Railway Track & Structures - October 2007 - (Page 37) Risk management Managing risk boosts track safety Improving track safety with new-generation risk management tools reduces accidents substantially and adds to effective service life of track materials. by Allan M. Zarembski, Ph.D., P.E., FASME and Vice President and General Manager Joseph W. Palese, PE, MSCE, MBA Senior Director Engineering and Technology, ZETA-TECH: A Harsco Track Technologies Business Unit Figure 1. FRA-reported track-caused derailments, 2004-06. s railroads continue to work to reduce track-caused derailments, a new generation of innovative risk management techniques has been introduced to help railroads locate and identify potential derailment sites.1 These new techniques focus on the derailment causes themselves and develop specific risk management tools that quantify and analyze the “risk” for each key derailment or accident area. This has led to the development of risk-based tools to identify high-risk locations in the track and provide guidance for improved inspection and/or preventive maintenance to reduce that level of risk. This is accomplished by quantifying the specific level of risk and analyzing those factors that increase or decrease this “risk” for each key track failure modes. Track-caused derailments represent 40 percent of all FRA reported derailments.2 A As seen in Figure 1, the major failure types identified under the track-caused derailment category are broken rails, track geometry, turnout, and roadbed. In each of these cause areas, research has resulted in new risk-based tools aimed at helping maintenance officers pinpoint potential derailment location and take action to reduce the risk of a derailment. These include risk-based tools that look at: • Broken-rail risk: To quantify the risk of occurrence of a broken rail/broken-rail derailment with a focus on adjusting ultrasonic test schedules to reduce that risk. • Track geometry defect risk: To quantify the risk of occurrence of a critical geometry defect (FRA violation) with a focus on adjusting track geometry car test schedules to reduce that risk. • Vehicle/track geometry risk: To identify and prioritize locations with track geometry conditions that have a high potential for vehicle/track geometry-related derailments. • Turnout condition: To quantify the condition of a switch (turnout), calculate a level of risk and provide prioritized ranking to the railroad for maintenance and safety intervention. • Track buckling risk: To identify and prioritize locations of high potential buckling risk for follow-up maintenance action. Broken-rail risk management Broken-rail derailments represent a major track-caused derailment category with a high potential for injury, death and damage due to the sudden and potentially catastrophic nature of this failure. As can be seen in Figure 1, FRA statistics show that 350 to 400 derailments a year occur, with reported costs on the order of $100 million. In addition, Railway Track & Structures October 2007 37 www.rtands.com http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - October 2007 Railway Track & Structures - October 2007 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Crossties by the Billions Provide Essentials for Full Support Modern Tools Manage Risk M/W Challenges: Better Management of Thermal Forces in CWR TTCI Celebrates 25 Years as Facility, 10 as Part of AAR Products and Literature People Calendar Sales Representatives Website Directory Advertisers Index Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - October 2007 Railway Track & Structures - October 2007 - Railway Track & Structures - October 2007 (Page Cover1) Railway Track & Structures - October 2007 - Railway Track & Structures - October 2007 (Page Cover2) Railway Track & Structures - October 2007 - Contents (Page 1) Railway Track & Structures - October 2007 - Contents (Page 2) Railway Track & Structures - October 2007 - On Track (Page 3) Railway Track & Structures - October 2007 - On Track (Page 4) Railway Track & Structures - October 2007 - Industry Today (Page 5) Railway Track & Structures - October 2007 - Industry Today (Page 6) Railway Track & Structures - October 2007 - Supplier News (Page 7) Railway Track & Structures - October 2007 - Supplier News (Page 8) Railway Track & Structures - October 2007 - Supplier News (Page 9) Railway Track & Structures - October 2007 - AREMA News (Page 10) Railway Track & Structures - October 2007 - AREMA News (Page 11) Railway Track & Structures - October 2007 - AREMA News (Page 12) Railway Track & Structures - October 2007 - AREMA News (Page 13) Railway Track & Structures - October 2007 - AREMA News (Page 14) Railway Track & Structures - October 2007 - AREMA News (Page 15) Railway Track & Structures - October 2007 - NRC News (Page 16) Railway Track & Structures - October 2007 - NRC News (Page 17) Railway Track & Structures - October 2007 - NRC News (Page 18) Railway Track & Structures - October 2007 - NRC News (Page 19) Railway Track & Structures - October 2007 - NRC News (Page 20) Railway Track & Structures - October 2007 - TTCI R&D (Page 21) Railway Track & Structures - October 2007 - TTCI R&D (Page 22) Railway Track & Structures - October 2007 - TTCI R&D (Page 23) Railway Track & Structures - October 2007 - TTCI R&D (Page 24) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 25) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 26) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 27) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 28) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 29) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 30) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 31) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 32) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 33) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 34) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 35) Railway Track & Structures - October 2007 - Crossties by the Billions Provide Essentials for Full Support (Page 36) Railway Track & Structures - October 2007 - Modern Tools Manage Risk (Page 37) Railway Track & Structures - October 2007 - Modern Tools Manage Risk (Page 38) Railway Track & Structures - October 2007 - Modern Tools Manage Risk (Page 39) Railway Track & Structures - October 2007 - Modern Tools Manage Risk (Page 40) Railway Track & Structures - October 2007 - Modern Tools Manage Risk (Page 41) Railway Track & Structures - October 2007 - M/W Challenges: Better Management of Thermal Forces in CWR (Page 42) Railway Track & Structures - October 2007 - M/W Challenges: Better Management of Thermal Forces in CWR (Page 43) Railway Track & Structures - October 2007 - M/W Challenges: Better Management of Thermal Forces in CWR (Page 44) Railway Track & Structures - October 2007 - M/W Challenges: Better Management of Thermal Forces in CWR (Page 45) Railway Track & Structures - October 2007 - TTCI Celebrates 25 Years as Facility, 10 as Part of AAR (Page 46) Railway Track & Structures - October 2007 - TTCI Celebrates 25 Years as Facility, 10 as Part of AAR (Page 47) Railway Track & Structures - October 2007 - TTCI Celebrates 25 Years as Facility, 10 as Part of AAR (Page 48) Railway Track & Structures - October 2007 - TTCI Celebrates 25 Years as Facility, 10 as Part of AAR (Page 49) Railway Track & Structures - October 2007 - TTCI Celebrates 25 Years as Facility, 10 as Part of AAR (Page 50) Railway Track & Structures - October 2007 - People (Page 51) Railway Track & Structures - October 2007 - Sales Representatives (Page 52) Railway Track & Structures - October 2007 - Website Directory (Page 53) Railway Track & Structures - October 2007 - Advertisers Index (Page 54) Railway Track & Structures - October 2007 - Professional Directory (Page 55) Railway Track & Structures - October 2007 - Classified Advertising (Page 56) Railway Track & Structures - October 2007 - Classified Advertising (Page 57) Railway Track & Structures - October 2007 - Classified Advertising (Page 58) Railway Track & Structures - October 2007 - Classified Advertising (Page 59) Railway Track & Structures - October 2007 - Chicago Perspective (Page 60) Railway Track & Structures - October 2007 - Chicago Perspective (Page Cover3) Railway Track & Structures - October 2007 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.