Railway Track & Structures - September 2008 - (Page 77) PRODUCTS AND SERVICES NEW & USED EQUIPMENT M/W Equipment Sale/Rent 1999 Mark IV Tamper, 2003 System V, V4.10, Surface fit, Smart I/O CALL! 1997 Mark IV Tamper, 2003 System V, V4.10, Surface fit, Smart I/O CALL! 1995 Mark IV Tamper, 2007 System V, V4.10, Surface fit, Smart I/O CALL! (4) 1993 Mark IV Tampers, System V, 4.10, Smart I/O, Surface fit, Laser CALL! Remanufactured Mark III ECTR-130G Tamper, four wheel drive, combo clamp CALL! (7) 1996 - 1983 Mark III, ECTR-130G Tampers, combo clamp, 4 wheel drive, AC CALL! (2) STM-XLC Switch Tamper w/surfacing & lining capability! CALL! (2) STM Switch Tampers, no jacks. Enclosed cabs. Nice machines! CALL! (16) Fairmont Tamper Mark I,II, ES, ES-TDAG`, EA, EAS, JRM Tampers available! CALL! (5) Harsco TR-10/TR-1’s Tie Remover/Inserters, 1998,1996,1993 Models & Older CALL! NORDCO 2008 Factory Remanufactured Auto-Lift Automatic Rail Lifter CALL! Knox Kershaw KBR-900 Ballast Regulator, Detroit 4-53T, AC CALL! (3) Kershaw / RTW Tie Cranes & Bridge Cranes. Some w/enclosed cabs & AC CALL! Racine Dual Anchor Spreaders and Dual Anchor Adjusters CALL! (5) Teleweld Rail Heaters w/vibrators, self propelled CALL! REESE WHAT CAN WE DO FOR YOU? • Track construction and maintenance • On-track tree trimming and brushcutting • Storm and flood cleanup and debris removal • Tie distribution and removal • Hi-rail equipment sales and rental Box 298 • Mercersburg, PA 17236 (717) 328-5211 • FAX (717) 328-9541 USED DMF HI-RAIL GEAR FOR SALE WELDER & INDUSTRIAL PRINTED CIRCUIT BOARD REPAIR Innovat Corporation * Marion, VA USA 800-626-1887 * www.innovatcorp.com * ESAB® HOBART® L-TEC® LINCOLN® MILLER® and more… Authorized Lincoln Electric Warranty Service Center & Parts Distributor. K. W. Reese, Inc. Lots more Equipment & Parts! Check out our website, e-mail or call for more details! (All of the above equipment is located in Illinois.) JER OVERHAUL INC./NEWMAN MACHINERY WEBSITE: www.newmanmachiner y.com E-MAIL: mofwman@cox.net SALES & RENTAL Tel# (602) 952-0035 • Fax# (602) 952-6026 PARTS & SERVICE: Tel# (217) 268-4823 • Fax# (217) 268-4813 (A NORDCO COMPANY) Railroad Ready Trucks Available For Sale Or Lease Call Today For Your Custom Build Needs See Our Ad On Page 5 Of This Issue Fleet Body Equipment - Call Toll Free 877-323-7278 EMPLOYMENT Ranked #1 in Transportation by ENR magazine, DMJM Harris is always searching for new talent. Advertise in the RT&S classified & professional directory Diane Okon PHONE For more information on career opportunities, please contact: jane.griffin@dmjmharris.com. www.dmjmharris.com (312) 683-5022 • FAX (312) 683-0131 • E-MAIL dokon@sbpub-chicago.com www.rtands.com Railway Track & Structures September 2008 77 http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - September 2008 Railway Track & Structures - September 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Larry Etherton Rounds Out Successful Term as President of AREMA Remote Bridges Present Challenges New Mexico Rail Runner Express Making Tracks for Santa Fe Products and Literature People Calendar Sales Representatives Advertisers Index Website Directory Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - September 2008 Railway Track & Structures - September 2008 - Railway Track & Structures - September 2008 (Page Cover1) Railway Track & Structures - September 2008 - Railway Track & Structures - September 2008 (Page Cover2) Railway Track & Structures - September 2008 - Contents (Page 1) Railway Track & Structures - September 2008 - Contents (Page 2) Railway Track & Structures - September 2008 - Contents (Page 3) Railway Track & Structures - September 2008 - Contents (Page 4) Railway Track & Structures - September 2008 - Industry Today (Page 5) Railway Track & Structures - September 2008 - Industry Today (Page 6) Railway Track & Structures - September 2008 - Supplier News (Page 7) Railway Track & Structures - September 2008 - Supplier News (Page 8) Railway Track & Structures - September 2008 - Supplier News (Page 9) Railway Track & Structures - September 2008 - Supplier News (Page 10) Railway Track & Structures - September 2008 - Supplier News (Page 11) Railway Track & Structures - September 2008 - Supplier News (Page 12) Railway Track & Structures - September 2008 - Supplier News (Page 13) Railway Track & Structures - September 2008 - Supplier News (Page 14) Railway Track & Structures - September 2008 - AREMA News (Page 15) Railway Track & Structures - September 2008 - AREMA News (Page 16) Railway Track & Structures - September 2008 - AREMA News (Page 17) Railway Track & Structures - September 2008 - AREMA News (Page 18) Railway Track & Structures - September 2008 - AREMA News (Page 19) Railway Track & Structures - September 2008 - AREMA News (Page 20) Railway Track & Structures - September 2008 - AREMA News (Page 21) Railway Track & Structures - September 2008 - AREMA News (Page 22) Railway Track & Structures - September 2008 - AREMA News (Page 23) Railway Track & Structures - September 2008 - AREMA News (Page 24) Railway Track & Structures - September 2008 - AREMA News (Page 25) Railway Track & Structures - September 2008 - AREMA News (Page 26) Railway Track & Structures - September 2008 - AREMA News (Page 27) Railway Track & Structures - September 2008 - AREMA News (Page 28) Railway Track & Structures - September 2008 - AREMA News (Page 29) Railway Track & Structures - September 2008 - AREMA News (Page 30) Railway Track & Structures - September 2008 - AREMA News (Page 31) Railway Track & Structures - September 2008 - AREMA News (Page 32) Railway Track & Structures - September 2008 - NRC News (Page 33) Railway Track & Structures - September 2008 - NRC News (Page 34) Railway Track & Structures - September 2008 - NRC News (Page 35) Railway Track & Structures - September 2008 - NRC News (Page 36) Railway Track & Structures - September 2008 - TTCI R&D (Page 37) Railway Track & Structures - September 2008 - TTCI R&D (Page 38) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 39) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 40) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 41) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 42) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 43) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 44) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 45) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 46) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 47) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 48) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 49) Railway Track & Structures - September 2008 - Larry Etherton Rounds Out Successful Term as President of AREMA (Page 50) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 51) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 52) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 53) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 54) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 55) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 56) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 57) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 58) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 59) Railway Track & Structures - September 2008 - Remote Bridges Present Challenges (Page 60) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 61) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 62) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 63) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 64) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 65) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 66) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 67) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 68) Railway Track & Structures - September 2008 - New Mexico Rail Runner Express Making Tracks for Santa Fe (Page 69) Railway Track & Structures - September 2008 - People (Page 70) Railway Track & Structures - September 2008 - People (Page 71) Railway Track & Structures - September 2008 - People (Page 72) Railway Track & Structures - September 2008 - Sales Representatives (Page 73) Railway Track & Structures - September 2008 - Advertisers Index (Page 74) Railway Track & Structures - September 2008 - Advertisers Index (Page 75) Railway Track & Structures - September 2008 - Professional Directory (Page 76) Railway Track & Structures - September 2008 - Classified Advertising (Page 77) Railway Track & Structures - September 2008 - Classified Advertising (Page 78) Railway Track & Structures - September 2008 - Classified Advertising (Page 79) Railway Track & Structures - September 2008 - Chicago Perspective (Page 80) Railway Track & Structures - September 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - September 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.