) Railway Track & Structures - August 2008 - AREMA News (Page 10) Railway Track & Structures - August 2008 - AREMA News (Page 11) Railway Track & Structures - August 2008 - AREMA News (Page 12) Railway Track & Structures - August 2008 - AREMA News (Page 13) Railway Track & Structures - August 2008 - AREMA News (Page 14) Railway Track & Structures - August 2008 - AREMA News (Page 15) Railway Track & Structures - August 2008 - NRC News (Page 16) Railway Track & Structures - August 2008 - TTCI R&D (Page 17) Railway Track & Structures - August 2008 - TTCI R&D (Page 18) Railway Track & Structures - August 2008 - TTCI R&D (Page 19) Railway Track & Structures - August 2008 - TTCI R&D (Page 20) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 21) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 22) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 23) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 24) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 25) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 26) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 27) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 28) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 29) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 30) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 31) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 32) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 33) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 34) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 35) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 36) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 37) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 38) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 39) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 40) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 41) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 42) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 43) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 44) Railway Track & Structures - August 2008 - Supplier Profiles (Page 45) Railway Track & Structures - August 2008 - Products and Literature (Page 46) Railway Track & Structures - August 2008 - People (Page 47) Railway Track & Structures - August 2008 - Sales Representatives (Page 48) Railway Track & Structures - August 2008 - Website Directory (Page 49) Railway Track & Structures - August 2008 - Advertisers Index (Page 50) Railway Track & Structures - August 2008 - Professional Directory (Page 51) Railway Track & Structures - August 2008 - Classified Advertising (Page 52) Railway Track & Structures - August 2008 - Classified Advertising (Page 53) Railway Track & Structures - August 2008 - Classified Advertising (Page 54) Railway Track & Structures - August 2008 - Classified Advertising (Page 55) Railway Track & Structures - August 2008 - Chicago Perspective (Page 56) Railway Track & Structures - August 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - August 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.