Railway Track & Structures - August 2008 - (Page 22) Choosing the best m/w machinery not just one or two years after the initial sale. Going forward, the manufacturer will need to evaluate how they see the customer and how they respond. If not, they may find themselves wondering where the orders went. “Clearly all the examples given are important,” Robey said. “Safety of operation is always the most-important feature. Without safety, there will not be a purchase. Reliability is the next priority. Speed without reliability is like the tortoise and the hare. Reliability is heavily correlated to customer service. Customer service is built on technical support, parts availability and flexibility in working with the customer.” “Ease of operation, especially if it’s safe to operate economically,” said Richard Keller, chief engineer for Montana Rail Link. “It shouldn’t cost a fortune and it must be able to do the work it is supposed to do.” “The primary features evaluated are safety, productivity and reliability,” said Tim Drake, vice president-engineering, Norfolk Southern. “We also consider terms of network velocity, as well as overall unit cost. We are continually looking at all of our maintenance work processes and trying to become more efficient in all that we do so when we look for a new piece of equipment we are looking to reduce our overall unit cost, as well as reducing track-occupancy requirements.” “All of these, including ease of training and ergonomic design for optimal operator satisfaction,” said Vernon Graham, vice president engineering for Canadian Pacific Railway. “Customer Service!,” said Donald Robey, assistant chief engineer - work equipment for CSX Transportation. “It is obvious that you want the machine to do the task for which it was purchased and you want it to be safe, reliable and cost effective. However, as we go forward, we need manufacturers who are going to be sensitive to what the customer wants, listen to the customer and respond accordingly when things are wrong or not performing. The support needs to be for the life of the machine, 22 Railway Track & Structures August 2008 www.rtands.com http://www.loram.com http://www.loram.com http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - August 2008 Railway Track & Structures - August 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Wish List: What Chief Engineers Really Want in M/W Machinery Keeping Ballast in Shape Amtrak Turns to Sophisticated System to Manage NEC Assets Supplier Profiles Products and Literature People Calendar Sales Representatives Website Directory Advertisers Index Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - August 2008 Railway Track & Structures - August 2008 - Railway Track & Structures - August 2008 (Page Cover1) Railway Track & Structures - August 2008 - Railway Track & Structures - August 2008 (Page Cover2) Railway Track & Structures - August 2008 - Contents (Page 1) Railway Track & Structures - August 2008 - Contents (Page 2) Railway Track & Structures - August 2008 - On Track (Page 3) Railway Track & Structures - August 2008 - On Track (Page 4) Railway Track & Structures - August 2008 - Industry Today (Page 5) Railway Track & Structures - August 2008 - Industry Today (Page 6) Railway Track & Structures - August 2008 - Supplier News (Page 7) Railway Track & Structures - August 2008 - Supplier News (Page 8) Railway Track & Structures - August 2008 - AREMA News (Page 9) Railway Track & Structures - August 2008 - AREMA News (Page 10) Railway Track & Structures - August 2008 - AREMA News (Page 11) Railway Track & Structures - August 2008 - AREMA News (Page 12) Railway Track & Structures - August 2008 - AREMA News (Page 13) Railway Track & Structures - August 2008 - AREMA News (Page 14) Railway Track & Structures - August 2008 - AREMA News (Page 15) Railway Track & Structures - August 2008 - NRC News (Page 16) Railway Track & Structures - August 2008 - TTCI R&D (Page 17) Railway Track & Structures - August 2008 - TTCI R&D (Page 18) Railway Track & Structures - August 2008 - TTCI R&D (Page 19) Railway Track & Structures - August 2008 - TTCI R&D (Page 20) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 21) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 22) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 23) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 24) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 25) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 26) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 27) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 28) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 29) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 30) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 31) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 32) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 33) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 34) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 35) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 36) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 37) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 38) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 39) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 40) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 41) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 42) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 43) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 44) Railway Track & Structures - August 2008 - Supplier Profiles (Page 45) Railway Track & Structures - August 2008 - Products and Literature (Page 46) Railway Track & Structures - August 2008 - People (Page 47) Railway Track & Structures - August 2008 - Sales Representatives (Page 48) Railway Track & Structures - August 2008 - Website Directory (Page 49) Railway Track & Structures - August 2008 - Advertisers Index (Page 50) Railway Track & Structures - August 2008 - Professional Directory (Page 51) Railway Track & Structures - August 2008 - Classified Advertising (Page 52) Railway Track & Structures - August 2008 - Classified Advertising (Page 53) Railway Track & Structures - August 2008 - Classified Advertising (Page 54) Railway Track & Structures - August 2008 - Classified Advertising (Page 55) Railway Track & Structures - August 2008 - Chicago Perspective (Page 56) Railway Track & Structures - August 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - August 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.