Railway Track & Structures - September 2008 - (Page 37) Results insulator performance After approximately 20 mgt of traffic, the site was re-inspected and measured. Inspection indicated more than 40 percent of field side of insulator type A was cracked or missing. These were subsequently removed from test. Additional inspections on the remaining insulators were conducted after 55 mgt and 85 mgt after installation. At the 85-mgt inspection, about 10 percent of the field side insulator type B sites were noted to be cracked. The remaining insulators (control, C and D) were functioning without cracks. shown only for the initial and 20 mgt inspections, as these were removed after 21 mgt. Test insulators C, CLR and D, as well as the control insulator on the TOR zone, X, are performing in a similar fashion. The stiffness appeared to increase between the “as installed” and first cyclic measurement at 20 mgt. After 20 mgt, the trend is for slightly wider base gauge under load for all materials. Segment G shows a significant increase in lateral displacement under load after 80 mgt. formance. This may simply be an increase to the currently specified repeated load values shown on AREMA Chapter 30. Aknowledgements This evaluation was conducted with cooperative participation from Ed Kohake and Rusty Belmore of the Union Pacific Railroad and Pandrol USA and Leading Edge, who provided materials and technical assistance during installation of the products. Future work TTCI will conduct at least one additional set of field measurements to determine long-term performance of the remaining products, as well as collect samples for post-test laboratory evaluation. Other data, such as static gauge, clip hold down force, and maintenance/repair issues will be summarized in a final report. A number of new and unused samples of each material will also be evaluated in laboratory tests to determine if a more severe screening procedure (than currently shown in AREMA recommendations) will differentiate or predict observed field per- References: 1. Davis, David D. and Steve M. Chrismer. April 1990. “Tie Performance—A Progress Report of the Des Plaines Test Site.” Research Report R746, Association of American Railroads, Transportation Technology Center, Inc. Pueblo, Colo. 2. Davis, D.D., K.J. Laine and A.B. Hazell. June 1994. “The Performance at Des Plaines: 1992 Inspection and Gage Widening Tests.” Research Report R870, Association of American Railroads, Transportation Technology Center, Inc. Pueblo, Colo. Results gauge strength Figure 4 summarizes LTLF maximum lateral deflection on the base of the low rail for each zone. Note that insulator C was equipped with both standard, C, and long reach, CLR, clips. G and X are the control segments, with X indicating the control site in the TOR zone. Data for 0 mgt were collected one day after clips/insulators were installed to allow train traffic to seat components and eliminate excessive free play. Note that data for insulator A are www.rtands.com Railway Track & Structures September 2008 37 http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - September 2008 Railway Track & Structures - September 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Larry Etherton Rounds Out Successful Term as President of AREMA Remote Bridges Present Challenges New Mexico Rail Runner Express Making Tracks for Santa Fe Products and Literature People Calendar Sales Representatives Advertisers Index Website Directory Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - September 2008 Railway Track & Structures - September 2008 - Railway Track & Structures - September 2008 (Page Cover1) Railway Track & Structures - September 2008 - Railway Track & Structures - September 2008 (Page Cover2) Railway Track & Structures - September 2008 - Contents (Page 1) Railway Track & Structures - September 2008 - Contents (Page 2) Railway Track & Structures - September 2008 - Contents (Page 3) Railway Track & Structures - September 2008 - Contents (Page 4) Railway Track & Structures - September 2008 - Industry Today (Page 5) Railway Track & Structures - September 2008 - Industry Today (Page 6) Railway Track & Structures - September 2008 - Supplier News (Page 7) Railway Track & Structures - September 2008 - Supplier News (Page 8) Railway Track & Structures - September 2008 - Supplier News (Page 9) Railway Track & Structures - September 2008 - Supplier News (Page 10) Railway Track & Structures - September 2008 - Supplier News (Page 11) Railway Track & Structures - September 2008 - Supplier News (Page 12) Railway Track & Structures - September 2008 - Supplier News (Page 13) Railway Track & Structures - September 2008 - Supplier News (Page 14) Railway Track & Structures - September 2008 - AREMA News (Page 15) Railway Track & Structures - September 2008 - AREMA News (Page 16) Railway Track & Structures - September 2008 - AREMA News (Page 17) Railway Track & Structures - September 2008 - AREMA News (Page 18) Railway Track & Structures - September 2008 - AREMA News (Page 19) Railway Track & Structures - September 2008 - AREMA News (Page 20) Railway Track & Structures - September 2008 - AREMA News (Page 21) Railway Track & Structures - September 2008 - AREMA News (Page 22) Railway Track & Structures - September 2008 - AREMA News (Page 23) Railway Track & Structures - September 2008 - AREMA News (Page 24) Railway Track & Structures - September 2008 - AREMA News (Page 25) Railway Track & Structures - September 2008 - AREMA News (Page 26) Railway Track & Structures - September 2008 - AREMA News (Page 27) Railway Track & Structures - September 2008 - AREMA News (Page 28) Railway Track & Structures - September 2008 - AREMA News (Page 29) Railway Track & Structures - September 2008 - AREMA News (Page 30) Railway Track & Structures - September 2008 - AREMA News (Page 31) Railway Track & Structures - September 2008 - AREMA News (Page 32) Railway Track & Structures - September 2008 - NRC News (Page 33) Railway Track & Structures - September 2008 - NRC News (Page 34) Railway Track & Structures - September 2008 - NRC News (Page 35) Railway Track & Structures - September 2008 - NRC News (Page 36) Railway Track & Structures - September 2008 - TTCI R&D (Page 37) Railway Track & Structures - September 2008 - TTCI R&D (Page 38) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 39) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 40) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 41) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 42) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 43) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 44) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 45) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 46) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 47) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 48) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 49) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 50) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 51) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 52) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 53) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 54) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 55) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 56) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 57) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 58) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 59) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 60) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 61) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 62) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 63) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 64) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 65) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 66) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 67) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 68) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 69) Railway Track & Structures - September 2008 - People (Page 70) Railway Track & Structures - September 2008 - People (Page 71) Railway Track & Structures - September 2008 - People (Page 72) Railway Track & Structures - September 2008 - Sales Representatives (Page 73) Railway Track & Structures - September 2008 - Advertisers Index (Page 74) Railway Track & Structures - September 2008 - Advertisers Index (Page 75) Railway Track & Structures - September 2008 - Professional Directory (Page 76) Railway Track & Structures - September 2008 - Classified Advertising (Page 77) Railway Track & Structures - September 2008 - Classified Advertising (Page 78) Railway Track & Structures - September 2008 - Classified Advertising (Page 79) Railway Track & Structures - September 2008 - Chicago Perspective (Page 80) Railway Track & Structures - September 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - September 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.