Railway Track & Structures - September 2008 - (Page 52) Bridge rehab McMurray was basically served by an army of trucks consuming vast quantities of $5.00-a-gallon diesel. Transportation costs were driving up the prices of everything from bread to milk. CN has had to work fast while orchestrating a small army of contractors to complete the high-priority work before the snow flies. This typically happens by late October. The original rail line to Fort McMurray was opened in 1924 to serve the timber industry and related businesses. With boom and bust cycles, the railroad continued to serve the fledgling mining industry, but it lacked the capacity to support the Syncrude mine, the world’s largest, which began operating in 1978. With stagnant oil prices and expensive extraction methods, the The upgrades to these structures are focused on replacing a high percentage of caps, stringers and ties, with some posting of substandard piling as well. (Photo courtesy Osmose Railroad Services, Inc.) oil sands were more of a curiosity than a world player in the global market. By the late 1990s, the ANY had had a succession of owners, but no one wanted to commit the estimated $100 million to provide reliable heavy-haul capabilities, until now. Unexpected challenge “This was an unexpected challenge to start the New Year with,” said Albert Lim, senior bridge engineer for CN. “The first priority was to inspect the line in the dead of winter to help determine the priorities. A more detailed bridge inspection was then conducted in the spring that expanded on our list of bridge repairs.” CN had identified two bridge contractors to begin the task of upgrading 37 timber bridges for 286,000-pound or better capabilities: Ruskin Construction, Ltd., out of Grande Prairie, Alta., and Osmose Railroad Services, Inc., from Madison, Wis., (operating as NorthStar Structural Contractors in Canada). They were selected based on their safety records, production levels and their ability to undertake the unknown. While the contractors examined the scope of work before them, CN stockpiled the timber and related hardware in select locations for 52 Railway Track & Structures September 2008 www.rtands.com http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - September 2008 Railway Track & Structures - September 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Larry Etherton Rounds Out Successful Term as President of AREMA Remote Bridges Present Challenges New Mexico Rail Runner Express Making Tracks for Santa Fe Products and Literature People Calendar Sales Representatives Advertisers Index Website Directory Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - September 2008 Railway Track & Structures - September 2008 - Railway Track & Structures - September 2008 (Page Cover1) Railway Track & Structures - September 2008 - Railway Track & Structures - September 2008 (Page Cover2) Railway Track & Structures - September 2008 - Contents (Page 1) Railway Track & Structures - September 2008 - Contents (Page 2) Railway Track & Structures - September 2008 - Contents (Page 3) Railway Track & Structures - September 2008 - Contents (Page 4) Railway Track & Structures - September 2008 - Industry Today (Page 5) Railway Track & Structures - September 2008 - Industry Today (Page 6) Railway Track & Structures - September 2008 - Supplier News (Page 7) Railway Track & Structures - September 2008 - Supplier News (Page 8) Railway Track & Structures - September 2008 - Supplier News (Page 9) Railway Track & Structures - September 2008 - Supplier News (Page 10) Railway Track & Structures - September 2008 - Supplier News (Page 11) Railway Track & Structures - September 2008 - Supplier News (Page 12) Railway Track & Structures - September 2008 - Supplier News (Page 13) Railway Track & Structures - September 2008 - Supplier News (Page 14) Railway Track & Structures - September 2008 - AREMA News (Page 15) Railway Track & Structures - September 2008 - AREMA News (Page 16) Railway Track & Structures - September 2008 - AREMA News (Page 17) Railway Track & Structures - September 2008 - AREMA News (Page 18) Railway Track & Structures - September 2008 - AREMA News (Page 19) Railway Track & Structures - September 2008 - AREMA News (Page 20) Railway Track & Structures - September 2008 - AREMA News (Page 21) Railway Track & Structures - September 2008 - AREMA News (Page 22) Railway Track & Structures - September 2008 - AREMA News (Page 23) Railway Track & Structures - September 2008 - AREMA News (Page 24) Railway Track & Structures - September 2008 - AREMA News (Page 25) Railway Track & Structures - September 2008 - AREMA News (Page 26) Railway Track & Structures - September 2008 - AREMA News (Page 27) Railway Track & Structures - September 2008 - AREMA News (Page 28) Railway Track & Structures - September 2008 - AREMA News (Page 29) Railway Track & Structures - September 2008 - AREMA News (Page 30) Railway Track & Structures - September 2008 - AREMA News (Page 31) Railway Track & Structures - September 2008 - AREMA News (Page 32) Railway Track & Structures - September 2008 - NRC News (Page 33) Railway Track & Structures - September 2008 - NRC News (Page 34) Railway Track & Structures - September 2008 - NRC News (Page 35) Railway Track & Structures - September 2008 - NRC News (Page 36) Railway Track & Structures - September 2008 - TTCI R&D (Page 37) Railway Track & Structures - September 2008 - TTCI R&D (Page 38) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 39) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 40) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 41) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 42) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 43) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 44) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 45) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 46) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 47) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 48) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 49) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 50) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 51) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 52) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 53) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 54) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 55) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 56) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 57) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 58) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 59) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 60) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 61) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 62) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 63) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 64) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 65) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 66) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 67) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 68) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 69) Railway Track & Structures - September 2008 - People (Page 70) Railway Track & Structures - September 2008 - People (Page 71) Railway Track & Structures - September 2008 - People (Page 72) Railway Track & Structures - September 2008 - Sales Representatives (Page 73) Railway Track & Structures - September 2008 - Advertisers Index (Page 74) Railway Track & Structures - September 2008 - Advertisers Index (Page 75) Railway Track & Structures - September 2008 - Professional Directory (Page 76) Railway Track & Structures - September 2008 - Classified Advertising (Page 77) Railway Track & Structures - September 2008 - Classified Advertising (Page 78) Railway Track & Structures - September 2008 - Classified Advertising (Page 79) Railway Track & Structures - September 2008 - Chicago Perspective (Page 80) Railway Track & Structures - September 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - September 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.