Railway Track & Structures - October 2008 - (Page 32) CROSSTIE REPORT concrete ties. This starts with examining raw materials to optimize our concrete tie mix formulas. To improve rail seat abrasion, we are looking at epoxy and other polymer coatings, as well as new types of concrete additives. We also remain committed to explore the most cost-effective way to provide fully captive fastening systems and investigate competitive fastening systems and the components used in the systems. Our goal is to recommend an optimum solution for our customers’ needs. And we continue to look into dual or two block concrete tie systems,” said Haugh. Rocla Concrete Tie, Inc., says the majority of its business comes from Class 1 railroads and when the railroads cut back on capital expenditures, the results trickled down to suppliers, as well. “With high gasoline prices, transit agencies are looking at more projects,” said Al Smith, manager of sales at Rocla. “We have also seen an increase in demand from track contractors.” NARSTCO says it continues to see an increase in business and its steel ties and turnout tie set design are developing a proven success record in the railroad industry. “We have numerous steel ties in main line, shortline and major intermodal tracks, all over the country for more than 10 years,” said John Fox, vice president sales at NARSTCO. “Comments by a local roadmaster, who has one of these yards, said the ties ‘look like new’.” Dynamic Composites, LLC, manufactures an engineered composite tie that incorporates steel, concrete and plastic composite components. According to Chuck Cadwell, general manager of Dynamic Composites, the tie’s material make-up better equips it to handle heavier weight loads. Cadwell added that although the company still feels that they are fighting for a spot within the industry, railroads Steel, plastics and composites 2008 are willing to listen after learning of the tie’s special design. “The company took many engineering considerations with combining these three ‘green’ materials and feel they have created the best performing tie on the market today,” said Cadwell. “It was tough for the industry to accept a new product. Now that they see we’re a company with longevity and understand what the product can do for them, they’re opening up to us.” Recycle Technologies International manufactures PermaTie™, a recycled plastic composite tie, used by Class 1s and the U.S. Army. The company notes that demand has been greater than production, which is leading to expansion plans in 2009. “Composite crossties will, for sometime, remain more expensive than comparable treated hardwoods. However, Class 1 railroads appear to understand the value of composite ties for certain 32 Railway Track & Structures October 2008 www.rtands.com RTS1008 p27-37-crossties.indd 32 10/1/08 4:09:27 PM http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - October 2008 Railway Track & Structures - October 2008 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Railroads Building Solid Foundation for More Capacity with Crossties Safety in High Density Areas M/W Challenges: CN Places New Bridge in Only Six Hours Products and Literature People Calendar Website Directory Advertisers Index Sales Representatives Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - October 2008 Railway Track & Structures - October 2008 - Railway Track & Structures - October 2008 (Page Cover1) Railway Track & Structures - October 2008 - Railway Track & Structures - October 2008 (Page Cover2) Railway Track & Structures - October 2008 - Contents (Page 1) Railway Track & Structures - October 2008 - Contents (Page 2) Railway Track & Structures - October 2008 - On Track (Page 3) Railway Track & Structures - October 2008 - On Track (Page 4) Railway Track & Structures - October 2008 - Industry Today (Page 5) Railway Track & Structures - October 2008 - Industry Today (Page 6) Railway Track & Structures - October 2008 - Supplier News (Page 7) Railway Track & Structures - October 2008 - Supplier News (Page 8) Railway Track & Structures - October 2008 - Supplier News (Page 9) Railway Track & Structures - October 2008 - AREMA News (Page 10) Railway Track & Structures - October 2008 - AREMA News (Page 11) Railway Track & Structures - October 2008 - AREMA News (Page 12) Railway Track & Structures - October 2008 - AREMA News (Page 13) Railway Track & Structures - October 2008 - AREMA News (Page 14) Railway Track & Structures - October 2008 - AREMA News (Page 15) Railway Track & Structures - October 2008 - AREMA News (Page 16) Railway Track & Structures - October 2008 - AREMA News (Page 17) Railway Track & Structures - October 2008 - NRC News (Page 18) Railway Track & Structures - October 2008 - NRC News (Page 19) Railway Track & Structures - October 2008 - NRC News (Page 20) Railway Track & Structures - October 2008 - TTCI R&D (Page 21) Railway Track & Structures - October 2008 - TTCI R&D (Page 22) Railway Track & Structures - October 2008 - TTCI R&D (Page 23) Railway Track & Structures - October 2008 - TTCI R&D (Page 24) Railway Track & Structures - October 2008 - TTCI R&D (Page 25) Railway Track & Structures - October 2008 - TTCI R&D (Page 26) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 27) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 28) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 29) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 30) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 31) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 32) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 33) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 34) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 35) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 36) Railway Track & Structures - October 2008 - Railroads Building Solid Foundation for More Capacity with Crossties (Page 37) Railway Track & Structures - October 2008 - Safety in High Density Areas (Page 38) Railway Track & Structures - October 2008 - Safety in High Density Areas (Page 39) Railway Track & Structures - October 2008 - Safety in High Density Areas (Page 40) Railway Track & Structures - October 2008 - Safety in High Density Areas (Page 41) Railway Track & Structures - October 2008 - Safety in High Density Areas (Page 42) Railway Track & Structures - October 2008 - M/W Challenges: CN Places New Bridge in Only Six Hours (Page 43) Railway Track & Structures - October 2008 - M/W Challenges: CN Places New Bridge in Only Six Hours (Page 44) Railway Track & Structures - October 2008 - M/W Challenges: CN Places New Bridge in Only Six Hours (Page 45) Railway Track & Structures - October 2008 - People (Page 46) Railway Track & Structures - October 2008 - People (Page 47) Railway Track & Structures - October 2008 - Calendar (Page 48) Railway Track & Structures - October 2008 - Website Directory (Page 49) Railway Track & Structures - October 2008 - Sales Representatives (Page 50) Railway Track & Structures - October 2008 - Professional Directory (Page 51) Railway Track & Structures - October 2008 - Classified Advertising (Page 52) Railway Track & Structures - October 2008 - Classified Advertising (Page 53) Railway Track & Structures - October 2008 - Classified Advertising (Page 54) Railway Track & Structures - October 2008 - Classified Advertising (Page 55) Railway Track & Structures - October 2008 - Chicago Perspective (Page 56) Railway Track & Structures - October 2008 - Chicago Perspective (Page Cover3) Railway Track & Structures - October 2008 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.