Railway Track & Structures - August 2008 - (Page 43) 2005, with Amtrak spending just over three years in preparing and deploying the system and customizing it. Engineering recognized the need for software to supply the full-system approach. Amtrak started reviewing six or seven software companies, then narrowed the list down to three and gave them some assignments to see how they would accommodate the railroad’s linear environment. That took about six months, then there was approximately a year on overall design. Actual implementation started in 2006, with labor reporting. In 2007, EAM began track inspection compliance, then started with c&s. “We completed track inspection compliance at the beginning of 2008, and we’re now implementing the advanced track compliance, which would be a paperless and full capture of measurements in the next phase,” Ebersohn said. “Within Amtrak engineering, the organization was willing to let us do basics first, to build a structured approach,” Broughton said. “We knew the urgency, we were aware that information management was very important, but we wanted to make sure that the quality is there in everything we do and everything we deliver. “As an example, when we talked about inspection compliance, the FRA mandates how our track department and our c&s department do their work,” he noted. “C&S and track are heavily regulated by the FRA. And Amtrak has internal regulations that are even more strict than those of the FRA at times. We wanted to make sure that we were doing enforcing and distributing information that would make those inspections and tests successful. Basic, advanced implementation “We broke our implementation into basic and advanced,” Broughton said. “During the basic implementation, we did a full survey of assets and we built structured job plans that detailed all of the actions that were to take place. We built a responsibility matrix so we would know who’s responsible for performance and review and we implemented that throughout the corridor. “What we did not do during the basic phase was capture the actual measurements,” he explained. “That is the next phase, where we go full paperless on inspection compliance for track. We’re developing this right now where we will start leveraging the measurements themselves and evaluating the conditions based on those measurements.” Broughton added: “Throughout the corridor, all track inspectors are using the system. We’re currently implementing the system for c&s. We’re finished c&s work in Washington and in Baltimore now and our hope is that very quickly we can deploy the EAM for c&s throughout the corridor. We have started deploying track compliance in the central division and timekeeping management is also being deployed in the central division.” Amtrak is sharing its experience with its EAM system with other railroads, including BNSF, CSX Transportation and Union Pacific. www.rtands.com Railway Track & Structures August 2008 43 http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - August 2008 Railway Track & Structures - August 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Wish List: What Chief Engineers Really Want in M/W Machinery Keeping Ballast in Shape Amtrak Turns to Sophisticated System to Manage NEC Assets Supplier Profiles Products and Literature People Calendar Sales Representatives Website Directory Advertisers Index Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - August 2008 Railway Track & Structures - August 2008 - Railway Track & Structures - August 2008 (Page Cover1) Railway Track & Structures - August 2008 - Railway Track & Structures - August 2008 (Page Cover2) Railway Track & Structures - August 2008 - Contents (Page 1) Railway Track & Structures - August 2008 - Contents (Page 2) Railway Track & Structures - August 2008 - On Track (Page 3) Railway Track & Structures - August 2008 - On Track (Page 4) Railway Track & Structures - August 2008 - Industry Today (Page 5) Railway Track & Structures - August 2008 - Industry Today (Page 6) Railway Track & Structures - August 2008 - Supplier News (Page 7) Railway Track & Structures - August 2008 - Supplier News (Page 8) Railway Track & Structures - August 2008 - AREMA News (Page 9) Railway Track & Structures - August 2008 - AREMA News (Page 10) Railway Track & Structures - August 2008 - AREMA News (Page 11) Railway Track & Structures - August 2008 - AREMA News (Page 12) Railway Track & Structures - August 2008 - AREMA News (Page 13) Railway Track & Structures - August 2008 - AREMA News (Page 14) Railway Track & Structures - August 2008 - AREMA News (Page 15) Railway Track & Structures - August 2008 - NRC News (Page 16) Railway Track & Structures - August 2008 - TTCI R&D (Page 17) Railway Track & Structures - August 2008 - TTCI R&D (Page 18) Railway Track & Structures - August 2008 - TTCI R&D (Page 19) Railway Track & Structures - August 2008 - TTCI R&D (Page 20) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 21) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 22) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 23) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 24) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 25) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 26) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 27) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 28) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 29) Railway Track & Structures - August 2008 - Wish List: What Chief Engineers Really Want in M/W Machinery (Page 30) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 31) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 32) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 33) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 34) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 35) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 36) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 37) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 38) Railway Track & Structures - August 2008 - Keeping Ballast in Shape (Page 39) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 40) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 41) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 42) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 43) Railway Track & Structures - August 2008 - Amtrak Turns to Sophisticated System to Manage NEC Assets (Page 44) Railway Track & Structures - August 2008 - Supplier Profiles (Page 45) Railway Track & Structures - August 2008 - Products and Literature (Page 46) Railway Track & Structures - August 2008 - People (Page 47) Railway Track & Structures - August 2008 - Sales Representatives (Page 48) Railway Track & Structures - August 2008 - Website Directory (Page 49) Railway Track & Structures - August 2008 - Advertisers Index (Page 50) Railway Track & Structures - August 2008 - Professional Directory (Page 51) Railway Track & Structures - August 2008 - Classified Advertising (Page 52) Railway Track & Structures - August 2008 - Classified Advertising (Page 53) Railway Track & Structures - August 2008 - Classified Advertising (Page 54) Railway Track & Structures - August 2008 - Classified Advertising (Page 55) Railway Track & Structures - August 2008 - Chicago Perspective (Page 56) Railway Track & Structures - August 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - August 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.