Railway Track & Structures - September 2008 - (Page 10) I N D U S T R Y T O D AY which includes a second rail line through the Dallas Central Business District with revenue service scheduled for 2014. A Blue Line extension from Ledbetter Station to UNT-Dallas is scheduled to open in 2018. CTA opens new Brown Line Diversey stationhouse CTA President Ron Huberman was joined by elected officials to commemorate the opening of the newlyrenovated Diversey Brown Line stationhouse. The new stationhouse, which replaces the facility that opened for service on the Brown Line in 1900, is located on the south side of the street, across from the former entrance. The Diversey station, the 11th station out of 18 renovated as part of the Brown Line Capacity Expansion project, is newly accessible with the addition of elevators. With the opening of the new Diversey stationhouse, 84 out of 144 CTA rail stations are now accessible. The Diversey station closed for construction last summer. In March, CTA opened a temporary station at Diversey, three months prior to the originally scheduled opening date. Work to lengthen the platforms had been completed and allowed the agency to operate eight-car trains along the Brown Line for the first time, helping to ease congestion on the Brown Line during three-track operations. The introduction of eight-car service occurred nearly 18 months earlier than originally planned. Additional improvements include accessible turnstiles, brighter lighting, new signage–including Braille signs–and a bike rack. Construction crews will continue to work in the weeks ahead to remove the temporary station and install additional bike racks, original artwork and landscaping. CTA partnered with the City of Chicago's Department of Cultural Affairs to install public art at the 18 stations included in the Brown Line project. The Diversey station will feature a large-scale outdoor sculpture entitled Arriving Home, created by sculptor Dennis Oppenheim that will be installed later this year adjacent to the north auxiliary exit. The 10-foothigh sculpture, made of steel and polycarbonate and acrylic materials, is in the shape of a torqued spiral that 10 Railway Track & Structures September 2008 www.rtands.com http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - September 2008 Railway Track & Structures - September 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Larry Etherton Rounds Out Successful Term as President of AREMA Remote Bridges Present Challenges New Mexico Rail Runner Express Making Tracks for Santa Fe Products and Literature People Calendar Sales Representatives Advertisers Index Website Directory Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - September 2008 Railway Track & Structures - September 2008 - Railway Track & Structures - September 2008 (Page Cover1) Railway Track & Structures - September 2008 - Railway Track & Structures - September 2008 (Page Cover2) Railway Track & Structures - September 2008 - Contents (Page 1) Railway Track & Structures - September 2008 - Contents (Page 2) Railway Track & Structures - September 2008 - Contents (Page 3) Railway Track & Structures - September 2008 - Contents (Page 4) Railway Track & Structures - September 2008 - Industry Today (Page 5) Railway Track & Structures - September 2008 - Industry Today (Page 6) Railway Track & Structures - September 2008 - Supplier News (Page 7) Railway Track & Structures - September 2008 - Supplier News (Page 8) Railway Track & Structures - September 2008 - Supplier News (Page 9) Railway Track & Structures - September 2008 - Supplier News (Page 10) Railway Track & Structures - September 2008 - Supplier News (Page 11) Railway Track & Structures - September 2008 - Supplier News (Page 12) Railway Track & Structures - September 2008 - Supplier News (Page 13) Railway Track & Structures - September 2008 - Supplier News (Page 14) Railway Track & Structures - September 2008 - AREMA News (Page 15) Railway Track & Structures - September 2008 - AREMA News (Page 16) Railway Track & Structures - September 2008 - AREMA News (Page 17) Railway Track & Structures - September 2008 - AREMA News (Page 18) Railway Track & Structures - September 2008 - AREMA News (Page 19) Railway Track & Structures - September 2008 - AREMA News (Page 20) Railway Track & Structures - September 2008 - AREMA News (Page 21) Railway Track & Structures - September 2008 - AREMA News (Page 22) Railway Track & Structures - September 2008 - AREMA News (Page 23) Railway Track & Structures - September 2008 - AREMA News (Page 24) Railway Track & Structures - September 2008 - AREMA News (Page 25) Railway Track & Structures - September 2008 - AREMA News (Page 26) Railway Track & Structures - September 2008 - AREMA News (Page 27) Railway Track & Structures - September 2008 - AREMA News (Page 28) Railway Track & Structures - September 2008 - AREMA News (Page 29) Railway Track & Structures - September 2008 - AREMA News (Page 30) Railway Track & Structures - September 2008 - AREMA News (Page 31) Railway Track & Structures - September 2008 - AREMA News (Page 32) Railway Track & Structures - September 2008 - NRC News (Page 33) Railway Track & Structures - September 2008 - NRC News (Page 34) Railway Track & Structures - September 2008 - NRC News (Page 35) Railway Track & Structures - September 2008 - NRC News (Page 36) Railway Track & Structures - September 2008 - TTCI R&D (Page 37) Railway Track & Structures - September 2008 - TTCI R&D (Page 38) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 39) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 40) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 41) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 42) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 43) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 44) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 45) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 46) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 47) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 48) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 49) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 50) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 51) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 52) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 53) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 54) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 55) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 56) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 57) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 58) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 59) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 60) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 61) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 62) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 63) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 64) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 65) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 66) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 67) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 68) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 69) Railway Track & Structures - September 2008 - People (Page 70) Railway Track & Structures - September 2008 - People (Page 71) Railway Track & Structures - September 2008 - People (Page 72) Railway Track & Structures - September 2008 - Sales Representatives (Page 73) Railway Track & Structures - September 2008 - Advertisers Index (Page 74) Railway Track & Structures - September 2008 - Advertisers Index (Page 75) Railway Track & Structures - September 2008 - Professional Directory (Page 76) Railway Track & Structures - September 2008 - Classified Advertising (Page 77) Railway Track & Structures - September 2008 - Classified Advertising (Page 78) Railway Track & Structures - September 2008 - Classified Advertising (Page 79) Railway Track & Structures - September 2008 - Chicago Perspective (Page 80) Railway Track & Structures - September 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - September 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.